CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCA20240398


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCA20240398
Commercial - Addition
Closed
CPF NORTHWEST PROPERTY LLC
Addition
43,000 SF EXPANSION OF EXISTING FREEZER WAREHOUSE FACILITIY - COASTAL PACIFIC FOOD DISTRIBUTORS - 9/4 REVISION (1) - MECHANICAL/PLUMBING SPECS (NOT ORIGINALLY PROVIDED) - 9/5 REVISION (2) - WATER STORAGE TANK * REVISION (3) - 10/17/2024 - DEFERRED SUBMITTAL FOR JOIST PACKAGE * REVISION (4) - 11/26/2024 - REFRIGERATION SYSTEM
03/11/2024
07/26/2024
12/07/2025
06/10/2025

Locations

Reviews

Documents Returned For Corrections

Date Returned Name
11/27/2024 CONSTRUCTION PLAN SET - REV (4) (Stamped)
Review Type Outcome Est. Completion Date Completed
Building Review Approved 12/19/2024 11/27/2024
Building Review Approved 11/07/2024 10/23/2024
Engineering Review Approved 10/24/2024 10/14/2024
Building Review Approved 10/24/2024 10/07/2024
Fire Review Approved 10/24/2024 10/07/2024
Fire Review Approved 09/27/2024 09/19/2024
Engineering Review Approved 09/27/2024 09/13/2024
Building Review Failed 09/27/2024 09/13/2024
Building Review Approved 09/26/2024 09/05/2024
Fire Review Approved 07/22/2024 07/16/2024
Engineering Storm Review Approved 07/22/2024 07/08/2024
Engineering Review Approved 07/22/2024 07/05/2024
Engineering Traffic Review Approved 07/22/2024 07/02/2024
Design Review Approved 07/22/2024 07/01/2024
Planning Review Approved 07/22/2024 07/01/2024
Building Review Approved 07/22/2024 07/01/2024
Building Review Failed 06/13/2024 06/13/2024
Fire Review Failed 06/13/2024 06/12/2024
Engineering Review Approved 06/13/2024 05/28/2024
Design Review Approved 06/13/2024 05/23/2024
Planning Review Approved 06/13/2024 05/23/2024
Engineering Traffic Review Approved 06/13/2024 05/22/2024
Engineering Storm Review Approved 06/13/2024 05/22/2024
Fire Review Failed 05/07/2024 05/08/2024
Building Review Failed 05/07/2024 05/07/2024
Design Review Approved 05/07/2024 05/02/2024
Engineering Storm Review Approved 05/07/2024 04/23/2024
Engineering Traffic Review Approved 05/07/2024 04/23/2024
Planning Review Approved 05/07/2024 04/22/2024
Design Review Failed 05/07/2024 04/22/2024
Engineering Review Failed 05/07/2024 04/03/2024
Design Review Failed 05/07/2024 03/28/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 07/26/2024
Stormwater Inspection Fee $360.00 $360.00 Paid 07/26/2024
Unclassified Appliance or Equipment Fee $98.70 $98.70 Paid 07/26/2024
Suspended, Recessed Wall, or Floor unit Heater Fee $58.65 $58.65 Paid 07/26/2024
Exhaust Hood, With Make Up Air - Commercial Fee $35.95 $35.95 Paid 07/26/2024
Building Permit Fee $64,921.25 $64,921.25 Paid 07/26/2024
Mechanical Permit Fee $40.00 $40.00 Paid 07/26/2024
Plumbing Fixtures Fee $39.00 $39.00 Paid 07/26/2024
Plumbing Permit Fee $40.00 $40.00 Paid 07/26/2024
Water Heater Fee $13.00 $13.00 Paid 07/26/2024
Building Plan Review Fee $42,198.81 $42,198.81 Paid 03/26/2024
Stormwater Report Review Fee $360.00 $360.00 Paid 03/26/2024
Mechanical Plan Review Fee $151.65 $151.65 Paid 03/26/2024
Plumbing Plan Review Fee $59.80 $59.80 Paid 03/26/2024
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 07/26/2024
Sewer System Development Charge Fee - Tenant Improvment/Addition $6,057.80 $6,057.80 Paid 04/10/2024
Water System Development Charge Fee - Tenant Improvment/Addition $2,669.25 $2,669.25 Paid 04/10/2024
Traffic Impact Fee (Commercial) $23,400.00 $23,400.00 Paid 05/06/2024
Park Impact Fee (Manufacturing) $38,056.41 $38,056.41 Paid 05/06/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 05/21/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 06/28/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 09/05/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 09/09/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 10/03/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 10/17/2024
Resubmittal/Revision Fee $180.00 $180.00 Paid 11/26/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Erosion And Sediment Inspection Passed 7/31/2024 07/31/2024
Michael Rosenau ((253) 344-6753)
Foundation/Rebar Inspection Not Ready 7/31/2024 7/31/2024 08/01/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
08/01/2024
1. provide geo tech reports and special inspection reports for rebar on site at time of next inspection

Foundation/Rebar Inspection Partial Pass 8/6/2024 8/6/2024 08/07/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
08/07/2024
1. provide geo tech reports and special inspection reports for rebar on site at time of next inspection

Other/Miscellaneous
Carried Forward
08/07/2024
date of inspection 8/6/2024 1.provide special inspection report for rebar epoxied in to existing footing 2. 1st phase of mech shaft approved per special inspection 3. ok to pour as discussed with contractor

Foundation/Rebar Inspection Partial Pass 8/8/2024 8/8/2024 08/08/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
08/08/2024
1. provide geo tech reports and special inspection reports for rebar on site at time of next inspection

Other/Miscellaneous
Carried Forward
08/08/2024
date of inspection 8/6/2024 1.provide special inspection report for rebar epoxied in to existing footing 2. 1st phase of mech shaft approved per special inspection 3. ok to pour as discussed with contractor

Other/Miscellaneous
Carried Forward
08/08/2024
date of inspection 8/8/2024 1.HVAC shaft walls approved to pour per special inspection

Foundation/Rebar Inspection Partial Pass 8/14/2024 8/14/2024 08/15/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
08/15/2024
1. provide geo tech reports and special inspection reports for rebar on site at time of next inspection

Other/Miscellaneous
Carried Forward
08/15/2024
date of inspection 8/6/2024 1.provide special inspection report for rebar epoxied in to existing footing 2. 1st phase of mech shaft approved per special inspection 3. ok to pour as discussed with contractor

Other/Miscellaneous
Carried Forward
08/15/2024
date of inspection 8/8/2024 1.HVAC shaft walls approved to pour per special inspection

Other/Miscellaneous
Carried Forward
08/15/2024
date of inspection 8/14/2024 1.HVAC lid approved per special inspection ok to pour

Footing/Setback Inspection Partial Pass 8/15/2024 8/15/2024 08/15/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
08/15/2024
1.footings approved per special inspections as marked up on city approved plans pg S-101

Footing/Setback Inspection Partial Pass 8/19/2024 8/19/2024 08/19/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
08/19/2024
1.footings approved per special inspections as marked up on city approved plans pg S-101

Other/Miscellaneous
Carried Forward
08/19/2024
date of inspection 8/19/2024 1. footing approved per special inspection as marked up on city approved plans pg S-101

Foundation/Rebar Inspection Partial Pass 8/23/2024 8/23/2024 08/23/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
08/23/2024
1. provide geo tech reports and special inspection reports for rebar on site at time of next inspection

Other/Miscellaneous
Carried Forward
08/23/2024
date of inspection 8/6/2024 1.provide special inspection report for rebar epoxied in to existing footing 2. 1st phase of mech shaft approved per special inspection 3. ok to pour as discussed with contractor

Other/Miscellaneous
Carried Forward
08/23/2024
date of inspection 8/8/2024 1.HVAC shaft walls approved to pour per special inspection

Other/Miscellaneous
Carried Forward
08/23/2024
date of inspection 8/14/2024 1.HVAC lid approved per special inspection ok to pour

Other/Miscellaneous
Carried Forward
08/23/2024
approved as highlighted and dated on plans

Foundation/Rebar Inspection Partial Pass 8/28/2024 8/28/2024 08/29/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
08/29/2024
1. provide geo tech reports and special inspection reports for rebar on site at time of next inspection

Other/Miscellaneous
Carried Forward
08/29/2024
date of inspection 8/6/2024 1.provide special inspection report for rebar epoxied in to existing footing 2. 1st phase of mech shaft approved per special inspection 3. ok to pour as discussed with contractor

Other/Miscellaneous
Carried Forward
08/29/2024
date of inspection 8/8/2024 1.HVAC shaft walls approved to pour per special inspection

Other/Miscellaneous
Carried Forward
08/29/2024
date of inspection 8/14/2024 1.HVAC lid approved per special inspection ok to pour

Other/Miscellaneous
Carried Forward
08/29/2024
approved as highlighted and dated on plans

Other/Miscellaneous
Carried Forward
08/29/2024
date of inspection 8/28/2024 1. footings approved per special inspection as marked up on city approved plans pg S-101

Foundation/Rebar Inspection Partial Pass 9/9/2024 9/9/2024 09/10/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/10/2024
1. provide geo tech reports and special inspection reports for rebar on site at time of next inspection

Other/Miscellaneous
Carried Forward
09/10/2024
date of inspection 8/6/2024 1.provide special inspection report for rebar epoxied in to existing footing 2. 1st phase of mech shaft approved per special inspection 3. ok to pour as discussed with contractor

Other/Miscellaneous
Carried Forward
09/10/2024
date of inspection 8/8/2024 1.HVAC shaft walls approved to pour per special inspection

Other/Miscellaneous
Carried Forward
09/10/2024
date of inspection 8/14/2024 1.HVAC lid approved per special inspection ok to pour

Other/Miscellaneous
Carried Forward
09/10/2024
approved as highlighted and dated on plans

Other/Miscellaneous
Carried Forward
09/10/2024
date of inspection 8/28/2024 1. footings approved per special inspection as marked up on city approved plans pg S-101

Other/Miscellaneous
Carried Forward
09/10/2024
1. date of inspection 9/9/2024 2. footings and walls approved as marked up on city approved plans pg S-101 todays date

Foundation/Rebar Inspection Partial Pass 9/13/2024 9/13/2024 09/13/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
09/13/2024
1. provide geo tech reports and special inspection reports for rebar on site at time of next inspection

Other/Miscellaneous
Carried Forward
09/13/2024
date of inspection 8/6/2024 1.provide special inspection report for rebar epoxied in to existing footing 2. 1st phase of mech shaft approved per special inspection 3. ok to pour as discussed with contractor

Other/Miscellaneous
Carried Forward
09/13/2024
date of inspection 8/8/2024 1.HVAC shaft walls approved to pour per special inspection

Other/Miscellaneous
Carried Forward
09/13/2024
date of inspection 8/14/2024 1.HVAC lid approved per special inspection ok to pour

Other/Miscellaneous
Carried Forward
09/13/2024
approved as highlighted and dated on plans

Other/Miscellaneous
Carried Forward
09/13/2024
date of inspection 8/28/2024 1. footings approved per special inspection as marked up on city approved plans pg S-101

Other/Miscellaneous
Carried Forward
09/13/2024
1. date of inspection 9/9/2024 2. footings and walls approved as marked up on city approved plans pg S-101 todays date

Other/Miscellaneous
Outstanding
09/13/2024
approved with special inspections, kevin to get report on monday 9/16/24

Foundation/Rebar Inspection Partial Pass 9/20/2024 9/20/2024 09/20/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
09/20/2024
1. provide geo tech reports and special inspection reports for rebar on site at time of next inspection

Other/Miscellaneous
Carried Forward
09/20/2024
date of inspection 8/6/2024 1.provide special inspection report for rebar epoxied in to existing footing 2. 1st phase of mech shaft approved per special inspection 3. ok to pour as discussed with contractor

Other/Miscellaneous
Carried Forward
09/20/2024
date of inspection 8/8/2024 1.HVAC shaft walls approved to pour per special inspection

Other/Miscellaneous
Carried Forward
09/20/2024
date of inspection 8/14/2024 1.HVAC lid approved per special inspection ok to pour

Other/Miscellaneous
Resolved
09/20/2024
approved as highlighted and dated on plans

Other/Miscellaneous
Resolved
09/20/2024
date of inspection 8/28/2024 1. footings approved per special inspection as marked up on city approved plans pg S-101

Other/Miscellaneous
Resolved
09/20/2024
1. date of inspection 9/9/2024 2. footings and walls approved as marked up on city approved plans pg S-101 todays date

Other/Miscellaneous
Carried Forward
09/20/2024
progressing with special inspections

Foundation/Rebar Inspection Partial Pass 9/24/2024 9/24/2024 09/24/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/24/2024
1. provide geo tech reports and special inspection reports for rebar on site at time of next inspection

Other/Miscellaneous
Carried Forward
09/24/2024
date of inspection 8/6/2024 1.provide special inspection report for rebar epoxied in to existing footing 2. 1st phase of mech shaft approved per special inspection 3. ok to pour as discussed with contractor

Other/Miscellaneous
Carried Forward
09/24/2024
date of inspection 8/8/2024 1.HVAC shaft walls approved to pour per special inspection

Other/Miscellaneous
Carried Forward
09/24/2024
date of inspection 8/14/2024 1.HVAC lid approved per special inspection ok to pour

Other/Miscellaneous
Carried Forward
09/24/2024
date of inspection 9/24/2024 1.foundation walls at trash shoot area approved per special inspection as marked up on city approved plans PG S-101

Plumbing Rough In Inspection Partial Pass 9/26/2024 9/26/2024 09/26/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/26/2024
date of inspection 9/26/2024 1.DWV under slab approved south side of building as marked up on city approved plans pg P.101

Foundation/Rebar Inspection Partial Pass 9/27/2024 9/27/2024 09/27/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
09/27/2024
1. provide geo tech reports and special inspection reports for rebar on site at time of next inspection

Other/Miscellaneous
Carried Forward
09/27/2024
date of inspection 8/6/2024 1.provide special inspection report for rebar epoxied in to existing footing 2. 1st phase of mech shaft approved per special inspection 3. ok to pour as discussed with contractor

Other/Miscellaneous
Carried Forward
09/27/2024
date of inspection 8/8/2024 1.HVAC shaft walls approved to pour per special inspection

Other/Miscellaneous
Carried Forward
09/27/2024
date of inspection 8/14/2024 1.HVAC lid approved per special inspection ok to pour

Other/Miscellaneous
Carried Forward
09/27/2024
date of inspection 9/24/2024 1.foundation walls at trash shoot area approved per special inspection as marked up on city approved plans PG S-101

Other/Miscellaneous
Outstanding
09/27/2024
1:trash enclosure and fire sprinkler riser room progressing with special inspector.

Underfloor Inspection Partial Pass 9/30/2024 9/30/2024 09/30/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 9/30/2024 1.this inspection is for glycol lines approved at 90 PSI

Plumbing Rough In Inspection Partial Pass 9/30/2024 9/30/2024 09/30/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 9/26/2024 1.DWV under slab approved south side of building as marked up on city approved plans pg P.101

Other/Miscellaneous
Carried Forward
09/30/2024
date of inspection 9/30/2024 1.DWV on north side of building at battery charging area approved as marked up on city approved plans PG P-101

Foundation/Rebar Inspection Partial Pass 10/1/2024 10/1/2024 10/01/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
10/01/2024
1. provide geo tech reports and special inspection reports for rebar on site at time of next inspection

Other/Miscellaneous
Carried Forward
10/01/2024
date of inspection 8/6/2024 1.provide special inspection report for rebar epoxied in to existing footing 2. 1st phase of mech shaft approved per special inspection 3. ok to pour as discussed with contractor

Other/Miscellaneous
Carried Forward
10/01/2024
date of inspection 8/8/2024 1.HVAC shaft walls approved to pour per special inspection

Other/Miscellaneous
Carried Forward
10/01/2024
date of inspection 8/14/2024 1.HVAC lid approved per special inspection ok to pour

Other/Miscellaneous
Carried Forward
10/01/2024
date of inspection 9/24/2024 1.foundation walls at trash shoot area approved per special inspection as marked up on city approved plans PG S-101

Foundation/Rebar Inspection Partial Pass 10/2/2024 10/2/2024 10/02/2024
Kevin Spruell ((253) 841-5590)
Corrections:


Other/Miscellaneous
Carried Forward
10/02/2024
1. provide geo tech reports and special inspection reports for rebar on site at time of next inspection

Other/Miscellaneous
Carried Forward
10/02/2024
date of inspection 8/6/2024 1.provide special inspection report for rebar epoxied in to existing footing 2. 1st phase of mech shaft approved per special inspection 3. ok to pour as discussed with contractor

Other/Miscellaneous
Carried Forward
10/02/2024
date of inspection 8/8/2024 1.HVAC shaft walls approved to pour per special inspection

Other/Miscellaneous
Carried Forward
10/02/2024
date of inspection 8/14/2024 1.HVAC lid approved per special inspection ok to pour

Other/Miscellaneous
Carried Forward
10/02/2024
date of inspection 9/24/2024 1.foundation walls at trash shoot area approved per special inspection as marked up on city approved plans PG S-101

Other/Miscellaneous
Carried Forward
10/02/2024
date of inspection 10/2/2024 1. walls at fire riser rooms north and south approved per special inspection as marked up on city approved plans PG S-101

Plumbing Rough In Inspection Partial Pass 10/15/2024 10/15/2024 10/15/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
10/15/2024
date of inspection 9/26/2024 1.DWV under slab approved south side of building as marked up on city approved plans pg P.101

Other/Miscellaneous
Carried Forward
10/15/2024
date of inspection 9/30/2024 1.DWV on north side of building at battery charging area approved as marked up on city approved plans PG P-101

Other/Miscellaneous
Carried Forward
10/15/2024
dwv for floor drains and trap primers at riser rooms (2) ok

Plumbing Rough In Inspection Not Ready 11/13/2024 11/13/2024 11/13/2024
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Resolved
11/13/2024
date of inspection 9/26/2024 1.DWV under slab approved south side of building as marked up on city approved plans pg P.101

Other/Miscellaneous
Resolved
11/13/2024
date of inspection 9/30/2024 1.DWV on north side of building at battery charging area approved as marked up on city approved plans PG P-101

Plumbing Rough In Inspection Partial Pass 12/3/2024 12/3/2024 12/03/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
12/03/2024
below slab plumb for pump house ok.

Foundation/Rebar Inspection Partial Pass 12/5/2024 12/5/2024 12/05/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
12/05/2024
1. provide geo tech reports and special inspection reports for rebar on site at time of next inspection

Other/Miscellaneous
Carried Forward
12/05/2024
date of inspection 8/6/2024 1.provide special inspection report for rebar epoxied in to existing footing 2. 1st phase of mech shaft approved per special inspection 3. ok to pour as discussed with contractor

Other/Miscellaneous
Resolved
12/05/2024
date of inspection 8/8/2024 1.HVAC shaft walls approved to pour per special inspection

Other/Miscellaneous
Resolved
12/05/2024
date of inspection 8/14/2024 1.HVAC lid approved per special inspection ok to pour

Other/Miscellaneous
Resolved
12/05/2024
date of inspection 9/24/2024 1.foundation walls at trash shoot area approved per special inspection as marked up on city approved plans PG S-101

Other/Miscellaneous
Resolved
12/05/2024
date of inspection 10/2/2024 1. walls at fire riser rooms north and south approved per special inspection as marked up on city approved plans PG S-101

Other/Miscellaneous
Resolved
12/05/2024
1:progressing with special inspector

Plumbing Rough In Inspection Partial Pass 12/18/2024 12/18/2024 12/18/2024
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
12/18/2024
chemical resistant piping below slab for battery room tank ok

Frame Inspection Not Ready 1/14/2025 1/14/2025 01/14/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/14/2025
cancelled by super

Frame Inspection Passed w/ Conditions 1/16/2025 1/16/2025 01/16/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
01/16/2025
passed with seizmic straps screwed as per plan and with special insp approval.

Foundation/Rebar Inspection Partial Pass 1/16/2025 1/16/2025 01/16/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Resolved
01/16/2025
date of inspection 8/6/2024 1.provide special inspection report for rebar epoxied in to existing footing 2. 1st phase of mech shaft approved per special inspection 3. ok to pour as discussed with contractor

Other/Miscellaneous
Carried Forward
01/16/2025
1:loading dock slab ok with special insp

Plumbing Rough In Inspection Partial Pass 01/17/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/17/2025
riser rooms, vent approved.

Plumbing Final Inspection Not Ready 1/17/2025 1/17/2025 01/17/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/17/2025
called in error

Underfloor Inspection Partial Pass 1/28/2025 1/28/2025 01/28/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
01/28/2025
date of inspection 9/30/2024 1.this inspection is for glycol lines approved at 90 PSI

Other/Miscellaneous
Carried Forward
01/28/2025
insp for below slab at -k- to -p- 5 to 15 line 1:ok and progressing with special inspections.

Underfloor Inspection Partial Pass 2/3/2025 2/3/2025 02/03/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
02/03/2025
inspection of slabs at grid line - (c-e,7-15) (e-k,11-15) 1 ; complete L&I electrical approval for electrical in slab. 2 ; complete grease at smooth slab dowels. 3 ; complete all rebar as per plans and provide min. clearances from insulation to rebar. ( ok to pour with special inspection approval and electrical approval)

Slab/Insulation Inspection Partial Pass 2/6/2025 2/6/2025 02/06/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/06/2025
last slab pour, progressing with special.

Plumbing Rough In Inspection Partial Pass 2/25/2025 2/25/2025 02/25/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/25/2025
1:supply for battery room and hose bibs on roof ok, roof drain overflows in same area ok.

Refrigeration Line Test Inspection Partial Pass 2/26/2025 2/26/2025 02/26/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
02/26/2025
co2 unit from ground unit to rtu ok at 1900 psi for ten minutes.

Mechanical Rough In Inspection Partial Pass 5/6/2025 5/6/2025 05/06/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
05/06/2025
will have special inspection report at next inspection.

Mechanical Final Inspection Failed 5/21/2025 5/21/2025 05/21/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
05/21/2025
1:provide mech engineers final letter 2:verify anchorage of big mech skid at back of building,

Storm Inspection Passed 5/29/2025 05/29/2025
Michael Rosenau ((253) 344-6753)
Exit Lighting Test Inspection Passed 5/29/2025 05/29/2025
David Drake ((253) 864-4171)
Fire Or Smoke Damper Inspection VOID 05/29/2025
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs VOID 05/29/2025
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection VOID 05/29/2025
David Drake ((253) 864-4171)
Fire Final Inspection Passed 5/29/2025 5/29/2025 05/29/2025
David Drake ((253) 864-4171)
Engineering Final Inspection Not Ready 5/30/2025 5/30/2025 05/30/2025
Michael Rosenau ((253) 344-6753)
Planning Final Inspection VOID 5/30/2025 05/30/2025
Nabila Comstock ((253) 770-3361)
Building Final Inspection Partial Pass 6/5/2025 6/5/2025 06/05/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Carried Forward
06/05/2025
1:complete engineering final 2:complete area of rescue signs as discussed

Comment Engineering Div Inspection Passed 6/10/2025 06/10/2025
Michael Rosenau ((253) 344-6753)
Engineering Final Inspection Passed 6/10/2025 06/10/2025
Michael Rosenau ((253) 344-6753)
Building Final Inspection Passed 6/11/2025 06/10/2025
Monty Johnson ((253) 770-3326)
Comment Building Div Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Block Wall Rebar Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Roof Sheathing Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Shear Wall Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Firewall/Firestop Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Energy (Insulation) Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Ceiling Grid/T-Bar Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Wallboard / Drywall Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Re-Roof Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Gas Test Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Light Test For Grease Duct Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Exhaust/Vent Fans Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Footing/Setback Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
08/19/2024
1.footings approved per special inspections as marked up on city approved plans pg S-101

Other/Miscellaneous
Outstanding
08/19/2024
date of inspection 8/19/2024 1. footing approved per special inspection as marked up on city approved plans pg S-101

Foundation/Rebar Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Plumbing Final Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Underfloor Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Corrections:


Other/Miscellaneous
Outstanding
02/03/2025
inspection of slabs at grid line - (c-e,7-15) (e-k,11-15) 1 ; complete L&I electrical approval for electrical in slab. 2 ; complete grease at smooth slab dowels. 3 ; complete all rebar as per plans and provide min. clearances from insulation to rebar. ( ok to pour with special inspection approval and electrical approval)

Slab/Insulation Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Plumbing Rough In Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Refrigeration Line Test Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Mechanical Rough In Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)
Mechanical Final Inspection VOID 06/10/2025
Monty Johnson ((253) 770-3326)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS. 2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE. 3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE. 4. KNOX BOXES, WHEN REQUIRED, SHALL BE INSTALLED USUALLY TO THE RIGHT OF THE MAIN FRONT DOOR AND NO HIGHER THAN 6 FEET OFF OF THE GROUND. ONLY HINGED KNOX BOXES SHALL BE USED. KNOX BOXES AND KEY SWITCHES CAN BE ORDERED ONLINE AT THE "KNOX COMPANY" 5. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.
Engineering Commercial Standard Conditions Resolved Standard Conditions
Engineering Division
Development Engineering standard commercial conditions: ** Prior to STARTING work the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start ** - Occupancy will not be granted until all civil work associated with PRCCP20240381 has been completed and approval has been provided. ** Sediment control and erosion procedures shall be practiced eliminating and preventing off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See civil permit PRCCP20240381 for specifications ** ** Stormwater control of roof downspouts must be controlled. See civil permit PRCCP20240381 for specifications ** ** Trash enclosure will adhere to the City's Design Standards Manual. See Stormwater Management Section 208 Pollution Prevention ** ** The floor of the trash enclosure shall slope towards the point of sanitary sewer floor drain. The interior Type 1 Catch Basin will drain to the onsite sewer system See civil permit ** - All commercial development, multi-family, mixed use facility,or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District. - Due to the proximity of this property to a secondary water source (i.e. clarks creek, meeker ditch, etc.) the applicant shall install a reduced pressure backflow assembly per city standards. - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The applicant is responsible to schedule all utility inspections prior to backfilling - Curb, gutter, sidewalk and approach must be poured per city standards. - Driveway approach must be a minimum of 30' wide. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - A separate right of way permit must be obtained is required by a licensed and bonded contractor to make the sanitary sewer main tap and or a water service connection. - Water meter box grade may have to be adjusted, at owners expense, due to the grade of the proposed driveway. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. - This property lies within a regulated flood zone. both residential and non-residential must meet the following requirements in accordance with PMC 21.07: (For AE Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated to a minimum of one foot or more above the base flood elevation. Please note additional freeboard increases safety and can reduce insurance premiums. (For AO Zone): New construction and substantial improvement of any structure will require that the lowest floor, including the basement, shall be elevated 1-foot or more above the depth number on the firm (minimum of 2-feet above the highest natural grade). - Crawlspace openings are required to allow the entry and exit of floodwaters. A minimum of two openings having a total net area of net less than 1 square inch for every square foot of enclosed area subject to flooding shall be provided. the bottom of openings shall be no higher than 1 foot above grade (PMC 21.07.060(2)). - If fill is proposed on the lot, the applicant shall provide compensatory storage in accordance with the requirements of PMC 21.07.060(1)f. If less than 1:1 compensatory storage is proposed, the applicant will be required to provide a hydrologic and hydraulic analysis to determine any effects on floodplain storage capacity, increased flood heights, or increased velocities. - No fill shall be placed unless specifically shown on the approved site plan. after site plan approval, any additional fill shall be submitted on a revised site plan to the city and shall propose mitigation in accordance with PMC 21.07.060(1)(f). - Steps shall be taken to prevent drainage onto adjacent lots. - No occupancy permit shall be issued until such time as a federal emergency management agency flood elevation certificate is completed based on "finished construction" and reviewed and accepted by the City of Puyallup.
Miscellaneous Condition Resolved Prior to Issuance
Engineering Division
Civil permit PRCCP20240381 must be issued prior to the release of this permit. LL 03/28/2024
Miscellaneous Condition Resolved Prior to Occupancy
Engineering Division
All work associated with civil permit PRCCP20240381 must be complete and an approval granted prior to occupancy. LL 03/28/2024
Miscellaneous Condition Resolved Prior to Issuance
Traffic Division
TIF The city has adopted a City-Wide Traffic Impact Fee of $4500 per PM peak hour trip. The $4,500 traffic impact fee per PM peak hour trip shall be paid prior to building permit issuance. The City policy requires the project trips to be estimated using the Institute of Transportation Engineers’ (ITE) Trip Generation, 11th Edition. The project’s proportionate share to this fee program is based on the ITE land use code 157, Cold Storage Warehouse
Miscellaneous Condition Resolved Prior to Issuance
Traffic Division
Park impact fee was established by Ordinance 3142 dated July 3, 2017 and shall be assessed in locations zoned for Manufacturing Park Impact Fee: Zoned (ML) $0.87 per SQF * Applies to newly constructed building addition Park Impact fees will be assessed prior to building permit issuance.
Miscellaneous Condition Resolved Prior to Issuance
Planning Division
Per e-mail sent to applicant (05.02.24) we will not require the 15' wide landscape strip against the building. However, the existing perimeter landscaping is to be supplemented with additional plantings to further increase screening as part of the landscape plan with utility overlay submitted with the associated civil application PRCCP20240381.

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20240381 Closed Civil Construction Permit
PRFS20241155 Closed Fire Sprinklers
PRFA20241553 Closed Fire Alarms
PRCTI20250149 Closed Commercial - Tenant Improvement/Remodel
PLPRE20230082 File Closed Pre-Application
PLPSP20230118 File Closed Preliminary Site Plan

Documents & Images

Date Uploaded File Type Name
03/26/2024 Receipt Receipt for transaction: 2024-000590
04/10/2024 Receipt Receipt for transaction:2024-000710
05/06/2024 Receipt Receipt for transaction: 2024-000935
05/21/2024 Receipt Receipt for transaction:2024-001065
06/28/2024 Receipt Receipt for transaction:2024-001360
07/17/2024 Plans CONSTRUCTION PLAN SET - (Stamped)
07/17/2024 Form WSEC - ENVELOPE REQUIREMENTS (Stamped)
07/17/2024 Form WSEC - ELECTRIC REQUIREMENTS (Stamped)
07/17/2024 Form WSEC - MECHANICAL REQUIREMENTS (Stamped)
07/17/2024 Report STRUCTURAL CALCS - (Stamped)
07/17/2024 Report STEEL CONNECTION DESIGN (Stamped)
07/17/2024 Report FIRE WATER STORAGE TANK - FOUNDATIONS (Stamped)
07/17/2024 Plans HEATING LOAD CALCS (Stamped)
07/17/2024 Form PLUMBING FIXTURE WORKSHEET - (Stamped)
07/17/2024 Plans SITE PLAN (Stamped)
07/17/2024 Report GEOTECH REPORT - (Stamped)
07/26/2024 Receipt Receipt for transaction: 2024-001556
07/26/2024 Letter Permit Job Card
07/26/2024 Permit Permit - Detailed
08/01/2024 Report Inspection Report (Foundation/Rebar Inspection)
08/07/2024 Report Inspection Report (Foundation/Rebar Inspection)
08/08/2024 Report Inspection Report (Foundation/Rebar Inspection)
08/15/2024 Report Inspection Report (Footing/Setback Inspection)
08/19/2024 Report Inspection Report (Footing/Setback Inspection)
08/29/2024 Report Inspection Report (Foundation/Rebar Inspection)
09/05/2024 Form Revision Form Eveler (Flattened)
09/05/2024 Other MECHANICAL & PLUMBING SPECS (Stamped)
09/05/2024 Receipt Receipt for transaction:2024-001847
09/09/2024 Receipt Receipt for transaction:2024-001868
09/10/2024 Report Inspection Report (Foundation/Rebar Inspection)
09/20/2024 Letter Permit Review Correction Letter
09/24/2024 Report Inspection Report (Foundation/Rebar Inspection)
09/26/2024 Report Inspection Report (Plumbing Rough In Inspection)
09/30/2024 Report Inspection Report (Underfloor Inspection)
09/30/2024 Report Inspection Report (Plumbing Rough In Inspection)
10/01/2024 Report Inspection Report (Foundation/Rebar Inspection)
10/02/2024 Report Inspection Report (Foundation/Rebar Inspection)
10/03/2024 Receipt Receipt for transaction:2024-002084
10/15/2024 Plans FOUNDATION DETAIL - Ring Beam Detail AS-101 (Stamped)
10/15/2024 Form ENG STAMPS - RESUB OF REVISION (2) (Stamped)
10/15/2024 Plans DESIGN CALCS - CST Fire Water Tank Calcs_2024_7_9 - RESUB OF REVISION (2) (Stamped)
10/17/2024 Receipt Receipt for transaction:2024-002175
10/23/2024 Plans CONSTRUCTION PLAN SET - REV (3) JOIST PACKAGE (Stamped)
10/23/2024 Report STRUCTURAL CALCS - REV (3) (Stamped)
11/13/2024 Report Inspection Report (Plumbing Rough In Inspection)
11/26/2024 Receipt Receipt for transaction:2024-002468
11/27/2024 Plans CONSTRUCTION PLAN SET - REV (4) (Stamped)
06/10/2025 Report Inspection Report (Building Final Inspection)
06/11/2025 Other Certificate of Occupancy


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.