CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRMU20241695


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRMU20241695
Residential - New Multi-Unit
Permit(s) Issued
DOCE LLC
New
Construction of a 3- story; 24 unit apartment building. 2ND STREET APARTMENTS
10/31/2024
04/14/2025
10/27/2025

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 05/06/2025 04/10/2025
Fire Review Approved 05/06/2025 04/10/2025
Engineering Review Approved 05/06/2025 04/09/2025
Engineering Traffic Review Approved 05/06/2025 04/09/2025
Building Review Approved 05/06/2025 04/09/2025
Engineering Review Approved 04/24/2025 04/07/2025
Building Review Failed 04/24/2025 04/04/2025
Fire Review Approved 04/24/2025 04/01/2025
Engineering Traffic Review Approved 04/24/2025 04/01/2025
Planning Review Approved 04/24/2025 03/31/2025
Engineering Review Approved 03/25/2025 03/18/2025
Building Review Failed 03/25/2025 03/14/2025
Fire Review Approved 03/25/2025 03/12/2025
Engineering Traffic Review Approved 03/25/2025 03/05/2025
Planning Review Approved 03/25/2025 02/25/2025
Engineering Review Failed 01/29/2025 01/28/2025
Fire Review Failed 01/29/2025 01/27/2025
Building Review Failed 01/29/2025 01/16/2025
Engineering Traffic Review Approved 01/29/2025 01/10/2025
Planning Review Approved 01/29/2025 01/09/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 04/11/2025
Planning Landscape Review Fee $300.00 $300.00 Paid 04/11/2025
Appliance Vent - Separate Fee $230.40 $230.40 Paid 04/11/2025
Exhaust Hood/Range Hood - Residential Fee $338.40 $338.40 Paid 04/11/2025
Exhaust Vent Fan (Bath) Fee $831.90 $831.90 Paid 04/11/2025
Building Permit Fee $16,558.75 $16,558.75 Paid 04/11/2025
Planning Building Permit Fee $120.00 $120.00 Paid 04/11/2025
Garbage Disposal Fee $13.00 $13.00 Paid 04/11/2025
Plumbing Permit Fee $40.00 $40.00 Paid 04/11/2025
Plumbing Fixtures Fee $2,340.00 $2,340.00 Paid 04/11/2025
Water Heater Fee $312.00 $312.00 Paid 04/11/2025
Mechanical Permit Fee $40.00 $40.00 Paid 04/11/2025
Building Plan Review Fee $10,763.19 $10,763.19 Paid 11/01/2024
Plumbing Plan Review Fee $1,758.25 $1,758.25 Paid 11/01/2024
Mechanical Plan Review Fee $936.46 $936.46 Paid 11/01/2024
WA State Building Code Council Fee (Residential) $52.50 $52.50 Paid 04/14/2025
Resubmittal Fee $180.00 $180.00 Paid 02/07/2025
Resubmittal Fee $180.00 $180.00 Paid 03/26/2025
Resubmittal Fee $180.00 $180.00 Paid 04/11/2025
Outstanding Fees Amount Paid Owing Date Paid
Traffic Impact Fee (Commercial) $55,080.00 $0.00 $55,080.00 Not Paid
Park Impact Fee $60,413.62 $0.00 $60,413.62 Not Paid
Water System Development Charge $98,396.46 $0.00 $98,396.46 Not Paid
Sewer System Development Charge $119,629.73 $0.00 $119,629.73 Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$333,519.81    Add Fees to My Cart

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection Pending
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection Pending
Underfloor Inspection Pending
Shannon King ((253) 840-6684)
Block Wall Rebar Inspection Pending
Shannon King ((253) 840-6684)
Shear Wall Inspection Pending
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection Pending
Shannon King ((253) 840-6684)
Plumbing Rough In Inspection Pending
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Pending
Shannon King ((253) 840-6684)
Frame Inspection Pending
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Pending
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Pending
Shannon King ((253) 840-6684)
Gas Test Inspection Pending
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Pending
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection Pending
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection Pending
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection Pending
Shannon King ((253) 840-6684)
Shower Pan Inspection Pending
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection Pending
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs Pending
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection Pending
David Drake ((253) 864-4171)
Engineering Final Inspection Pending
Planning Final Inspection Pending
Fire Final Inspection Pending
David Drake ((253) 864-4171)
Plumbing Final Inspection Pending
Shannon King ((253) 840-6684)
Mechanical Final Inspection Pending
Shannon King ((253) 840-6684)
Building Final Inspection Pending
Shannon King ((253) 840-6684)
Erosion And Sediment Inspection Pending
Energy (Insulation) Inspection Pending
Shannon King ((253) 840-6684)
Frame Inspection Pending
Shannon King ((253) 840-6684)
Plumbing Below Slab Inspection Pending
Shannon King ((253) 840-6684)
Slab/Insulation Inspection Pending
Shannon King ((253) 840-6684)
Water Service Inspection Pending
Storm Inspection Pending
Erosion And Sediment Inspection Partial Pass 4/15/2025 04/15/2025
Jason Little ((253) 244-0387)
Footing/Setback Inspection Failed 4/21/2025 4/21/2025 04/21/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
04/21/2025
1 ; provide geo-tech approval report for soil bearing of 2,000 psf. 2 ; provide special inspection report at time of inspection. 3 ; provide approved site plans showing min. setbacks.

Footing/Setback Inspection Passed 4/22/2025 4/22/2025 04/22/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
04/22/2025
1 ; provide geo-tech approval report for soil bearing of 2,000 psf. 2 ; provide special inspection report at time of inspection. 3 ; provide approved site plans showing min. setbacks.

Foundation/Rebar Inspection Passed 4/25/2025 4/25/2025 04/25/2025
Shannon King ((253) 840-6684)
Storm Inspection Partial Pass 4/29/2025 04/29/2025
Jason Little ((253) 244-0387)
Slab/Insulation Inspection Passed 4/30/2025 4/30/2025 04/30/2025
Ted Christie ((253) 507-0191)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Engineering Commercial Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard commercial conditions: - Prior to starting site work request an inspection for erosion and sediment. - Occupancy will not be granted until all civil work associated with PRCCPXXXXXXXX has been completed and approval has been provided. - Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of Puyallup’s stormwater fact sheet. or See approved civil plan PRCCPXXXXXXXX for approved method of control. - Stormwater control of roof downspouts required. Attached to the site plan is a typical infiltration system you may choose to follow. - Steps shall be taken to prevent drainage onto adjacent lots. - All commercial development, multi-family, mixed use facility, or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required, or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District. - Due to the proximity of this property to a secondary water source (i.e. Clarks Creek, Meeker Ditch, etc.) the applicant shall install a reduced pressure backflow assembly per city standards. - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The applicant is responsible to schedule all utility inspections prior to backfilling - Curb, gutter, sidewalk, and approach must be poured per city standards. - Driveway approach must be a minimum of 30' wide. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. - Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - A separate right of way permit must be obtained is required by a licensed and bonded contractor to make the sanitary sewer main tap and or a water service connection. - Water meter box grade may have to be adjusted, at owners’ expense, due to the grade of the proposed driveway. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. - This property lies within a regulated flood zone. both residential and non-residential must meet the following requirements in accordance with PMC 21.07: (For AE Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated to a minimum of one foot or more above the base flood elevation. Please note additional freeboard increases safety and can reduce insurance premiums. (For AO Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated 1-foot or more above the depth number on the firm (minimum of 2-feet above the highest natural grade). - Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of net less than 1 square inch for every square foot of enclosed area subject to flooding shall be provided. the bottom of openings shall be no higher than 1 foot above grade (PMC 21.07.060(2)). - If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities. - No fill shall be placed unless specifically shown on the approved site plan. after site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f). - No occupancy permit shall be issued until such time as a federal emergency management agency flood elevation certificate is completed based on "finished construction" and reviewed and accepted by the City of Puyallup.
Ready to Issue - Need Contractor Info Resolved Prior to Issuance
Development & Permitting Services
Must provide Contractor doing the work to be named on permit. Contractor must be registered with Washington State Labor and Industries AND have a valid City of Puyallup business license endorsement with Washington State Department of Revenue. SUBMITTED APPLICATION AS TBD, MUST BE CONFIRMED AND VERIFIED PRIOR TO ISSUANCE. [Julie Johnson @ 11/20/2024 9:12 AM] RECEIVED EMAIL STATING DOCE LLC W/B CONTRACTOR [Jeannesha Frazier @ 04/14/2025 3:10 PM]
Ready to Issue - Need Business License Endorsement Resolved Prior to Issuance
Development & Permitting Services
Contractor needs to have a valid City of Puyallup business license endorsement with Washington State Department of Revenue. SUBMITTED APPLICATION AS TBD, MUST BE CONFIRMED AND VERIFIED PRIOR TO ISSUANCE. [Julie Johnson @ 11/20/2024 9:12 AM] RECEIVED EMAIL STATING DOCE LLC W/B CONTRACTOR [Jeannesha Frazier @ 04/14/2025 3:09 PM]
Miscellaneous Condition Open Prior to Completion
Traffic Division
The city has adopted a City-Wide Traffic Impact Fee of $4,500 per PM peak hour trip. City policy requires the project trips to be estimated using the Institute of Transportation Engineers’ (ITE) Trip Generation, 11th Edition. Multi-family Low Rise land use code 220 has a pm peak hour trip rate of 0.51 trips per unit. 24 units x 0.51 = 12.24 pm trips x $4500 = $55,080
Miscellaneous Condition Open Prior to Completion
Traffic Division
Park impact fee was established by Ordinance 3142 dated July 3, 2017 and shall be charged per new dwelling unit based on its size: Park Impact Fee (Per residential dwelling Unit): Less than 500 sqft $1,560.05 500 - 999 sqft $2,313.53 1,000 – 1,999 sqft $3,291.31 2,000 sqft or more $4,017.30 19 units (500-999 sqft) x 2313.53 = $43,957.07 5 units (1000-1999 sqft) x 3291.31 = $16,456.55 Total park impact fee for 24 units is $60,413.62
Fire Review Conditions Open Standard Conditions
Fire Prevention
• Comply with 2021 IFC and 2021 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Exit lighting test required, contractor to provide light meter • Emergency radio test required comply with IFC section 510. Fire final approval upon completed test results • Separate permits required for Fire Alarm and Fire Sprinkler • RTU’S will be required to be tested for shut down with Fire Alarm • Smoke and Fire dampeners will be tested with Fire Alarm. Access doors are required for maintenance and visual inspection. • Fire extinguishers required per code to be installed at time of Fire Final • Elevators – L&I Final required prior to inspection; Fire Alarm contractor required for inspection. • A Knox box is required at the front entry on the exterior of the building if equipped with a Fire Alarm System or Fire Sprinkler System. • PIV must have a Knox lock or approved lock with an extra key provided in Knox box • All above items to be completed prior to fire final. Fire final required before building final Schedule your inspection online through the city of puyallup online permit system. This is a request for inspection only. A date and time will be selected by Inspector depending on availability. Email morning of inspection between 7am – 8am for scheduled date and time. Fire Inspections are Monday – Thursday there will be no inspections on Fridays. David Drake ddrake@puyallupwa.gov
Backflow Protection Device - Commercial DCVA Open Prior to Completion
Engineering Division
A 1" fire service is required to supply the structure’s fire sprinkler system. The applicant shall coordinate water service connection with the City prior to starting site work by scheduling an inspection through the CityView portal. Per City Design Standard Section 302.3, a double detector check valve assembly (DDCVA) backflow device is required on the fire service line to any building which is equipped with a closed fire sprinkler protection system. The DDCVA shall be located inside the building or in a vault at or near the property line and shall be installed in accordance with City Standard Detail 03.10.01-1 and 03.10.01-2. An approved double check valve assembly (DCVA) backflow device is required to be installed on the commercial water service per City Standard Detail 03.04.01. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection. Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
Payment of Deferred Impact Fees Open Prior to Completion
Development & Permitting Services
Payment of Deferred Impact Fees must be paid within 18 months of permit issuance or prior to scheduling Final Building Inspection (which ever comes first).
Ready to Issue - Need School District Letter Resolved Prior to Issuance
Development & Permitting Services
Must provide letter from Puyallup School District stating that school impact fees have been paid. RECEIVED 4.14.25 [Jeannesha Frazier @ 04/14/2025 12:48 PM] .
Miscellaneous Condition Resolved Prior to Issuance
Development & Permitting Services
MUST RECEIVE IMPACT FEE DEFERRAL DOCUMENTS THAT HAVE BEEN NOTARIZED AND RECORDED BY PIERCE COUNTY. [Jeannesha Frazier @ 04/11/2025 7:58 AM]

Related Permit & Planning Applications

Reference Number Status Type
E-20-0206 Closed Water or Sewer Adequacy (for FOOD SERVICE ESTABLISHMENTS)
E-21-0570 Closed Alternative Methods / Materials Request
E-21-0571 Closed Alternative Methods / Materials Request
PRMU20220123 Canceled Residential - New Multi-Unit
PRCCP20240232 Permit(s) Issued Civil Construction Permit
PRGR20241271 Closed Clear, Fill, & Grade Permit
PRFS20250509 In Plan Check Fire Sprinklers
P-21-0008 File Closed Preliminary Site Plan
P-19-0101 Expired Pre-Application
PLZNA20220126 File Closed Administrative Adjustment

Documents & Images

Date Uploaded File Type Name
11/01/2024 Receipt Receipt for transaction:2024-002277
02/07/2025 Receipt Receipt for transaction:2025-000267
03/24/2025 Form CORRECTION RESPONSE LETTER RESUB 3/24
04/08/2025 Form CORRECTION RESPONSE LETTER RESUB 4/8
04/10/2025 Form WSEC (Stamped)
04/10/2025 Plans SITE PLAN - RESUB (Stamped)
04/10/2025 Report 1695STRUCTURAL CALCS (Stamped)
04/10/2025 Other STRUCTURAL CALCS/TRASH ENCLOSURE (Stamped)
04/10/2025 Report TRUSS SPEC, ENGINEERS STAMP (Stamped)
04/10/2025 Plans TRUSS PLAN - (Stamped)
04/11/2025 Other PLUMBING FIXTURE WRKSHEET (Stamped)
04/11/2025 Receipt Receipt for transaction:2025-000699
04/14/2025 Receipt Receipt for transaction:2025-000715
04/14/2025 Permit Permit - Detailed
04/14/2025 Letter Permit Job Card
04/15/2025 Plans CONTRUCTION PLAN SET - RESUB (Stamped)
04/21/2025 Report Inspection Report (Footing/Setback Inspection)
04/22/2025 Report Inspection Report (Footing/Setback Inspection)
04/25/2025 Report Inspection Report (Foundation/Rebar Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.