Summary

PRRWF20250217
Retaining Wall
Permit(s) Issued
BRADLEY HEIGHTS SS LLC
New
CONSTRUCTION OF RETAINING WALL/ WALL B - BRADLEY HEIGHTS APARTMENTS
02/11/2025
07/24/2025
01/20/2026

Locations

Property
0419036006

Address
202 27TH AVE SE, Unit: 1, PUYALLUP, WA 98374

206 27TH AVE SE, PUYALLUP, WA 98374

Reviews

Documents Returned For Corrections

Date Returned Name
07/08/2025 SITE PLAN (Stamped)
07/08/2025 Timberlane_BradleyHeights_RW_rev03 (Stamped)
Review Type Outcome Est. Completion Date Completed
Planning Review Approved 07/14/2025 07/08/2025
Engineering Review Approved 07/14/2025 07/07/2025
Engineering Civil Review Approved 07/14/2025 07/03/2025
Building Review Approved 07/14/2025 07/02/2025
Planning Review Approved 06/02/2025 05/30/2025
Engineering Review Failed 06/02/2025 05/29/2025
Engineering Civil Review Approved 06/02/2025 05/23/2025
Building Review Approved 06/02/2025 05/23/2025
Planning Review Approved 03/06/2025 03/05/2025
Engineering Review Failed 03/06/2025 03/05/2025
Engineering Civil Review Approved 03/06/2025 02/26/2025
Building Review Approved 03/06/2025 02/21/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Building Permit Fee $209.25 $209.25 Paid 07/23/2025
Building Plan Review Fee $136.01 $136.01 Paid 02/11/2025
Resubmittal Fee $180.00 $180.00 Paid 05/21/2025
Resubmittal Fee $180.00 $180.00 Paid 07/23/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Footing/Setback Inspection Pending
Shannon King ((253) 840-6684)
Building Final Inspection Pending
Shannon King ((253) 840-6684)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Miscellaneous Condition Resolved Submit With Civil Permit Application
Development & Permitting Services
Figure 2 from Page 7/28 from the Retaining Wall Design Letter dated Nov 19th, 2024 should be reprinted in the white space on G-14 of the civil plans. This detail clearly shows the fabric liner, the drainage area, and the proper slopes. Our City Detail for rock retaining walls requires a 6 inch perf pipe, but the block manufacturer and the Geotech both call for four inch, so that will be allowed. • The plans need to match the Retaining Wall Design Letter. The design letter doesn’t say that there is a 3:1 maximum backslope, but it does say that 3:1 is the design assumption for their analysis. Provide a response to the memos request if all backslopes cannot be made 3:1 or less. • Ensure drainage pipes are designed to discharge to appropriate locations
Engineering Commercial Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard commercial conditions: - Prior to starting site work request an inspection for erosion and sediment. - Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20240845 for approved method of control. - Steps shall be taken to prevent drainage onto adjacent lots. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. - Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Miscellaneous Condition Resolved Prior to Issuance
Engineering Division
The retaining wall building permit cannot be issued until civil permit PRCCP20240845 is issued first. The two permit plans must match. It is the applicant's responsibility to coordinate the building permit submissions with the status of the civil permit to avoid redundant reviews and permit fees. [Yianni Charitou @ 03/05/2025 11:03 AM]
Miscellaneous Condition Open Prior to Completion
Engineering Division
The retaining wall building permit cannot be closed until demolition permits PRDE20231242 and PRDE20230753 are closed first. [Yianni Charitou @ 03/05/2025 11:19 AM]

Related Permit & Planning Applications

Reference Number Status Type
PRDE20230753 Closed Demolition
PRFUP20230968 Permit(s) Issued Franchise Utility Permit
PROLP20231232 Closed Oversized Load/House Move Permit
PRDE20231242 Closed Demolition
PRUSR20231244 Canceled Utility Service Repair/PRIVATE PROPERTY ONLY
PRUSR20231267 Closed Utility Service Repair/PRIVATE PROPERTY ONLY
PRCNC20240278 Permit(s) Issued Commercial - New Construction
PRMU20240279 Ready for Issuance Residential - New Multi-Unit
PRMU20240280 Ready for Issuance Residential - New Multi-Unit
PRMU20240281 Ready for Issuance Residential - New Multi-Unit
PRMU20240282 Ready for Issuance Residential - New Multi-Unit
PRMU20240283 Ready for Issuance Residential - New Multi-Unit
PRMU20240284 Ready for Issuance Residential - New Multi-Unit
PRMU20240285 Ready for Issuance Residential - New Multi-Unit
PRMU20240286 Ready for Issuance Residential - New Multi-Unit
PRCCP20240845 Permit(s) Issued Civil Construction Permit
PRAMR20241578 Canceled Alternative Methods / Materials Request
PRAMR20250141 Closed Alternative Methods / Materials Request
PRRWF20250214 Permit(s) Issued Retaining Wall
PRRWF20250216 Permit(s) Issued Retaining Wall
PRRWF20250233 Permit(s) Issued Retaining Wall
PRRWF20250235 Permit(s) Issued Retaining Wall
PRRWF20250237 Permit(s) Issued Retaining Wall
P-19-0105 Expired Pre-Application
P-21-0098 File Closed Pre-Application
PLDDG20220021 File Closed Downtown Design Review
PLPSP20220049 File Closed Preliminary Site Plan

Documents & Images

Date Uploaded File Type Name
02/11/2025 Receipt Receipt for transaction:2025-000289
05/21/2025 Receipt Receipt for transaction:2025-000980
07/08/2025 Plans SITE PLAN (Stamped)
07/08/2025 Plans Timberlane_BradleyHeights_RW_rev03 (Stamped)
07/23/2025 Receipt Receipt for transaction:2025-001464
07/24/2025 Permit Permit - Detailed
07/24/2025 Letter Permit Job Card