| Paid Fees | Amount | Paid | Owing | Date Paid |
|---|---|---|---|---|
| Fire Review Fee (Commercial Building) | $265.00 | $265.00 | Paid | 01/05/2026 |
| Building Permit Fee | $4,421.25 | $4,421.25 | Paid | 01/05/2026 |
| Plumbing Fixtures Fee | $2,015.00 | $2,015.00 | Paid | 01/05/2026 |
| Plumbing Permit Fee | $40.00 | $40.00 | Paid | 01/05/2026 |
| Building Plan Review Fee | $2,873.81 | $2,873.81 | Paid | 09/29/2025 |
| Plumbing Plan Review Fee | $1,335.75 | $1,335.75 | Paid | 09/29/2025 |
| WA State Building Code Council Fee (Commercial) | $25.00 | $25.00 | Paid | 01/05/2026 |
| Outstanding Fees | Amount | Paid | Owing | Date Paid |
| No outstanding fees. | ||||
| Totals: | $10,975.81 | $10,975.81 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Comment Building Div Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Comment Engineering Div Inspection | Pending | |||
| Footing/Setback Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Foundation/Rebar Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Slab/Insulation Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Roof Sheathing Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Shear Wall Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Firewall/Firestop Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Ceiling Grid/T-Bar Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Exit Lighting Test Inspection | Pending | |||
| David Drake ((253) 864-4171) | ||||
| Hydronic Piping Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Refrigeration Line Test Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Exhaust Hood Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Light Test For Grease Duct Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Exhaust/Vent Fans Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Shower Pan Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Medical Gas Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Fire Or Smoke Damper Inspection | Pending | |||
| David Drake ((253) 864-4171) | ||||
| Hydrostatic Test 200Lbs 2Hrs | Pending | |||
| David Drake ((253) 864-4171) | ||||
| Emergency Radio Test Review Inspection | Pending | |||
| David Drake ((253) 864-4171) | ||||
| Engineering Final Inspection | Pending | |||
| Planning Final Inspection | Pending | |||
| Fire Final Inspection | Pending | |||
| David Drake ((253) 864-4171) | ||||
| Frame Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
02/19/2026
1. Install rockwool for draft stop were needed unit 103 will reinspect that unit.
2. Provide photos of insulation reinstalled in 203 and 204 occupied units so as to not have to disturb tenants with inspection.
|
||||
| Energy (Insulation) Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Plumbing Rough In Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Plumbing Final Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
03/03/2026
Building A - Units 201,102 and 202
1 ; complete drywall at garage ceiling.
2 ; seal all penetrations in garage ceilings.
3 ; insulate water supply lines at hot water heater in garage.
3 ; complete install of hammer arrestor at icemaker, clothes washing machine, and dishwasher as discussed with contractor. (not ready)
|
||||
| Wallboard / Drywall Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
03/04/2026
1. Building B inspections moved to new permit PRCTI20260311.
|
||||
| Combination Frame And Rough In Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Outstanding
03/04/2026
1. Building B inspections moved to new permit PRCTI20260311.
|
||||
| Building Final Inspection | Pending | |||
| Shannon King ((253) 840-6684) | ||||
| Plumbing Rough In Inspection | Not Ready | 2/12/2026 | 2/12/2026 | 02/12/2026 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/12/2026
1. Finish all fire caulking as needed.
2. Leave shower valve exposed on fire wall applications.
3. Provide a minimum of 2" overlap at two-layer drywall applications.
|
||||
| Plumbing Rough In Inspection | Not Ready | 2/13/2026 | 2/13/2026 | 02/13/2026 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/13/2026
1. Finish all fire caulking as needed.
2. Leave shower valve exposed on fire wall applications.
3. Provide a minimum of 2" overlap at two-layer drywall applications.
|
||||
| Frame Inspection | Partial Pass | 2/18/2026 | 2/18/2026 | 02/18/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Plumbing Rough In Inspection | Partial Pass | 2/19/2026 | 2/19/2026 | 02/19/2026 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
02/19/2026
1. Finish all fire caulking as needed.
2. Leave shower valve exposed on fire wall applications.
3. Provide a minimum of 2" overlap at two-layer drywall applications.
|
||||
| Frame Inspection | Not Ready | 2/19/2026 | 2/19/2026 | 02/19/2026 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
02/19/2026
1. Install rockwool for draft stop were needed unit 103 will reinspect that unit.
2. Provide photos of insulation reinstalled in 203 and 204 occupied units so as to not have to disturb tenants with inspection.
|
||||
| Plumbing Rough In Inspection | Partial Pass | 2/20/2026 | 2/20/2026 | 02/20/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Plumbing Rough In Inspection | Partial Pass | 2/23/2026 | 2/23/2026 | 02/23/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Combination Frame And Rough In Inspection | Partial Pass | 2/24/2026 | 2/24/2026 | 02/24/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Wallboard / Drywall Inspection | Partial Pass | 2/24/2026 | 2/24/2026 | 02/24/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Plumbing Rough In Inspection | Partial Pass | 2/24/2026 | 2/24/2026 | 02/24/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Energy (Insulation) Inspection | Partial Pass | 2/25/2026 | 2/25/2026 | 02/25/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Wallboard / Drywall Inspection | Partial Pass | 2/25/2026 | 2/25/2026 | 02/25/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Plumbing Rough In Inspection | Partial Pass | 2/25/2026 | 2/25/2026 | 02/25/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Wallboard / Drywall Inspection | Partial Pass | 2/26/2026 | 2/26/2026 | 02/26/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Building Final Inspection | Partial Pass | 2/27/2026 | 2/27/2026 | 02/27/2026 |
| James LaVergne ((253) 841-5590) | ||||
| Wallboard / Drywall Inspection | Failed | 3/3/2026 | 3/3/2026 | 03/03/2026 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
03/03/2026
1 ; 1st layer of drywall not installed at unit B101 at time of inspection.
|
||||
| Building Final Inspection | Failed | 3/3/2026 | 3/3/2026 | 03/03/2026 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
03/03/2026
Building A - Units 201,102 and 202
1 ; complete drywall at garage ceiling.
2 ; seal all penetrations in garage ceilings.
3 ; insulate water supply lines at hot water heater in garage.
3 ; complete install of hammer arrestor at icemaker, clothes washing machine, and dishwasher as discussed with contractor. (not ready)
|
||||
| Plumbing Final Inspection | Failed | 3/3/2026 | 3/3/2026 | 03/03/2026 |
| Shannon King ((253) 840-6684) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
03/03/2026
Building A - Units 201,102 and 202
1 ; complete drywall at garage ceiling.
2 ; seal all penetrations in garage ceilings.
3 ; insulate water supply lines at hot water heater in garage.
3 ; complete install of hammer arrestor at icemaker, clothes washing machine, and dishwasher as discussed with contractor. (not ready)
|
||||
| Wallboard / Drywall Inspection | Partial Pass | 3/4/2026 | 3/4/2026 | 03/04/2026 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
03/04/2026
1 ; 1st layer of drywall not installed at unit B101 at time of inspection.
|
||||
|
Other/Miscellaneous
Carried Forward
03/04/2026
1. Building B inspections moved to new permit PRCTI20260311.
|
||||
| Combination Frame And Rough In Inspection | Partial Pass | 3/4/2026 | 3/4/2026 | 03/04/2026 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Carried Forward
03/04/2026
1. Building B inspections moved to new permit PRCTI20260311.
|
||||
| Building Final Inspection | Partial Pass | 3/19/2026 | 3/19/2026 | 03/19/2026 |
| James LaVergne ((253) 841-5590) | ||||
|
Corrections:
Other/Miscellaneous
Resolved
03/19/2026
Building A - Units 201,102 and 202
1 ; complete drywall at garage ceiling.
2 ; seal all penetrations in garage ceilings.
3 ; insulate water supply lines at hot water heater in garage.
3 ; complete install of hammer arrestor at icemaker, clothes washing machine, and dishwasher as discussed with contractor. (not ready)
|
||||
| Condition | Status | Category |
|---|---|---|
| Building Permit Standard Conditions | Open | Standard Conditions |
|
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
||
| Fire Review Conditions | Open | Standard Conditions |
|
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS.
2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE.
3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE.
4. KNOX BOXES, WHEN REQUIRED, SHALL BE INSTALLED USUALLY TO THE RIGHT OF THE MAIN FRONT DOOR AND NO HIGHER THAN 6 FEET OFF OF THE GROUND. ONLY HINGED KNOX BOXES SHALL BE USED. KNOX BOXES AND KEY SWITCHES CAN BE ORDERED ONLINE AT THE "KNOX COMPANY"
5. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.
|
||
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.