CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCNC20260047


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCNC20260047
Commercial - New Construction
Submittals Incomplete
CRP/TP BRADLEY HEIGHTS OWNER LLC
New
Construct small recycling enclosure R4&R5 as part of Bradley Heights Apartment project
01/14/2026

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Completeness Check Incomplete 02/09/2026 01/30/2026
Traffic Completeness Check VOID 02/09/2026 01/30/2026
Building Completeness Check Incomplete 02/09/2026 01/26/2026
Planning Completeness Check Pending 02/09/2026

Fees

Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $0.00 Not payable Not Paid
Planning Landscape Review Fee $300.00 $0.00 Not payable Not Paid
Building Permit Fee $181.25 $0.00 Not payable Not Paid
Planning Building Permit Fee $120.00 $0.00 Not payable Not Paid
Building Plan Review Fee $117.81 $0.00 Not payable Not Paid
WA State Building Code Council Fee (Commercial) $25.00 $0.00 Not payable Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS. 2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE. 3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE. 4. KNOX BOXES, WHEN REQUIRED, SHALL BE INSTALLED USUALLY TO THE RIGHT OF THE MAIN FRONT DOOR AND NO HIGHER THAN 6 FEET OFF OF THE GROUND. ONLY HINGED KNOX BOXES SHALL BE USED. KNOX BOXES AND KEY SWITCHES CAN BE ORDERED ONLINE AT THE "KNOX COMPANY" 5. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.
Engineering Commercial Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard commercial conditions: - Prior to starting site work request an inspection for erosion and sediment. - Occupancy will not be granted until all civil work associated with PRCCPXXXXXXXX has been completed and approval has been provided. - Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of Puyallup’s stormwater fact sheet. or See approved civil plan PRCCPXXXXXXXX for approved method of control. - Stormwater control of roof downspouts required. Attached to the site plan is a typical infiltration system you may choose to follow. - Steps shall be taken to prevent drainage onto adjacent lots. - All commercial development, multi-family, mixed use facility, or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required, or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District. - Due to the proximity of this property to a secondary water source (i.e. Clarks Creek, Meeker Ditch, etc.) the applicant shall install a reduced pressure backflow assembly per city standards. - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The applicant is responsible to schedule all utility inspections prior to backfilling - Curb, gutter, sidewalk, and approach must be poured per city standards. - Driveway approach must be a minimum of 30' wide. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. - Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - A separate right of way permit must be obtained is required by a licensed and bonded contractor to make the sanitary sewer main tap and or a water service connection. - Water meter box grade may have to be adjusted, at owners’ expense, due to the grade of the proposed driveway. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. - This property lies within a regulated flood zone. both residential and non-residential must meet the following requirements in accordance with PMC 21.07: (For AE Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated to a minimum of one foot or more above the base flood elevation. Please note additional freeboard increases safety and can reduce insurance premiums. (For AO Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated 1-foot or more above the depth number on the firm (minimum of 2-feet above the highest natural grade). - Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of net less than 1 square inch for every square foot of enclosed area subject to flooding shall be provided. the bottom of openings shall be no higher than 1 foot above grade (PMC 21.07.060(2)). - If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities. - No fill shall be placed unless specifically shown on the approved site plan. after site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f). - No occupancy permit shall be issued until such time as a federal emergency management agency flood elevation certificate is completed based on "finished construction" and reviewed and accepted by the City of Puyallup.

Related Permit & Planning Applications

Reference Number Status Type
PRDE20230753 Closed Demolition
PRFUP20230968 Permit(s) Issued Franchise Utility Permit
PROLP20231232 Closed Oversized Load/House Move Permit
PRDE20231242 Closed Demolition
PRUSR20231244 Canceled Utility Service Repair/PRIVATE PROPERTY ONLY
PRUSR20231267 Closed Utility Service Repair/PRIVATE PROPERTY ONLY
PRCNC20240278 Permit(s) Issued Commercial - New Construction
PRMU20240279 Permit(s) Issued Residential - New Multi-Unit
PRMU20240280 Permit(s) Issued Residential - New Multi-Unit
PRMU20240281 Permit(s) Issued Residential - New Multi-Unit
PRMU20240282 Permit(s) Issued Residential - New Multi-Unit
PRMU20240283 Permit(s) Issued Residential - New Multi-Unit
PRMU20240284 Permit(s) Issued Residential - New Multi-Unit
PRMU20240285 Permit(s) Issued Residential - New Multi-Unit
PRMU20240286 Permit(s) Issued Residential - New Multi-Unit
PRCCP20240845 In Plan Check Civil Construction Permit
PRAMR20241578 Canceled Alternative Methods / Materials Request
PRAMR20250141 Closed Alternative Methods / Materials Request
PRRWF20250214 Permit(s) Issued Retaining Wall
PRRWF20250216 Permit(s) Issued Retaining Wall
PRRWF20250217 Permit(s) Issued Retaining Wall
PRRWF20250233 Permit(s) Issued Retaining Wall
PRRWF20250235 Permit(s) Issued Retaining Wall
PRRWF20250237 Permit(s) Issued Retaining Wall
PRFS20251283 Permit(s) Issued Fire Sprinklers
PRFS20251315 Permit(s) Issued Fire Sprinklers
PRFS20251469 Permit(s) Issued Fire Sprinklers
PRFS20251470 Permit(s) Issued Fire Sprinklers
PRFS20251577 Permit(s) Issued Fire Sprinklers
PRFA20251591 Permit(s) Issued Fire Alarms
PRFS20251594 Permit(s) Issued Fire Sprinklers
PRFS20251597 Permit(s) Issued Fire Sprinklers
PRFA20251711 Submittals Incomplete Fire Alarms
PRPO20260015 Returned for Correction Pool/Hot Tub
PRCNC20260042 Submittals Incomplete Commercial - New Construction
PRCNC20260043 Submittals Incomplete Commercial - New Construction
PRCNC20260044 Submittals Incomplete Commercial - New Construction
PRCNC20260045 Submittals Incomplete Commercial - New Construction
PRCNC20260048 Submittals Incomplete Commercial - New Construction
P-19-0105 Expired Pre-Application
P-21-0098 File Closed Pre-Application
PLDDG20220021 File Closed Downtown Design Review
PLPSP20220049 File Closed Preliminary Site Plan

Documents & Images

Date Uploaded File Type Name
01/15/2026 Letter Incomplete Submittal Notice


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.