Planning Application Status
P-21-0142
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Date Returned | Name |
---|---|
06/06/2022 | P-21-0142 SEPA Environmental Checklist signed_12.09.21 (Flattened) |
Review Type | Outcome | Est. Completion Date | Completed |
---|---|---|---|
Engineering Traffic Review | Revisions Required | 01/28/2022 | 05/05/2022 |
Bryan Roberts
((253) 841-5542)
Send Email
|
|||
See Document Markup
Carried Forward
02/28/2023
1ft no access easement required along lot 1 & 2 frontage. 253.76ft
|
|||
See Document Markup
Carried Forward
02/28/2023
Existing roundabout may require pedestrian improvements that may require larger easement
|
|||
See Document Markup
Carried Forward
02/28/2023
City may require applicant to pursue pedestrian access to Pioneer Crossing. Peds are unlikely to walk all the way to the existing Shaw Rd traffic signal to enter the adjacent development.
|
|||
See Document Markup
Carried Forward
02/28/2023
City may require applicant to provide on-site pedestrian access to 25th St SE. This may also include pedestrian improvements on 25th St SE.
|
|||
See Document Markup
Carried Forward
02/28/2023
ROW dedication on 25th St SE
|
|||
See Document Markup
Carried Forward
02/28/2023
|
|||
Engineering Review | Revisions Required | 01/28/2022 | 03/29/2022 |
Mark Higginson
((253) 841-5559)
Send Email
|
|||
See Document Markup
Carried Forward
02/28/2023
In accordance with City codes and standards a proposed project must provide sufficient technical information to allow a finding that the proposed stormwater design is viable. The information contained in this storm report is insufficient for such a finding...see comments associated with Minimum Requirement 4, 7, and 8. In addition, the following specific comments outlined in the City's pre-application letter dated September 28, 2020 were not addressed:a) "The storm report indicates that a large portion of the site surface runoff is being redirected to discharge eastward into Shaw Road. However, Minimum Requirement 4 (MR4) requires the developed site to maintain existing drainage patterns and discharge at the natural location of the site. Based on the existing topographic contours, the natural discharge location for the parcel is at the NW corner of the project (not Shaw Road) which is also the Deer Creek stream corridor (a fish bearing water body). -Revise the preliminary stormwater design to comply with conditions described in MR4 or provide justification for releasing to Shaw Road. -Any documentation in support of changing the natural discharge location shall include appropriate environmental studies to ensure there are no adverse impacts to the stream corridor."b) "There are two Category IV wetlands on the existing parcel which do not appear to be addressed in the introductory storm report. At time of Preliminary Site Plan application, the applicant shall provide a preliminary analysis indicating that the proposed project will comply with Minimum Requirement 8 (MR8), Wetlands Protection."c) "The introductory storm report does not provide any information on how the project intends to comply with Minimum Requirement 7 (MR7), Flow Control. At the time of Preliminary Site Plan application, the applicant shall clarify the stormwater design approach and provide preliminary sizing calculations for any retention/detention facility(ies)." [Storm Report; Page 2]
|
|||
See Document Markup
Carried Forward
02/28/2023
In accordance with City codes and standards a proposed project must provide sufficient technical information to allow a finding that the proposed stormwater design is viable. The information contained in this storm report is insufficient for such a finding...see comments associated with Minimum Requirement 4, 7, and 8. In addition, the following specific comments outlined in the City's pre-application letter dated September 28, 2020 were not addressed:
|
|||
See Document Markup
Carried Forward
02/28/2023
a) "The storm report indicates that a large portion of the site surface runoff is being redirected to discharge eastward into Shaw Road. However, Minimum Requirement 4 (MR4) requires the developed site to maintain existing drainage patterns and discharge at the natural location of the site. Based on the existing topographic contours, the natural discharge location for the parcel is at the NW corner of the project (not Shaw Road) which is also the Deer Creek stream corridor (a fish bearing water body). -Revise the preliminary stormwater design to comply with conditions described in MR4 or provide justification for releasing to Shaw Road. -Any documentation in support of changing the natural discharge location shall include appropriate environmental studies to ensure there are no adverse impacts to the stream corridor."
|
|||
See Document Markup
Carried Forward
02/28/2023
b) "There are two Category IV wetlands on the existing parcel which do not appear to be addressed in the introductory storm report. At time of Preliminary Site Plan application, the applicant shall provide a preliminary analysis indicating that the proposed project will comply with Minimum Requirement 8 (MR8), Wetlands Protection."
|
|||
See Document Markup
Carried Forward
02/28/2023
c) "The introductory storm report does not provide any information on how the project intends to comply with Minimum Requirement 7 (MR7), Flow Control. At the time of Preliminary Site Plan application, the applicant shall clarify the stormwater design approach and provide preliminary sizing calculations for any retention/detention facility(ies)."
|
|||
See Document Markup
Carried Forward
02/28/2023
[Storm Report; Page 2]
|
|||
See Document Markup
Carried Forward
02/28/2023
Add comment about the site being previously filled under permit E19-0156. [Storm Report; Section 1.0]
|
|||
See Document Markup
Carried Forward
02/28/2023
Runoff must be released at the site's natural discharge location per Minimum Requirement 4. Per the storm report associated with Permit E19-0156, runoff flows from the SE corner of the site to the NW corner via sheet flow and an interceptor ditch along the north property line. [Storm Report; Section 1.0]
|
|||
See Document Markup
Carried Forward
02/28/2023
Please include flow chart in this report. [Storm Report; Section 2.0]
|
|||
See Document Markup
Carried Forward
02/28/2023
Revise...the predeveloped condition prior to recent fill activity was from east-to-west and must be maintained per MR4. If a portion of the site, prior to fill placement, actually discharged to the east, then the site should be analyzed as a split basin. [Storm Report; Section 2.0]
|
|||
See Document Markup
Carried Forward
02/28/2023
There are two wetlands on the property which must be protected per Min. Reqt 8. Prior to short plat approval, provide commentary and supporting calculations on how this will be accomplished. [Storm Report; Section 2.0]
|
|||
See Document Markup
Carried Forward
02/28/2023
a) Revise per MR4 comments and the fact that the site discharges to a regulated stream and regulated wetlands. b) Clarify if any runon from upstream (south) properties. c) At time of civil application, provide a more thorough analysis per City Std 201.2(2). [Storm Report; Section 3.0]
|
|||
See Document Markup
Carried Forward
02/28/2023
Onsite Flow Control facilities req'd. [Storm Report; Section 2.0]
|
|||
See Document Markup
Carried Forward
02/28/2023
See Min. Reqt 4 comments. [Storm Report; Section 2.0]
|
|||
See Document Markup
Carried Forward
02/28/2023
This Master Plan indicates fill being placed within the regulated floodplain. Any development activity in the designated floodplain, including the placement of fill, shall comply with PMC 21.07 Flood Damage Protection, particularly the compensatory storage provisions. Quantify the amount of fill to be placed in the floodplain and identify the compensatory storage area, volume, and location. If the compensatory storage area is within the limits of the existing parcel, identify on the short plat document. If the compensatory storage area is outside the existing parcel, identify the parcel as well as the property owner, and record an easement or other document subject to City Attorney approval which will preserve the compensatory storage area in perpetuity. [Storm Report; Appendix A]
|
|||
See Document Markup
Carried Forward
02/28/2023
These calculations only indicate undetained discharge to the offsite downstream system. Provide preliminary stormwater calculations that comply with MR7 and MR8 that would support a finding that the proposed stormwater design is viable and complies with the Ecology Manual.. [Storm Report; Appendix B]
|
|||
See Document Markup
Carried Forward
02/28/2023
In accordance with City codes and standards a proposed project must provide sufficient technical information to allow a finding that the proposed stormwater design is viable. The information contained in this storm report is insufficient for such a finding...see comments associated with Minimum Requirement 4, 7, and 8. In addition, the following specific comments outlined in the City's Pre-Application letter dated September 28, 2020 were not addressed:
|
|||
See Document Markup
Carried Forward
02/28/2023
Add Application Number to Document (P-21-0142). [Plans; Sheet 1]
|
|||
See Document Markup
Carried Forward
02/28/2023
Typo [Plans; Sheet 1]
|
|||
See Document Markup
Carried Forward
02/28/2023
Replace with City Note 6 (or similar) to avoid having to record the Facilities Agreement prior to Short Plat approval. [Plans; Sheet 1]
|
|||
See Document Markup
Carried Forward
02/28/2023
Typo [Plans; Sheet 1]
|
|||
See Document Markup
Carried Forward
02/28/2023
Addressing shall be provided by EngineeringServices prior to short plat approval. [Plans; Sheet 1]
|
|||
See Document Markup
Carried Forward
02/28/2023
Add Application Number to Document (P-21-0142). [Plans; Sheet 2]
|
|||
See Document Markup
Carried Forward
02/28/2023
Reference this item on the Short Plat document. [Plans; Sheet 2]
|
|||
See Document Markup
Carried Forward
02/28/2023
1. No Building Permits will be issued for Lot 1 or Lot 2 until utility and road improvements to include curb, gutter, sidewalk, roadway base, pavement, water, sanitary sewer, storm infrastructure and street lighting are approved and permitted by Development Services Engineering for all street frontages.
|
|||
See Document Markup
Carried Forward
02/28/2023
3. Portions of the site are located within a Special Flood Hazard Area as determined by the National Flood Insurance Program Community Panel Number 53053C0342E, dated March 7, 2017 and subsequent LOMR 18-10-0841P dated April 4, 2019. Development of the property shall adhere to the City's Floodplain Management Regulations contained in PMC Chapter 21.07.
|
|||
See Document Markup
Carried Forward
02/28/2023
4. A preliminary storm drainage plan is on file for this short plat. No Building Permits will be issued for any lots of this short plat until a permanent storm drainage plan is approved and permitted by Development Services Engineering.
|
|||
See Document Markup
Carried Forward
02/28/2023
2. Occupancy for Lot 1 or Lot 2 will not be approved until such time as the required utility and road improvements are constructed by the property owner and accepted by the City.
|
|||
See Document Markup
Carried Forward
02/28/2023
5. The owner of Lots 1 through 2 shall record a Stormwater Management & BMP Facilities Agreement, on a form provided by the City, prior to final building permit approval and/or Occupancy.
|
|||
See Document Markup
Carried Forward
02/28/2023
6. NOTICE: This short plat will contain a private storm drainage system. Private storm drainage systems are the sole responsibility of the owners, successors, and assignees for all lots being served by the private storm drainage system. Responsibility includes, but is not limited to, constructing, maintaining, repairing, and allowing City inspection of the private storm system in accordance with a separate recorded stormwater management facilities agreement to be filed with the Pierce County Auditor.
|
|||
See Document Markup
Carried Forward
02/28/2023
7. No permanent structures(s) shall be erected within any public easement area(s). Permanent structure(s) shall mean any concrete foundation, concrete slab, wall, rockery, pond, stream, building, deck, overhanging structure, fill material, tree, recreational sport court, carport, shed, private utility, fence, or other site improvement that restricts or unreasonably interferes with the need to access or construct utilities in said easements(s). Permanent structure(s) shall not mean improvements such as flowers, ground cover and shrubs less than 3-feet in height, lawn grass, asphalt paving, gravel, or other similar site improvements that do not prevent the access of men, material, and machinery across, along, and within the said easement area. Land restoration within the said easement area due to construction, shall mean planting grass seed or grass sod, asphalt paving, or gravel unless otherwise determined by the City of Puyallup.8. This property is subject to Gravity Sewer Latecomer fee to be paid prior to building permit issuance for either Lot 1 or Lot 2. Reference AFN 2021107061306.
|
|||
See Document Markup
Carried Forward
02/28/2023
1. No Building Permits will be issued for Lot 1 or Lot 2 until utility and road improvements to include curb, gutter, sidewalk, roadway base, pavement, water, sanitary sewer, storm infrastructure and street lighting are approved and permitted by Development Services Engineering for all street frontages.
|
|||
See Document Markup
Carried Forward
02/28/2023
Indicate Private Street Maintenance Agreement AFN 201911270861 [Plans; Sheet 3]
|
|||
See Document Markup
Carried Forward
02/28/2023
Add Application Number to Document (P-21-0142). [Plans; Sheet 8]
|
|||
See Document Markup
Carried Forward
02/28/2023
Add: "AFN 9601180513" [Plans; Sheet 3]
|
|||
See Document Markup
Carried Forward
02/28/2023
201210305003 [Plans; Sheet 3]
|
|||
See Document Markup
Carried Forward
02/28/2023
Add:AFN 200409085002 [Plans; Sheet 3]
|
|||
See Document Markup
Carried Forward
02/28/2023
Add Application Number to Document (P-21-0142). [Plans; Sheet 4]
|
|||
See Document Markup
Carried Forward
02/28/2023
Revise to "Regulated Stream" [Plans; Sheet 4]
|
|||
See Document Markup
Carried Forward
02/28/2023
Revise to "Regulated Stream" [Plans; Sheet 4]
|
|||
See Document Markup
Carried Forward
02/28/2023
Revise to "Regulated Stream" [Plans; Sheet 4]
|
|||
See Document Markup
Carried Forward
02/28/2023
Add Application Number to Document (P-21-0142). [Plans; Sheet 5]
|
|||
See Document Markup
Carried Forward
02/28/2023
Identify ROW [Plans; Sheet 5]
|
|||
See Document Markup
Carried Forward
02/28/2023
Identify Property Line [Plans; Sheet 5]
|
|||
See Document Markup
Carried Forward
02/28/2023
Franklin Puyallup, LLC per AFN 201705300235 [Plans; Sheet 5]
|
|||
See Document Markup
Carried Forward
02/28/2023
Callout bearings and distances associated with easement area. [Plans; Sheet 6]
|
|||
See Document Markup
Carried Forward
02/28/2023
Add Application Number to Document (P-21-0142). [Plans; Sheet 6]
|
|||
See Document Markup
Carried Forward
02/28/2023
Identify ROW [Plans; Sheet 6]
|
|||
See Document Markup
Carried Forward
02/28/2023
Identify Property Line [Plans; Sheet 6]
|
|||
See Document Markup
Carried Forward
02/28/2023
Add Application Number to Document (P-21-0142). [Plans; Sheet 7]
|
|||
See Document Markup
Carried Forward
02/28/2023
Identify ROW [Plans; Sheet 7]
|
|||
See Document Markup
Carried Forward
02/28/2023
Identify Property Line [Plans; Sheet 7]
|
|||
See Document Markup
Carried Forward
02/28/2023
Add Application Number to Document (P-21-0142). [Plans; Sheet 8]
|
|||
See Document Markup
Carried Forward
02/28/2023
Callout 10-ft ROW dedication [Plans; Sheet 8]
|
|||
See Document Markup
Carried Forward
02/28/2023
201210305003 [Plans; Sheet 8]
|
|||
See Document Markup
Carried Forward
02/28/2023
Add: "AFN 9601180513" [Plans; Sheet 8]
|
|||
See Document Markup
Carried Forward
02/28/2023
Add:AFN 200409085002 [Plans; Sheet 8]
|
|||
See Document Markup
Carried Forward
02/28/2023
Verify Callout...S01d06'52"W? [Plans; Sheet 8]
|
|||
See Document Markup
Carried Forward
02/28/2023
Min. Reqt 8 applies. [Plans; Sheet 8]
|
|||
See Document Markup
Carried Forward
02/28/2023
Min. Reqt 8 applies. [Plans; Sheet 8]
|
|||
See Document Markup
Carried Forward
02/28/2023
The Master Plan shown in Appendix A of the preliminary storm report indicates fill being placed within the regulated floodplain. Any development activity in the designated floodplain, including the placement of fill, shall comply with PMC 21.07 Flood Damage Protection, particularly the compensatory storage provisions. Quantify the amount of fill to be placed in the floodplain and identify the compensatory storage area, volume, and location. If the compensatory storage area is within the limits of the existing parcel, identify on the short plat document. If the compensatory storage area is outside the existing parcel, identify the parcel as well as the property owner, and record an easement or other document subject to City Attorney approval which will preserve the compensatory storage area in perpetuity. [Plans; Sheet 8]
|
|||
See Document Markup
Carried Forward
02/28/2023
2. Occupancy for Lot 1 or Lot 2 will not be approved until such time as the required utility and road improvements are constructed by the property owner and accepted by the City.
|
|||
See Document Markup
Carried Forward
02/28/2023
3. Portions of the site are located within a Special Flood Hazard Area as determined by the National Flood Insurance Program Community Panel Number 53053C0342E, dated March 7, 2017 and subsequent LOMR 18-10-0841P dated April 4, 2019. Development of the property shall adhere to the City's Floodplain Management Regulations contained in PMC Chapter 21.07.
|
|||
See Document Markup
Carried Forward
02/28/2023
4. A preliminary storm drainage plan is on file for this short plat. No Building Permits will be issued for any lots of this short plat until a permanent storm drainage plan is approved and permitted by Development Services Engineering.
|
|||
See Document Markup
Carried Forward
02/28/2023
5. The owner of Lots 1 through 2 shall record a Stormwater Management & BMP Facilities Agreement, on a form provided by the City, prior to final building permit approval and/or Occupancy.
|
|||
See Document Markup
Carried Forward
02/28/2023
6. NOTICE: This short plat will contain a private storm drainage system. Private storm drainage systems are the sole responsibility of the owners, successors, and assignees for all lots being served by the private storm drainage system. Responsibility includes, but is not limited to, constructing, maintaining, repairing, and allowing City inspection of the private storm system in accordance with a separate recorded stormwater management facilities agreement to be filed with the Pierce County Auditor.
|
|||
See Document Markup
Carried Forward
02/28/2023
7. No permanent structures(s) shall be erected within any public easement area(s). Permanent structure(s) shall mean any concrete foundation, concrete slab, wall, rockery, pond, stream, building, deck, overhanging structure, fill material, tree, recreational sport court, carport, shed, private utility, fence, or other site improvement that restricts or unreasonably interferes with the need to access or construct utilities in said easements(s). Permanent structure(s) shall not mean improvements such as flowers, ground cover and shrubs less than 3-feet in height, lawn grass, asphalt paving, gravel, or other similar site improvements that do not prevent the access of men, material, and machinery across, along, and within the said easement area. Land restoration within the said easement area due to construction, shall mean planting grass seed or grass sod, asphalt paving, or gravel unless otherwise determined by the City of Puyallup.
|
|||
See Document Markup
Carried Forward
02/28/2023
8. This property is subject to Gravity Sewer Latecomer fee to be paid prior to building permit issuance for either Lot 1 or Lot 2. Reference AFN 2021107061306. [Plans; Sheet 2]
|
|||
See Document Markup
Carried Forward
02/28/2023
a) "The storm report indicates that a large portion of the site surface runoff is being redirected to discharge eastward into Shaw Road. However, Minimum Requirement 4 (MR4) requires the developed site to maintain existing drainage patterns and discharge at the natural location of the site. Based on the existing topographic contours, the natural discharge location for the parcel is at the NW corner of the project (not Shaw Road) which is also the Deer Creek stream corridor (a fish bearing water body). -Revise the preliminary stormwater design to comply with conditions described in MR4 or provide justification for releasing to Shaw Road. -Any documentation in support of changing the natural discharge location shall include appropriate environmental studies to ensure there are no adverse impacts to the stream corridor."
|
|||
See Document Markup
Carried Forward
02/28/2023
b) "There are two Category IV wetlands on the existing parcel which do not appear to be addressed in the introductory storm report. At time of Preliminary Site Plan application, the applicant shall provide a preliminary analysis indicating that the proposed project will comply with Minimum Requirement 8 (MR8), Wetlands Protection."
|
|||
See Document Markup
Carried Forward
02/28/2023
c) "The introductory storm report does not provide any information on how the project intends to comply with Minimum Requirement 7 (MR7), Flow Control. At the time of Preliminary Site Plan application, the applicant shall clarify the stormwater design approach and provide preliminary sizing calculations for any retention/detention facility(ies)." [Storm Report; Page 2]
|
|||
Planning Review | Revisions Required | 01/28/2022 | 03/02/2022 |
Rachael N. Brown
((253) 770-3363)
Send Email
|
|||
See Document Markup
Outstanding
01/24/2022
A type II, 15-foot vegetative buffer shall apply to all arterial and collector roadways as designated in the comprehensive plan. Said buffers shall be placed in either a into either a native vegetation protection easement (NVPE) or dedicated NVPE tract with appropriate protection language., Short Plat, Sheet 8 of 8
|
|||
See Document Markup
Outstanding
01/24/2022
|
|||
See Document Markup
Outstanding
01/24/2022
|
|||
See Document Markup
Outstanding
01/27/2022
Add cross walk over Deer Creek to sidewalk across the street, Short Plat, Sheet 4 of 8
|
|||
See Document Markup
Outstanding
01/27/2022
Street trees will be required back of walk wherever sidewalks are required, Short Plat, Sheet 4 of 8
|
|||
See Document Markup
Outstanding
01/27/2022
|
|||
See Document Markup
Outstanding
01/27/2022
|
|||
Planning Review | Revisions Required | 01/28/2022 | 03/02/2022 |
Rachael N. Brown
((253) 770-3363)
Send Email
|
|||
Other/Miscellaneous
Carried Forward
02/28/2023
Street Trees. In order to further implementation of the city’s street tree program, street trees are required to be installed in all plats in accordance with Chapter 11.28 PMC, Street Trees. Proposed subdivisions under this title shall dedicate suitable area for street trees in accordance with city standards for the applicable roadway.
|
|||
Other/Miscellaneous
Carried Forward
02/28/2023
The following critical area notes need to be included on the face of the plat document: Lot 2 contains wetland areas and protective wetland buffers. A note shall be included on the face of the plat for each affected lot indicating: “This lot contains a wetland and/or wetland buffer that is protected by federal, state and local regulations. A wetland is a permanently, semi-permanently, or seasonally flooded area of land with a distinct ecosystem based on hydrology, hydric soils, and vegetation adapted for life in water saturated soils. Wetlands provide numerous benefits to the natural environment including water quality, flood control, wildlife habitat, shoreline stability, and aesthetic values. Since the 1780s, Washington has lost 31 percent of its wetland areas, from 1.35 million acres to 938,000 acres, contributing to loss of flood storage and habitat areas. Wetlands are critical to the overall health of watersheds and property owners are key for protecting, restoring, and managing our state's remaining wetland resources. Modification of land or vegetation and/or encroachment/conversion of these areas is strictly prohibited without prior government approval.”
Lot 2 contains a fish and wildlife conservation area. A note shall be included on the face of the plat for each affected lot indicating: “This lot contains a fish and wildlife habitat area that is protected by federal, state and local regulations. These areas serve a critical role in sustaining needed habitats and species for the functional integrity of the ecosystem, and which, if altered, may reduce the likelihood that the species will persist over the long term. Property owners are key for protecting, restoring, and managing our state's remaining habitat areas. Modification of land or vegetation and/or encroachment/conversion of these areas is strictly prohibited without prior government approval.”
Lot 2 contains a 100-year floodplain areas. A note shall be included on the face of the plat for each affected lot indicating: “This lot contains a 100-year floodplain areas, containing a 1% chance every year of flooding/inundation that could affect life, property, structures and improvements. All development and land modifications of floodplain areas requires city approval and consistency with the National Flood Insurance Program (NFIP), the Endangered Species Act (ESA), critical areas ordinance (PMC 21.06) and flood protection ordinance (PMC 21.07), as well as any other applicable state, federal and local laws. Modification of land or vegetation, especially land filling that could reduce flood storage capacity, and/or encroachment/conversion of these areas is strictly prohibited without prior government approval.”
Lots 1 and 2 contain critical aquifer recharge areas. A critical aquifer recharge area note for each affected lot shall indicate: “The site is within a high susceptibility/critical aquifer recharge area. Uses and activities on this site shall comply with the city’s critical area ordinance (Puyallup Municipal Code 21.06, Article XI). Activities that do not cause degradation of ground water quality and will not adversely affect the recharging of the aquifer may be permitted in a critical aquifer recharge area and do not require preparation of a critical area report; provided, that they comply with the city storm water management regulations and other applicable local, state and federal regulations.”
Lots 1 and 2 contain a volcanic hazard area. A volcanic hazard area note for each lot affected shall indicate: “The site is within a volcanic hazard area. In the event of an eruption of Mt. Rainier, the site is expected to be inundated by pyroclastic flows, lava flows, debris avalanche, inundation by debris flows, lahars, mudflows, or related flooding resulting from volcanic activities. Uses and activities on this site shall comply with the city’s critical area ordinance (Puyallup Municipal Code 21.06, Article XII, section 21.06.1260, or succeeding section, regarding volcanic hazard areas.”
|
|||
Other/Miscellaneous
Carried Forward
02/28/2023
Vegetation buffers: a type II, 15-foot vegetative buffer shall apply to all arterial and collector roadways as designated in the comprehensive plan. Both Shaw Rd and 25th St SE meet this criteria, however since 25th St SE already includes a stream buffer, the 15-foot vegetative buffer will only be required at the Shaw road frontage. Buffers along city roadways shall include clumps of evergreen and deciduous trees intermixed with shrubs and no more than 25 percent turf grass;
When suitable natural vegetation is present, it shall be retained, and if necessary, enhanced with native plant material. Any proposed enhancement shall be set forth in a landscape plan, approved by the development services director or designee, and the landscaping installed prior to final plat approval; and
When suitable natural vegetation is not present, a landscape plan shall be prepared reflecting the use of native plant material, approved by the development services director or designee, and the landscaping installed prior to final plat approval. All native vegetation buffers shall be placed into either a native vegetation protection easement (NVPE) or dedicated NVPE tract with appropriate protection language, as approved by the director or designee, shown on the face of the plat.
|
|||
Other/Miscellaneous
Carried Forward
02/28/2023
Critical Area Tract: Deer creek and associated buffer; wetlands and associated buffer shall each be placed in separate 'native growth protection area" tracts. Critical area tracts shall be designated as native growth protection areas and shall be recorded on all documents of title of record for all affected lots. Critical area tracts shall be designated on the face of the plat or recorded drawing in a format approved by the city attorney. The designation shall include the following restrictions:
- An assurance that native vegetation within the growth protection area will be preserved;
-The right of the city to enforce the terms of the restriction; and
-The city will require that that the critical area tract be dedicated to the city, which assures the ownership, maintenance, and protection of the tract in accordance with PMC 19.12.070(4).
|
|||
Other/Miscellaneous
Carried Forward
02/28/2023
Short plat document contains too many extraneous sheets and details for final recorded document. Reduce pages and details to only those items listed in Puyallup Municipal Code 19.02.100(2). Engineering details
|
|||
Other/Miscellaneous
Carried Forward
02/28/2023
Public pedestrian access: A 15' wide public ROW access shall be provided connecting Shaw Rd with 25th ST SE. This 15' wide access shall be improved as a public pedestrian route.
|
|||
Other/Miscellaneous
Carried Forward
02/28/2023
The City is interested in acquiring all the property on this parcel that is located in the 1% annual chance flood hazard mapped floodplain area. Please indicate if you are interested in donating this area to the City. If you are interested in donating this property to the City, please contact Paul Marrinan, Civil Engineer, at 253-841-5498 or PMarrinan@puyallupwa.gov
|
|||
Other/Miscellaneous
Carried Forward
02/28/2023
Floodplain Habitat Assessment: Critical area report does not include analysis of floodplain impacts or FEMA habitat assessment criteria
|
|||
External Agency Review | Revisions Required | 01/28/2022 | 03/02/2022 |
Rachael N. Brown
((253) 770-3363)
Send Email
|
|||
Other/Miscellaneous
Carried Forward
02/28/2023
Changes to wetland report required. See Critical Area Review Letter 1 for list of required changes.
|
|||
Other/Miscellaneous
Carried Forward
02/28/2023
See comment letters on SEPA noticing from Dept. of Ecology and Nisqually Tribe in document cache.
|
|||
SEPA & NOA See comment letters on SEPA noticing from Dept. of Ecology and SEPA & NOA See comment letters on SEPA noticing from Dept. of Ecology and Nisqually Tribe in document cache. SEPA & NOA See comment letters on SEPA noticing from Dept. of Ecology and Nisqually Tribe in document cache on City portal. | |||
Building Review | No Comments | 01/28/2022 | 01/27/2022 |
David Leahy
((253) 435-3618)
Send Email
|
|||
Fire Review | No Comments | 01/28/2022 | 01/26/2022 |
David Drake
((253) 864-4171)
Send Email
|
|||
Planning Review | VOID | 01/28/2022 | 01/25/2022 |
Rachael N. Brown
((253) 770-3363)
Send Email
|
|||
Fire Review | VOID | 12/14/2021 | |
Rachael N. Brown
((253) 770-3363)
Send Email
|
|||
Fire-FCO (PLAN REVIEW) - not complete as of data conversion | |||
Building Review | Pending | 04/11/2023 | |
David Leahy
((253) 435-3618)
Send Email
|
|||
Fire Review | Pending | 04/11/2023 | |
David Drake
((253) 864-4171)
Send Email
|
|||
Engineering Review | Pending | 04/11/2023 | |
Mark Higginson
((253) 841-5559)
Send Email
|
|||
Engineering Traffic Review | Pending | 04/11/2023 | |
Bryan Roberts
((253) 841-5542)
Send Email
|
|||
Planning Review | Pending | 04/11/2023 | |
Rachael N. Brown
((253) 770-3363)
Send Email
|
|||
External Agency Review | Pending | 04/11/2023 | |
Rachael N. Brown
((253) 770-3363)
Send Email
|
|||
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
None | $0.00 | $0.00 | $0.00 | |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Totals: | $0.00 | $0.00 | $0.00 |
Application(s) will not be processed until outstanding fees have been paid in full.
$0.00
There are no hearings for this planning application.
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Miscellaneous Condition | Open | Development & Permitting Services | |||
:
Comply with 2018 IFC
Comply with C.O.P. Engineering codes and standards
|
|||||
Miscellaneous Condition | Open | Engineering Division | Standard Conditions | ||
:
See previous engineering comments contained in the City's response letter, dated September 28, 2020, associated with Pre-Application P-20-0086 for other conditions applicable to the proposed project.
|
Reference Number | Status | Type |
---|---|---|
P-20-0086 | Expired | Pre-Application |
L-20-0003 | File Closed | Comprehensive Plan Amendment |