Permit Application Status
PRMU20230881
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Plan Review Fee | $47,971.11 | $47,971.11 | Paid | 06/13/2023 |
Plumbing Plan Review Fee | $2,975.05 | $2,975.05 | Paid | 06/13/2023 |
Mechanical Plan Review Fee | $1,083.52 | $1,083.52 | Paid | 06/13/2023 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 03/11/2024 |
Resubmittal Fee | $180.00 | $180.00 | Paid | 04/25/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $52,389.68 | $52,389.68 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
There are no inspections for this permit application, or you are not authorized to view them.
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Engineering Commercial Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
Development Engineering standard commercial conditions:
** Prior to STARTING the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start **
** Sediment control and erosion procedures shall be practiced eliminating and preventing off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See civil permit PRCCP20231028 for specifications **
** Stormwater control of roof downspouts must be controlled. See civil permit PRCCP20231028 for specifications **
- Prior to starting site work request an inspection for erosion and sediment.
- Occupancy will not be granted until all civil work associated with PRCCP20231028 has been completed and approval has been provided.
- Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of puyallup’s stormwater fact sheet. or See approved civil plan for approved method of control.
- All commercial development, multi-family, mixed use facility,or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required or A reduced pressure backflow assembly (RPBA) is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District.
- A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
- Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
|
|||||
Miscellaneous Condition | Open | Engineering Division | Prior to Issuance | ||
:
Civil permit PRCCP20231028 must be issued prior to the release of this permit. A final review of the site plan must also be done. LL 08/28/2023
|
|||||
Miscellaneous Condition | Open | Engineering Division | Prior to Occupancy | ||
:
All work associated with civil permit PRCCP20231028 must be completed and a final approval granted prior to granting occupancy for this permit. LL 08/28/2023
|
Reference Number | Status | Type |
---|---|---|
PRCCP20231028 | Submittals Incomplete | Civil Construction Permit |
P-21-0134 | File Closed | Pre-Application |
PLZV20220069 | File Closed | Zoning Verification |
PLPSP20220108 | Waiting for Revisions | Preliminary Site Plan |
PLDR20230034 | File Closed | Mixed Use Design Review |
PLDR20240031 | File Closed | Mixed Use Design Review |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.