Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Planning Review Fee | $532.19 | $532.19 | Paid | 09/14/2021 |
No
|
||||
Building Permit Fee | $993.75 | $993.75 | Paid | 05/01/2023 |
Mechanical Permit Fee | $46.30 | $46.30 | Paid | 05/01/2023 |
$40.00
|
||||
Plumbing Permit Fee | $79.00 | $79.00 | Paid | 05/01/2023 |
$40.00
|
||||
Mechanical Plan Review Fee | $30.10 | $30.10 | Paid | 05/01/2023 |
WA State Building Code Council Fee (Residential) | $6.50 | $6.50 | Paid | 05/01/2023 |
Plumbing Plan Review Fee | $51.35 | $51.35 | Paid | 05/01/2023 |
Stormwater Inspection Fee | $360.00 | $360.00 | Paid | 05/01/2023 |
Stormwater Report Review Fee | $360.00 | $360.00 | Paid | 05/01/2023 |
Building Division Fee (Hourly) | $360.00 | $360.00 | Paid | 05/01/2023 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 02/09/2023 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 03/21/2023 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $3,079.19 | $3,079.19 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Mechanical Rough In Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Engineering Final Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Floodproof Certification Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Elevation Verification Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Residential Final Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Plumbing Final Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Mechanical Final Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Erosion And Sediment Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Storm Inspection | Pending | |||
Jeff Hill ((253) 204-5633) | ||||
Sidesewer Inspection | Pending | |||
Combination Frame And Rough In Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Energy (Insulation) Inspection | Pending | |||
Monty Johnson ((253) 770-3326) | ||||
Erosion And Sediment Inspection | Not Ready | 9/29/2023 | 9/29/2023 | 09/29/2023 |
Jeff Hill ((253) 204-5633) | ||||
Erosion And Sediment Inspection | Partial Pass | 11/3/2023 | 11/3/2023 | 11/03/2023 |
Jeff Hill ((253) 204-5633) | ||||
Footing/Setback Inspection | Failed | 11/14/2023 | 11/14/2023 | 11/14/2023 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
11/14/2023
1:provide engineer of record to assume soils at 1000psf with new plan or ok on footing.
|
||||
Footing/Setback Inspection | Not Ready | 11/22/2023 | 11/22/2023 | |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
11/22/2023
cancelled by homeowner
|
||||
Foundation/Rebar Inspection | Passed w/ Conditions | 12/1/2023 | 12/1/2023 | 12/01/2023 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Outstanding
12/01/2023
APPROVED WITH HOLDOWNS FIXED AS DISCUSSED.
|
||||
Sidesewer Inspection | Partial Pass | 12/19/2023 | 12/19/2023 | 12/19/2023 |
Jeff Hill ((253) 204-5633) | ||||
Shear Wall Inspection | Not Ready | 2/2/2024 | 2/2/2024 | 02/02/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
02/02/2024
1:provide dbl row of nails above all straps
2:nail osb into bottom plate at second floor
3:renail osb where nails are overdriven on second floor.
|
||||
Combination Frame And Rough In Inspection | Failed | 10/23/2024 | 10/23/2024 | 10/24/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
10/24/2024
talked to ray about his previous site visit,
1: after frame and insulation approval it will be necessary to heat bathroom with a min cadet type heater with thermostat and provide means to drain the water supply from top to bottom when outside of the heated area.
|
||||
Energy (Insulation) Inspection | Partial Pass | 12/6/2024 | 12/6/2024 | 12/06/2024 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
12/06/2024
ok to rock bathroom
|
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
General Permit Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.
* Work shall not proceed until the inspector has approved the stages of construction.
* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.
* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance.
* By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington.
* TO SCHEDULE INSPECTIONS, CHECK PERMIT STATUS OR TO MAKE PAYMENTS ON THE CITY WEB SITE VISIT https://secure.puyallupwa.gov
|
|||||
Engineering Residential Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
Development Engineering standard residential conditions:
- All inspections, including erosion and sediment, utility, and final inspections, shall be requested through the CityView portal.
- Prior to starting site work, request an erosion and sediment inspection through the CityView portal.
- Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods.
- Stormwater control of roof downspouts shall be controlled. If approved by Development Engineering, the applicant may use City standard details 02.05.01 and 05.05.03 for an individual roof downspout infiltration system.
- The applicant is responsible to call the engineering inspector at 253-435-3650 to schedule a side sewer inspection prior to backfilling.
- Curb, gutter, sidewalk, and approach must be poured per city standards. No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- Driveway approach must be a minimum of 15' wide and a maximum of 30' wide. The total width of all driveways shall not exceed 50% of the property frontage per City standards.
- Driveway may not exceed a 10% grade at any point or as directed by the City of Puyallup.
- Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.
- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
|||||
Pipeline Notfication Rcw 19.122.033 | Open | Engineering Division | Standard Conditions | ||
:
Effective January 1, 2013 RCW 19.122 Before conducting any construction or excavation within 100 feet of a right-of-way or utility easement containing a transmission pipeline a person must notify the pipeline companies of the scheduled excavation through the one-number locator service 811. Notification must occur in a window of not less than 2 business days but not more than 10 business days before beginning the excavation. If a transmission pipeline company is notified that excavation work will occur near a pipeline, a representative of the company must consult with the excavator on-site prior to excavation.
|
|||||
Mechanical and Plumbing OTC Conditions | Open | Building Division | Standard Conditions | ||
:
REQUIRED INSPECTIONS
INSPECTION INSPECTION
Code Code
1010 EROSION & CONTROL
2110 FOOTING/SETBACK 9000 PLANNING FINAL BUILDING PERMIT
2115 FOUNDATION/REBAR 6205 SIDESEWER
2120 UNDERFLOOR 6405 STORM
2125 SLAB/INSULATION 6605 WATER
2210 ROOF SHEATHING 6670 FRONTAGE/DRIVEWAY
2215 SHEARWALL 9100 ENGINEERING FINAL BUILDING PERMIT
2230 ENERGY INSPECTION 9900 FINAL RESIDENTIAL
2235 FRAME
2240 COMBINATION FRAME & ROUGH IN 2925 COMMENT
This is a general list, other inspections may be requried.
|
|||||
Building Permit Standard Conditions | Open | Development & Permitting Services | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Miscellaneous Planning Condition | Open | Planning Division | |||
:
1. Stake and survey the 150' stream buffer and 200' shoreline environment. Project appears outside of both on site plan.
2. The upper floor 'loft area' is NOT approved as an accessory dwelling unit (ADU). No portion of the garage may be used as a dwelling.
3. Scaled measurement of existing home/garage is 2,158 square feet (larger than assessor data)
|
|||||
FEMA Floodplain - AE Flood Zone - Residential | Open | Engineering Division | Standard Conditions | ||
:
The subject property is within the AE flood zone. The proposed garage, however, is not located within the AE floodzone. Although the proposed construction is not required to incorporate specific flood protection measures under current floodplain regulations, the applicant should contemplate incorporating flood control measures (elevating, venting, anchoring, etc.) or purchasing flood insurance in anticipation of this area being mapped into a regulated flood zone in the future.
|
There are no related items for this permit application.
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView
![CityView Logo](/Portal/Content/CityViewClockTower.png)