CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRMU20230881


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRMU20230881
Residential - New Multi-Unit
In Plan Check
WESLEY HOMES BRADLEY PARK LLC
New
As part of the Phase 2 development of Wesley Bradley Park, - Group R2 w/ 3 stories Type VA over Type 1A concrete garage. This project has 67 dwelling units. - WESLEY HOMES BRADLEY PARK PH 2 - BROWNSTONE
06/13/2023

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Failed 04/10/2024 04/12/2024
Fire Review Approved 04/10/2024 04/10/2024
Engineering Review Failed 04/10/2024 04/04/2024
Engineering Traffic Review Approved 04/10/2024 03/21/2024
Planning Review Failed 04/10/2024 03/14/2024
Building Review Failed 09/14/2023 09/29/2023
Planning Review Approved 09/14/2023 09/26/2023
Fire Review Failed 09/14/2023 09/22/2023
Engineering Traffic Review Approved 09/14/2023 09/14/2023
Engineering Review Failed 09/14/2023 08/30/2023
Building Review Pending 05/24/2024
Engineering Review Pending 05/24/2024
Engineering Traffic Review Pending 05/24/2024
Fire Review Pending 05/24/2024
Planning Review Pending 05/24/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Building Plan Review Fee $47,971.11 $47,971.11 Paid 06/13/2023
Plumbing Plan Review Fee $2,975.05 $2,975.05 Paid 06/13/2023
Mechanical Plan Review Fee $1,083.52 $1,083.52 Paid 06/13/2023
Resubmittal Fee $180.00 $180.00 Paid 03/11/2024
Resubmittal Fee $180.00 $180.00 Paid 04/25/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Engineering Commercial Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard commercial conditions: ** Prior to STARTING the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start ** ** Sediment control and erosion procedures shall be practiced eliminating and preventing off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See civil permit PRCCP20231028 for specifications ** ** Stormwater control of roof downspouts must be controlled. See civil permit PRCCP20231028 for specifications ** - Prior to starting site work request an inspection for erosion and sediment. - Occupancy will not be granted until all civil work associated with PRCCP20231028 has been completed and approval has been provided. - Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of puyallup’s stormwater fact sheet. or See approved civil plan for approved method of control. - All commercial development, multi-family, mixed use facility,or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District. - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Miscellaneous Condition Open Engineering Division Prior to Issuance
: Civil permit PRCCP20231028 must be issued prior to the release of this permit. A final review of the site plan must also be done. LL 08/28/2023
Miscellaneous Condition Open Engineering Division Prior to Occupancy
: All work associated with civil permit PRCCP20231028 must be completed and a final approval granted prior to granting occupancy for this permit. LL 08/28/2023

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20231028 Submittals Incomplete Civil Construction Permit
P-21-0134 File Closed Pre-Application
PLZV20220069 File Closed Zoning Verification
PLPSP20220108 Waiting for Revisions Preliminary Site Plan
PLDR20230034 File Closed Mixed Use Design Review
PLDR20240031 File Closed Mixed Use Design Review

Documents & Images

Date Uploaded File Type Name
06/13/2023 Other PLDR20230034 Notice of DRHPB Decision 051823 FINAL SIGNED
04/12/2024 Form PLUMBING FIXTURE WORKSHEET (Flattened)
04/12/2024 Other 16718-R-Phase 2-Traffic Scoping Worksheet-2024-02-15 (Flattened)
06/13/2023 Other WESLEY BROWNSTONES PHASE 2 Early Submittal Waiver Form signed
09/29/2023 Form 23_0707 BP2 Energy Code Worksheet_revised (Flattened)
04/12/2024 Report WBP2 Brownstones - Supplemental Structural Calcs - 2024-03-01 (Flattened)
06/13/2023 Form APPLICATION FORM
06/13/2023 Receipt Receipt for transaction:2023-001107
06/15/2023 Letter Incomplete Application Notice
06/15/2023 Receipt Incomplete Application Notice.pdf - ADDITIONAL MECHPLUMB NEEDED PRMU20230881
07/10/2023 Report CONSTRUCTION SWPPP 16718-R-SWPPP-2023-01-23
09/29/2023 Plans RE_ Wesley Bradley Park - next phase_RAY COCKERHAM EMAIL (Flattened)
09/29/2023 Plans TECHNOLOGY PLAN (Flattened)
09/29/2023 Report RE_ Wesley Bradley Park - next phase_RAY COCKERHAM EMAIL0 (Flattened)
09/29/2023 Report RE_ Wesley Bradley Park - next phase_RAY COCKERHAM EMAIL1 (Flattened)
09/29/2023 Plans RE_ Wesley Bradley Park - next phase_RAY COCKERHAM EMAIL2 (Flattened)
04/12/2024 Plans WBP2 Brownstones - Structural Dwgs - 2024-03-12 (Flattened)
09/29/2023 Letter Permit Review Correction Letter
03/11/2024 Receipt Receipt for transaction:2024-000471
03/13/2024 Form LETTER OF TRANSMITTAL
03/13/2024 Form REVISION FORM
03/13/2024 Plans STORAGE LOCKER SUBMITTAL PKG
03/13/2024 Letter Incomplete Application Notice
04/12/2024 Letter Permit Review Correction Letter
04/25/2024 Receipt Receipt for transaction:2024-000844


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.