Summary

PRFN20240667
Fence
Returned for Correction
BCC PUYALLUP LLC
New
Construct new 8' tall chain link fence around medium voltage switchgear building - CENTERIS VOLTAGE PARK
04/19/2024

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 05/14/2024 05/10/2024
Engineering Review Approved 05/14/2024 05/09/2024
Planning Review Failed 05/14/2024 05/07/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Building Plan Review Fee $190.61 $190.61 Paid 04/23/2024
Outstanding Fees Amount Paid Owing Date Paid
Resubmittal Fee $180.00 $0.00 $180.00 Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$180.00    Add Fees to My Cart

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Contaminated Site Remediation Open Engineering Division Standard Conditions
: The subject property has been classified as a contaminated site by the Tacoma Pierce County Health Department (TPCHD) and must be remediated per Washington Administrative Code Title 173. It is the applicant’s responsibility to coordinate cleanup with TPCHD. Visit https://www.tpchd.org/healthy-places/contaminated-property-cleanup for more information. The applicant shall request a remediation status report from TPCHD by emailing UST@tpchd.org. Provide a copy of the status report to the City.
Miscellaneous Condition Open Engineering Division Prior to Completion
: Building permit PRFN20240667 cannot be issued until civil construction permit PRCCP20240183 is issued first. The City shall not be held liable for any conflicts that arise between the approved building plans and approved civil construction plans since the building permits were issued prior to civil approval. Ken Cook authorized that this condition be changed from a prior to issuance condition, per normal procedures, to a prior to completion condition in order for work to begin on the building permit while the civil construction permit is under review. [Yianni Charitou @ 02/15/2024 10:51 AM]
Williams Gas Pipeline Survey Open Engineering Division Standard Conditions
: The applicant shall contact Williams Gas' Matthew Kautzman at matt.kautzman@williams.com or (253) 377-6146 to schedule a survey of the gas pipeline easement adjacent to the property before construction is initiated. Matthew may need access to neighbors' property to complete the survey. The applicant shall submit a copy of Matthew's survey approval to the City before proceeding with construction. [Yianni Charitou @ 05/09/2024 8:03 AM]

Related Permit & Planning Applications

Reference Number Status Type
PRFO20231761 Permit(s) Issued Foundation Only
PRFO20240140 Permit(s) Issued Foundation Only
PRCCP20240183 In Plan Check Civil Construction Permit
PRFO20240187 Permit(s) Issued Foundation Only
PRMH20240272 Permit(s) Issued Mechanical - COMMERCIAL ONLY
PRCTI20240275 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRCTI20240333 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRCTI20240438 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRCTI20240560 Ready for Issuance Commercial - Tenant Improvement/Remodel
PRFO20240573 In Plan Check Foundation Only
PRMH20240593 Permit(s) Issued Mechanical - COMMERCIAL ONLY
PRFS20240598 Permit(s) Issued Fire Sprinklers
PRCTI20240601 In Plan Check Commercial - Tenant Improvement/Remodel
PRFA20240642 Permit(s) Issued Fire Alarms
PRCNC20240647 In Plan Check Commercial - New Construction
PLPRE20230121 File Closed Pre-Application
PLSSP20240018 File Closed SEPA Standalone