CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRRNSF20221937
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
AC Unit Fee | $39.10 | $39.10 | Paid | 04/18/2023 |
Exhaust Hood/Range Hood - Residential Fee | $14.10 | $14.10 | Paid | 04/18/2023 |
Exhaust Vent Fan (Bath) Fee | $42.30 | $42.30 | Paid | 04/18/2023 |
Building Permit Fee | $1,833.75 | $1,833.75 | Paid | 04/18/2023 |
Mechanical Permit Fee | $40.00 | $40.00 | Paid | 04/18/2023 |
Plumbing Fixtures Fee | $130.00 | $130.00 | Paid | 04/18/2023 |
Plumbing Permit Fee | $40.00 | $40.00 | Paid | 04/18/2023 |
Water Heater Fee | $13.00 | $13.00 | Paid | 04/18/2023 |
Building Plan Review Fee | $1,191.94 | $1,191.94 | Paid | 12/30/2022 |
Stormwater Report Review Fee | $260.00 | $260.00 | Paid | 12/30/2022 |
Planning Review Fee | $30.00 | $30.00 | Paid | 12/30/2022 |
Mechanical Plan Review Fee | $88.08 | $88.08 | Paid | 12/30/2022 |
WA State Building Code Council Fee (Residential) | $6.50 | $6.50 | Paid | 04/18/2023 |
Resubmittal Fee | $130.00 | $130.00 | Paid | 04/03/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 05/11/2023 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $4,038.77 | $4,038.77 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Comment Engineering Div Inspection | Partial Pass | 5/2/2023 | 5/2/2023 | 05/02/2023 |
Michael Rosenau ((253) 344-6753) | ||||
Comment Building Div Inspection | Partial Pass | 5/2/2023 | 5/2/2023 | 05/02/2023 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
05/02/2023
Talked about inspection process and timing.
|
||||
Comment Building Div Inspection | Partial Pass | 5/10/2023 | 5/10/2023 | 05/10/2023 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
05/10/2023
talked about demo of complete house and requirements to proceed for new sfr
|
||||
Foundation/Rebar Inspection | Not Ready | 5/19/2023 | 5/19/2023 | 05/19/2023 |
Monty Johnson ((253) 770-3326) | ||||
Foundation/Rebar Inspection | Passed w/ Conditions | 5/30/2023 | 5/30/2023 | 05/30/2023 |
Kevin Spruell ((253) 841-5590) | ||||
Other/Miscellaneous
Outstanding
05/30/2023
1. provide letter from engineer of record for wall HT as discussed with contractor
2. provide special inspection report for footing missed on north west corner of foundation
3. dose not include interior footing at stairs
4.OK TO POOR
|
||||
Underfloor Inspection | Partial Pass | 6/2/2023 | 6/2/2023 | 06/02/2023 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
06/02/2023
below slab plumbing (dwv) under garage slab ok.
|
||||
Storm Inspection | Partial Pass | 6/15/2023 | 6/15/2023 | 06/15/2023 |
Michael Rosenau ((253) 344-6753) | ||||
Storm Inspection | Partial Pass | 6/20/2023 | 6/20/2023 | 06/20/2023 |
Michael Rosenau ((253) 344-6753) | ||||
Shear Wall Inspection | Failed | 7/20/2023 | 7/20/2023 | 07/20/2023 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
07/20/2023
provide complete set of plans with shearwall schedule (sheet S2.1)
|
||||
Plumbing Rough In Inspection | Failed | 7/21/2023 | 7/21/2023 | 07/21/2023 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
07/21/2023
1:fill dwv to top
2:add prv to warm and accessible location
|
||||
Combination Frame And Rough In Inspection | Not Ready | 8/3/2023 | 8/3/2023 | 08/03/2023 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
08/03/2023
complete polyseal, tighten anchor bolts and holdowns, install prv in warm and accessible location, caulk boxes at cold walls, complete weather in.
not ready
|
||||
Combination Frame And Rough In Inspection | Failed | 8/8/2023 | 8/8/2023 | 08/08/2023 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
08/08/2023
1:complete a-35 clips as per plan
2:complete poly seal at plumbing on main floor
3:complete seperation of wood to concrete at firred wall
4:ok to insulate
5:provide engineers ok on garage door header not continuous to corners
|
||||
Energy (Insulation) Inspection | Failed | 8/15/2023 | 8/15/2023 | 08/15/2023 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
08/15/2023
1:insulate around doors and windows
2:cut and fluff insulation around electrical boxes and plumbing
3:insulate headers and voids in walls, insulate above basement firred walls
4:provide engineers ok on garage door header
|
||||
Energy (Insulation) Inspection | Passed w/ Conditions | 8/16/2023 | 8/16/2023 | 08/16/2023 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Outstanding
08/16/2023
provide engineers ok on garage header
|
||||
Carbon Monoxide Detectors Inspection | Not Ready | 8/16/2023 | 8/16/2023 | 08/16/2023 |
Monty Johnson ((253) 770-3326) | ||||
Storm Inspection | Partial Pass | 9/15/2023 | 9/14/2023 | 09/14/2023 |
Michael Rosenau ((253) 344-6753) | ||||
Comment Building Div Inspection | Not Ready | 9/27/2023 | 9/27/2023 | 09/27/2023 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
09/27/2023
talked about final residential requirements, engineering final, electrical final,
permit reflecting new sfr in lieu of remodel as it appears presently , gutters downspouts, prv etc.
|
||||
Engineering Final Inspection | Failed | 10/2/2023 | 10/2/2023 | 10/02/2023 |
Jeff Hill ((253) 204-5633) | ||||
Building Final Inspection | Failed | 10/12/2023 | 10/12/2023 | 10/12/2023 |
Monty Johnson ((253) 770-3326) | ||||
Other/Miscellaneous
Carried Forward
10/12/2023
1:load bomber hinges at garage man door
2:insulate water lines in garage
3:add house numbers
4:seal penetrations in sheetrock in garage
|
||||
Frame Inspection | VOID | 10/13/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Re-Roof Inspection | VOID | 10/13/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Shower Pan Inspection | VOID | 10/13/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Fire Sprinkler Cover Inspection | VOID | 10/13/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Fire Sprinkler Final Inspection | VOID | 10/13/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Fire Final Inspection | VOID | 10/13/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Residential Final Inspection | VOID | 10/13/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Plumbing Final Inspection | VOID | 10/13/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Underfloor Inspection | VOID | 10/13/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Combination Frame And Rough In Inspection | VOID | 10/13/2023 | ||
Monty Johnson ((253) 770-3326) | ||||
Comment Building Div Inspection | VOID | 10/13/2023 | ||
Monty Johnson ((253) 770-3326) |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Standard Conditions | |||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Engineering Residential Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
Development Engineering standard residential conditions:
** Prior to STARTING the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start **
** Sediment control and erosion procedures shall be practiced eliminating and preventing off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the Stormwater Fact Sheet and City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods. Attached in CityView **
** Stormwater control of roof downspouts must be controlled. Refer to standard details 02.05.01 & 02.05.03 for typical control methods **
** The applicant is responsible to demolish the existing septic tanks per Tacoma Pierce County Health Department standards. A septic tank decommissioning certificate is required to be filed with Pierce County and a copy submitted to the City of Puyallup **
- All inspections, including erosion and sediment, utility, and final inspections, shall be requested through the CityView portal.
- Prior to starting site work, request an erosion and sediment inspection through the CityView portal.
- Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Refer to the City standard details 02.03.02 & 05.02.01 for typical erosion and sedimentation control methods.
- Stormwater control of roof downspouts shall be controlled. If approved by Development Engineering, the applicant may use City standard details 02.05.01 and 05.05.03 for an individual roof downspout infiltration system.
- The applicant is responsible to call the engineering inspector at 253-435-3650 to schedule a side sewer inspection prior to backfilling.
- Curb, gutter, sidewalk, and approach must be poured per city standards. No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- Driveway approach must be a minimum of 15' wide and a maximum of 30' wide. The total width of all driveways shall not exceed 50% of the property frontage per City standards.
- Driveway may not exceed a 10% grade at any point or as directed by the City of Puyallup.
- Sanitary sewer clean-out to be installed at the property line. If located in the driveway area, it must be placed in a frame and covered per City standards.
- The water meter box shall not be located in hard surfaces. The water meter box and/or water service may need to be relocated or adjusted, at owner's expense, to accommodate for site and grade changes. The new location and grade must be approved by the City of Puyallup.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC Chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.
- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
- To tie into an existing force main, the property owner must install a private pump system per city standards.
- All new or existing multi use and commercial facilities are required to install, at the service connection an approved reduced pressure backflow prevention assembly (RPBA) per city standards.
|
There are no related items for this permit application.
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView