Summary

P-21-0099
DOS LAGOS MIXED USE PROJECT
Preliminary Site Plan
Preliminary Site Plan
Under Review
09/08/2021
OSLIC HOLDINGS LLC

Locations

Property
0419102118

* Address
3910 5TH ST SE

Application Types

Preliminary Site Plan

Administrative
Under Review

Reviews

Review Type Outcome Est. Completion Date Completed
Engineering Review Revisions Required 02/22/2023 03/30/2023
Mark Higginson ((253) 841-5559)   Send Email
BLTR - Access parking
Resolved
02/16/2023


Other/Miscellaneous
Outstanding
03/30/2023


WATER: 1. Water to Parcel C is to be provided by Fruitland Mutual Water Company. The applicant shall provide a water availability letter prior to site plan approval for the individual sites. (NOTE: Applicant Response Letter dated December 27, 2022 states the Water Availability Letter was submitted with the second review materials, but it was not in the documentation provided. Please email directly.)
Other/Miscellaneous
Outstanding
03/30/2023


STORMWATER: Parcel B and Parcel C Preliminary Drainage Report Shared Comments: 1. Per the conditions of the Short Plat APN 201912305002, Short Plat APN 201912305005, as well as State vesting criteria, the proposed projects are not vested to prior stormwater regulations. As a result, the 2019 Ecology Manual applies. Revise accordingly. 2. See additional review comments contained in each Drainage Report (Lot B dated November 2022 and Lot C dated December 2022), make appropriate corrections, and resubmit for further review.
Other/Miscellaneous
Outstanding
03/30/2023


STORMWATER: Parcel C Preliminary Drainage Report Comments: 1. The submitted MR8 Wetland Protection analysis for Lot C did not comply with the Ecology Manual criteria contained in Appendix I-C. In addition, it appears that Method 1 would be applicable to the parcel since there is legal access to the wetland. Prior to Landuse approval, revise the project constraints as necessary to show compliance with MR8. 2. The Ecology Manual also requires that any post-developed flows released above and beyond those necessary for MR8 compliance shall be mitigated per MR5 and MR7 unless infeasible. If determined to be infeasible, the Engineer-of-Record (EoR) shall document why they are unable to meet the requirements of MR5 and MR7 as a result of MR8 compliance (is deep layer infiltration not possible?). 3. Confirm that the composite long-term infiltration rate is a corrected rate as outlined by Ecology, Section V-5.4.
See Document Markup
Outstanding
03/30/2023


Per the conditions of the Short Plat, APN 201912305002, and State vesting criteria, the Project is not vested to prior stormwater regulations. As a result the 2019 Ecology Manual applies. At time of civil application, revise references accordingly. [Storm Report-Lot B; Pg 1 of 16]
See Document Markup
Outstanding
03/30/2023


Incorrect reference...should read P-18-0172 and 201912305002. [Storm Report-Lot B; Pg 4 of 16]
See Document Markup
Outstanding
03/30/2023


Project is not vested, as a result the 2019 Ecology Manual applies. [Storm Report-Lot B; Pg 5 of 16]
See Document Markup
Outstanding
03/30/2023


Use current manual flow chart, Figure 1-3.1. [Storm Report-Lot B; Pg 6 of 16]
See Document Markup
Outstanding
03/30/2023


Per the conditions of the Short Plat, APN 201912305005, and State vesting criteria, the Project is not vested to prior stormwater regulations. As a result the 2019 Ecology Manual applies. At time of civil application, revise references accordingly. [Storm Report-Lot C; Pg 1 of 65]
See Document Markup
Outstanding
03/30/2023


Revise report to comply with Minimum Requirement 8 (MR8)-see comments on Page 8. [Storm Report-Lot C; Pg 1 of 65]
See Document Markup
Outstanding
03/30/2023


Project is not vested, as a result the 2019 Ecology Manual applies. [Storm Report-Lot C; Pg 5 of 65]
See Document Markup
Outstanding
03/30/2023


Use current manual flow chart, Figure 1-3.1. [Storm Report-Lot C; Pg 6 of 65]
See Document Markup
Outstanding
03/30/2023


See comments regarding MR8 compliance (Pg 8 of 65). Any post-developed flows released above and beyond those necessary for MR8 compliance shall be mitigated per MR5 and MR7 unless infeasible. If determined to be infeasible, the EoR must document why they are unable to meet the requirements of MR5 and MR7 (as a result of MR8 compliance). Is deep layer infiltration of the MR8 overflows possible? [Storm Report-Lot C; Pg 7 of 65]
See Document Markup
Outstanding
03/30/2023


At time of civil application, it must be shown that the underlying soils meet treatment criteria (SSC-6). [Storm Report-Lot C; Pg 8 of 65]
See Document Markup
Outstanding
03/30/2023


Per Ecology, after showing MR8 compliance, the project must mitigate for MR5 and MR7 unless infeasible. If determined to be infeasible, the EoR shall document why they are unable to meet the requirements of MR5 and MR7 (as a result of MR8 compliance). [Storm Report-Lot C; Pg 8 of 65]
See Document Markup
Outstanding
03/30/2023


Refer to the 2019 Ecology Manual criteria, App. 1-C. [Storm Report-Lot C; Pg 8 of 65]
See Document Markup
Outstanding
03/30/2023


Per MR8, the applicant must comply with the wetland protection criteria. [Storm Report-Lot C; Pg 8 of 65]
See Document Markup
Outstanding
03/30/2023


It does not appear that Method 2 is the correct approach. The provided EnCo wetland assessment (Appendix E) categorized the wetland as a Category II, Depressional wetland. Per Ecology Appendix I-C.4, Method 1 must be used to verify the hydroperiod protections. [Storm Report-Lot C; Pg 8 of 65]
See Document Markup
Outstanding
03/30/2023


Unless otherwise agreed upon between the City and applicant, revise the preliminary storm report to adhere to current stormwater regulations (2019 Ecology Manual) including MR8 compliance. [Storm Report-Lot C; Pg 8 of 65]
See Document Markup
Outstanding
03/30/2023


Per MR8, the applicant must comply with the wetland protection criteria. [Storm Report-Lot C; Pg 9 of 65]
See Document Markup
Outstanding
03/30/2023


Clarify...value should be multiplied by appropriate correction factors per Ecology Section V-5.4. [Storm Report-Lot C; Pg 9 of 65]
See Document Markup
Outstanding
03/30/2023


See comment associated with MR4, Pg 7 of 65. [Storm Report-Lot C; Pg 14 of 65]
See Document Markup
Outstanding
03/30/2023


See commentst associated with MR4 ( Pg 7 of 65) and MR8 compliance (Pg 8 of 65). [Storm Report-Lot C; Pg 15 of 65]
See Document Markup
Outstanding
03/30/2023


Use permeable pavement for access path and sidewalks unless infeasible. (NOTE: Pathways/Sidewalks are non-pollution generating. [Storm Report-Lot C; Pg 15 of 65]
See Document Markup
Outstanding
03/30/2023


Clarify...value should be multiplied by appropriate correction factors per Ecology Section V-5.4. [Storm Report-Lot C; Pg 53 of 65]
See Document Markup
Outstanding
03/30/2023


Roof Discharge to the regulated wetland must comply with MR8 criteria per Ecology. [Plans-Lot C; Sht C2.2]
See Document Markup
Outstanding
03/30/2023


At time of civil application, no structures (walls, stairs, etc.) shall be constructed over the storm main. [Plans-Lot C; Sht C2.2]
Fire Review No Comments 02/22/2023 02/22/2023
David Drake ((253) 864-4171)   Send Email
Building Review Revisions Required 02/22/2023 02/16/2023
Janelle Montgomery ((253) 770-3328)   Send Email
BLTR - Access parking
Outstanding
02/16/2023


Accessible parking and access to the public way would be required as well as the accessibility requirements to the building. The site plan does not clearly identify required accessible parking. Provide minimum accessible parking including required accessible EV parking at the building. The six EV parking provided off site can contribute to the total quantity of number required. Based on historical timeline of preliminary site plan to a complete building application appears this building permit may be applied for after June 30, 2023. Please be aware July 1, 2023 forward Washington State will adopt the 2021 I-codes with Washington State Amendments and 2021 WSEC. See Section 429 of the 2021 IBC for Electric Vehicle Charging Infrastructure to determine the number of EV parking stalls that will be required under 2021 Code cycle as there are significant changes, reference Table 429.2.
Planning Review Revisions Required 02/22/2023 02/07/2023
Chris Beale ((253) 841-5418)   Send Email
Other/Miscellaneous
Outstanding
02/07/2023


Architectural Design Review Comments from first review have not been addressed. Revised building elevations have not been received. 1. Provide revised building elevations to address the below design review requirements. Please itemize the applicable code requirements in a narrative letter, providing callouts on the elevations and a narrative report from the architect demonstrating compliance with the architectural standards described in the narrative. (PMC 20.52) 2. The design narrative did not address PMC 20.52.015(1) design principles. Please revise the design review narrative to address this code section. 3. Per PMC 20.52.015(2), the use of high-quality building materials shall be incorporated in the building design. The Design Review Board will not consider Hardi plank siding as a high-quality material on street facing elevations. Code is specific about material types. Be prepared to offer a different material type. 4. Per 20.52.025(1), the upper floor stepback of a building three stories or taller shall be a minimum of 10-feet. Alternatively, a total 10-foot step may be accommodated over multiple stories (e.g., seven feet on third floor, three feet on upper floor). In your design response, you stated that you are meeting this through eliminating decks on the upper floors. PMC 20.31.026(15) requires a 10-foot by 8-foot private deck is require for all upper story units. A variance may be required to deviate from PMC 20.31.026(15). Additionally, it has been staff experience that the Design Review Board would not support deviating from the upper floor setbacks through the removal of outdoor private space. Be prepared to offer a different alternative. 5. Per PMC 20.52.025(2)(b), the ground floor of street facing façade shall consist of at least 60 percent visual transparency between 2 feet and 8 feet. I It appears that the southeast facade may be compliant but there are no calculations to confirm compliance. It isn’t clear if the northeast and southwest elevations are also compliant. Revise the drawings as necessary and provide transparency calculation for the northeast, southeast, and southwest building facades. Please note, that as you are addressing the transparency requirements, ensure that the windows are also compliant with PMC 20.52.025(2)(d). 6. PMC 20.52.025(5) applies to blank walls. The provided building elevations do not appear to have areas over 30 feet in length or 400 sq. ft. in area without building articulation or openings. No revision is required at this time, but please review this section as you further develop the building elevations. 7. Per PMC 20.52.025(6), the proposed buildings shall have a minimum of 30 percent of the building façades with a minimum of two exterior materials. PMC requires the use of metal paneling, brick, decorative faux stone, masonry, and masonry veneer for a minimum of 60% of the exterior face, excluding gables, windows, doors, and related trim. Revise drawings as necessary, provide the needed callouts and calculations, and update the design review narrative. 8. Per PMC 20.52.025(6), If the continuous roofline exceeds 50 feet in length on a roofline with slopes of less than three feet vertical to 12 feet horizontal, the following methods shall be used: a. The height of the visible roofline must change at least four feet if the adjacent roof segments are less than 50 feet in length. b. The height of the visible roofline must change at least eight feet if the adjacent roof segments are 50 feet or more in length. c. The length of a sloped or gabled roofline must be at least 20 feet, with a minimum slope of three feet vertical to 12 feet horizontal. The building elevations are missing roof slope callouts to ensure compliance with these standards. Provide revised building elevations to ensure roof modulation compliance.
Other/Miscellaneous
Outstanding
02/07/2023


SEPA Checklist 1. First Review Comment: Please provide a 4’ wide blacktop asphalt pathway from the NE corner of parcel C to the corner of 39th and 5th. Planning is considering this requirement given the wetland parcel A is part of the mixed use site plan with parcel B and C. Second Review Comment: Please show how the pathway shown on drawing C2.0 (sheet 1 of Preliminary Grading, Storm, and Utilities dated 12/13/2022) connects to the corner of 39th and 5th.
Other/Miscellaneous
Outstanding
02/07/2023


2. First Review Comment: Per PMC 20.31.026(3), the front yard setback is 12 feet to 20 feet from Build-to-Area (BTA). Additionally, PMC 20.31.027(2)(c) requires new buildings built 12 feet from right-of-way or 20 feet from right-of-way to accommodate an 8 feet plaza. 4 feet of the plaza may extend into the 12 feet type II landscape buffer. Since the required 8 feet plaza may extend into the landscape buffer by 4 feet, the minimum building setback is considered 16 feet instead of 12 feet, unless the plaza is proposed as an outdoor café seating use. Per PMC 20.31.027(2)(c), Outdoor café seating plaza use is allowed to project into the 12 feet landscaping buffer by 6 feet, which allows a minimum building setback of 14 feet instead of 12 feet. The Lot C building is setback 10-feet from street right-of-way, which is not compliant with the 16-foot setback requirement stated above. Additionally, the 8-foot plaza shall run along the entire width of the building and shall be covered by awning that is at least 6 feet deep. In general, the code is requiring an 8-foot landscaping buffer from public right-of-way, followed by the 8-foot plaza, and then the building being set between 16 and 20 feet. Please revise all site plans to ensure compliance with setback standards and denote on architect plans and landscape plans if any proposed plaza will be used as an outdoor café seating area. Second Review Comment: Drawing C2.2 (Sheet 3 of Preliminary Grading, Storm, and Utilities dated 12/13/2022) shows the building setback line to be 14.00’ from 5th St SE and 14.08’ from 43rd Ave SE. Drawing L-3 (Sheet 3 of Conceptual Landscape Plan dated 8/12/2022) shows the building setback line to be 14’ from 5th St SE and 14’ from 43rd Ave SE. This is not compliant with the 16-foot setback requirement stated in the first review comment. 20.31.027 Site plan design principles.(2)(a) stipulates ‘A pedestrian-oriented plaza space in front of the building at least eight feet deep running the full width of the building. This area shall be covered by awnings covering at least six feet of the plaza space.’. Please show how this standard is being met.
Other/Miscellaneous
Outstanding
02/07/2023


3. First Review Comment: Per PMC 20.31.026(15), each upper floor dwelling unit requires a minimum of 10-foot by 8-foot private open space. Clearly indicate the private open space for each dwelling unit on site plans and provide a narrative describing how the private open space requirements are being met. Second Review Comment: Please submit a floor plan for each level that shows how this standard is being met.
Other/Miscellaneous
Outstanding
02/07/2023


4. First Review Comment: The City GIS shows existing trees located within the development footprint which are not denoted on the site plans, preliminary landscape plans, or other documents. To ensure compliance with Vegetation Management Standards regarding significant tree protection, the planting plan shall denote all existing trees with Diameter-at-Breast Height (DBH) and indicate if the tree is to be removed or retained. If your site includes any significant trees, then you must include a tree risk assessment completed by a certified arborist and provide the critical root protection zone for any retained significant trees on the grading plan. Second Review Comment: Updated landscape plan shows significant trees that will be retained and significant trees that will be removed with development. Please submit a tree risk assessment completed by a certified arborist and provide critical protection zone for any retained significant trees on the grading plan.
Other/Miscellaneous
Outstanding
02/07/2023


5. First Review Comment: Per PMC 25.58.005(2), the perimeter of all sites shall be landscaped the full depth of the required setback or 12 feet, which ever less; however, not less than 6 feet. The following landscape buffers are currently being encroached by off-street parking/paving: d. The Lot B western side yard requires a minimum 6-foot Type III landscape buffer. Second Review Comment: Updated landscape plan does not show landscape buffer on western side yard for Lot B.
Other/Miscellaneous
Outstanding
02/07/2023


6. First Review Comment: Per PMC 25.58.005(2)(a)(ii), all retaining walls shall be setback from any rear or side yard a minimum of 6-feet, and the maximum retaining wall height within 30 feet of side and rear lot lines is 6 feet and shall include a Type I visual barrier landscape buffer. The proposed retaining walls are within 6 feet of lot lines and do not include a Type I visual barrier landscape buffer. Revise plans as necessary. Please note the proposed retaining walls are structures subject to wetland buffer building setback requirements detailed below. Second Review Comment: The revised civil plans show ‘Type III’ land scape buffers. Per the standard listed above ‘A Type I visual barrier landscape buffer shall be provided in front of all retaining walls, in accordance with the city’s vegetation management standards (VMS) manual.’
See Document Markup
Outstanding
02/07/2023


Parking lot island cannot contain civil utilities, relocate. Island must be 15 feet wide min. [planning, sheet C2.2]
See Document Markup
Outstanding
02/07/2023


Does not meet 16 ft min setback [planning, sheet C2.2]
See Document Markup
Outstanding
02/07/2023


Does not meet 16 ft min setback [planning, sheet C2.2]
Planning Review Revisions Required 02/14/2022
Chris Beale ((253) 841-5418)   Send Email
Engineering Traffic Review Revisions Required 12/17/2021 02/08/2022
Bryan Roberts ((253) 841-5542)   Send Email
Other/Miscellaneous
Carried Forward
12/28/2022


See DRT comment letter and Redline markups for more information
Fire Review Revisions Required 12/17/2021 01/14/2022
David Drake ((253) 864-4171)   Send Email
Fire Review VOID 12/14/2021
Katie Baker ((253) 435-3604)   Send Email
Fire-FCO (PLAN REVIEW) - Not completed prior to data conversion
Engineering Traffic Review VOID 12/14/2021
Katie Baker ((253) 435-3604)   Send Email
ENG TRAFFIC - 11.12.21 RESUB 1 : ELEVATIONS FOR C,D,& E-JF - Eden action prior to data conversion
Fire Review Approved 11/17/2021
David Drake ((253) 864-4171)   Send Email
Fire-FCO (PLAN REVIEW) - No comments to latest submittal
Engineering Traffic Review Approved 11/05/2021
David Drake ((253) 864-4171)   Send Email
ENG TRAFFIC - 11.12.21 RESUB 1 : ELEVATIONS FOR C,D,& E-JF
Engineering Traffic Review Approved 10/22/2021
Bryan Roberts ((253) 841-5542)   Send Email
ENG TRAFFIC - 11.12.21 RESUB 1 : ELEVATIONS FOR C,D,& E-JF
Engineering Traffic Review Pending 02/22/2023
Bryan Roberts ((253) 841-5542)   Send Email

Fees

Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid


Application(s) will not be processed until outstanding fees have been paid in full.

$0.00

Meetings

There are no hearings for this planning application.

Conditions

Condition Status Department Category Expiration Date Due Date
Miscellaneous SEPA Condition Open Planning Division SEPA Condition
: Project shall provide an ADA compliant pathway from lot C the NE corner of parcel C to the corner of 39th  and 5th. Planning will implement this requirement given the wetland parcel A is part of the mixed use site  plan with parcel B and C. 
Miscellaneous SEPA Condition Open Planning Division SEPA Condition
: Project shall provide a cultural resource site assessment consistent with DAHP and tribal requirements at the time of civil development permit application.
Miscellaneous SEPA Condition Open Planning Division SEPA Condition
: If Lot A wetland or associated wetland buffer is disturbed by any proposed land disturbance activities (grading, retaining, wall, etc.), a new wetland critical area report may be required if the previous critical area report is more than 5-years old. A new critical area report may alter the wetland buffer widths. A mitigation plan may be required
Miscellaneous Condition Open Engineering Division Submit With Civil Permit Application
: ITEMS REQUIRED PRIOR TO CIVIL PERMIT APPROVAL: Parcel B: 1. As previously noted, parcels, 0419106025 and 0419106024 contain existing stormwater facilities serving the adjacent Parcel 0419102095. Prior to civil application approval, the Dos Lagos project shall meet the following conditions: - Any proposed site improvements shall be located outside of the existing stormwater facilities serving Parcel 0419102095 or, the existing stormwater facilities shall be redesigned and reconstructed to provide equal or better performance. - The applicant shall provide acknowledgement from the ownership of Parcel 0419102095 that any proposed site improvements do not interfere with the use and maintenance of the existing stormwater facilities serving Parcel 0419102095. - The applicant shall execute and record a private stormwater access and maintenance easement in favor of Parcel 0419102095. 2. At time of civil application, infeasibility must be documented for permeable pavement (wet-season hydraulic testing and/or seasonally high groundwater elevation, or other Ecology criteria).
Miscellaneous Condition Open Engineering Division Submit With Civil Permit Application
: ITEMS REQUIRED PRIOR TO OCCUPANCY: Parcel B: 1. Recorded public access and utilities easement between 39th Ave SE and the westerly property limits (use City form). - A DRAFT easement document shall be submitted with the Civil Engineering Permit Application. Parcel C: 1. Recorded public access and utilities easement associated with public stormwater conveyance through the site (use City form). Minimum easement width is 40-ft per current City Standards. - A DRAFT easement document shall be submitted with the Civil Engineering Permit Application.
Miscellaneous Condition Open Engineering Division Submit With Civil Permit Application
: GENERAL: 1. Any proposed retaining walls shall be located outside the ROW on private property. 2. No structures (walls, stairs, etc.) shall be constructed over the top wet utility pipes. 3. The proposed project shall be designed to ensure that landscaping trees are located a minimum of 10-ft from any public utility and any onsite lighting or other permanent structures are located outside the limits of any public utility easement(s). 4. Incorporate 2nd REVIEW comments as noted on the Parcel B Preliminary Plans (Sheets C1.0-C1.2) and Parcel C Preliminary Plans (Sheets C2.0-C2.2). 5. At time of civil application, incorporate previously acknowledged conditions described in DRT Letter 1 dated December 28, 2021.

Related Permit & Planning Applications

Reference Number Status Type
PR20221559 Pending
PR20221560 Pending
P-21-0100 Under Review Preliminary Site Plan
P-20-0088 Expired Pre-Application