CITY OF PUYALLUP PERMITTING PORTAL
Permit Application Status
PRCNC20241741
In order to request inspections, you need to be signed in.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Building Plan Review Fee | $11,932.83 | $11,932.83 | Paid | 12/03/2024 |
Mechanical Plan Review Fee | $44.33 | $44.33 | Paid | 12/03/2024 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
Fire Review Fee (Commercial Building) | $265.00 | $0.00 | $265.00 | Not Paid |
Building Permit Fee | $18,358.20 | $0.00 | $18,358.20 | Not Paid |
Mechanical Permit Fee | $40.00 | $0.00 | $40.00 | Not Paid |
WA State Building Code Council Fee (Commercial) | $25.00 | $0.00 | $25.00 | Not Paid |
Ventilation System (apart from Heating/AC) Fee | $14.10 | $0.00 | $14.10 | Not Paid |
Mechanical Duct Work Fee | $14.10 | $0.00 | $14.10 | Not Paid |
Planning Building Permit Fee | $30.00 | $0.00 | $30.00 | Not Paid |
Totals: | $30,723.56 | $11,977.16 | $18,746.40 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$18,746.40 Add Fees to My Cart
There are no inspections for this permit application, or you are not authorized to view them.
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Building Permit Standard Conditions | Open | Building Division | Standard Conditions | ||
:
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
|
|||||
Fire Review Conditions | Open | Standard Conditions | |||
:
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS.
2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE.
3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE.
4. KNOX BOXES, WHEN REQUIRED, SHALL BE INSTALLED USUALLY TO THE RIGHT OF THE MAIN FRONT DOOR AND NO HIGHER THAN 6 FEET OFF OF THE GROUND. ONLY HINGED KNOX BOXES SHALL BE USED. KNOX BOXES AND KEY SWITCHES CAN BE ORDERED ONLINE AT THE "KNOX COMPANY"
5. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.
|
|||||
Contaminated Site Remediation | Open | Engineering Division | Standard Conditions | ||
:
The subject property has been classified as a contaminated site by the Tacoma Pierce County Health Department (TPCHD) and must be remediated per Washington Administrative Code Title 173. It is the applicant’s responsibility to coordinate cleanup with TPCHD. Visit https://www.tpchd.org/healthy-places/contaminated-property-cleanup for more information. The applicant shall request a remediation status report from TPCHD by emailing UST@tpchd.org. Provide a copy of the status report to the City.
|
|||||
Engineering Commercial Standard Conditions | Open | Engineering Division | Standard Conditions | ||
:
Development Engineering standard commercial conditions:
- The City shall not be held liable for any conflicts that arise between the approved building plans and approved civil construction plans since the building permits were issued prior to civil approval.
- Prior to starting site work request an inspection for erosion and sediment.
- Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20240183 for approved method of control.
- Stormwater control of roof downspouts required.
- Steps shall be taken to prevent drainage onto adjacent lots.
- Stormwater drainage from existing buildings shall be directed or graded away from the new switchgear building. No drainage shall be directed toward the new switchgear building.
- The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction.
- The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law.
- No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.
|
|||||
Miscellaneous Condition | Open | Engineering Division | Prior to Occupancy | ||
:
Refer to permits PRCTI20241387 and PRCCP20240183 for civil and foundation work. Occupancy will not be granted until all civil work associated with PRCCP20240183 has been completed and approval has been provided.
The City shall not be held liable for any conflicts that arise between the approved building plans and approved civil construction plans since the building permits were issued prior to civil approval.
|
|||||
Williams Gas Pipeline Survey | Open | Engineering Division | Standard Conditions | ||
:
In accordance with RCW 19.27 and RCW 19.122, any project within 100-ft of a major utility transmission line, including hazardous liquid or gas pipelines, shall provide notice to the utility operator. Prior to permit issuance, provide written documentation from the operator/owner of the Northwest Pipeline LLC (Williams Gas Main) that the proposed development is acceptable as designed. (Contact Williams Gas' Matthew Kautzman at matt.kautzman@williams.com or 253-377-6146.)
|
|||||
Miscellaneous Condition | Open | Planning Division | Prior to Issuance | ||
:
NEED TO CONFIRM PROPERTY LINES PER RACHAEL B
|
Reference Number | Status | Type |
---|---|---|
PRFO20231761 | Closed | Foundation Only |
PRFO20240140 | Permit(s) Issued | Foundation Only |
PRCCP20240183 | Permit(s) Issued | Civil Construction Permit |
PRFO20240187 | Permit(s) Issued | Foundation Only |
PRMH20240272 | Permit(s) Issued | Mechanical - COMMERCIAL ONLY |
PRCTI20240275 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRCTI20240333 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRCTI20240438 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRCTI20240560 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRFO20240573 | Permit(s) Issued | Foundation Only |
PRMH20240593 | Permit(s) Issued | Mechanical - COMMERCIAL ONLY |
PRFS20240598 | Closed | Fire Sprinklers |
PRCNC20240601 | Permit(s) Issued | Commercial - New Construction |
PRFA20240642 | Closed | Fire Alarms |
PRCNC20240647 | Permit(s) Issued | Commercial - New Construction |
PRFN20240667 | Permit(s) Issued | Fence |
PRCTI20240782 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRCTI20240784 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRFA20240822 | Closed | Fire Alarms |
PRMH20240831 | Permit(s) Issued | Mechanical - COMMERCIAL ONLY |
PRCTI20240892 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRFA20241312 | Closed | Fire Alarms |
PRCTI20241387 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRFA20241456 | Closed | Fire Alarms |
PRFA20241475 | Permit(s) Issued | Fire Alarms |
PRFS20241490 | Closed | Fire Sprinklers |
PRMH20241875 | Permit(s) Issued | Mechanical - COMMERCIAL ONLY |
PRRWF20241913 | Returned for Correction | Retaining Wall |
PRCTI20242004 | Permit(s) Issued | Commercial - Tenant Improvement/Remodel |
PRCTI20250032 | Returned for Correction | Commercial - Tenant Improvement/Remodel |
PRFA20250095 | In Plan Check | Fire Alarms |
PLPRE20230121 | File Closed | Pre-Application |
PLSSP20240018 | File Closed | SEPA Standalone |
Date Uploaded | File Type | Name |
---|---|---|
01/28/2025 | Plans | CONSTRUCTION PLAN SET - Centeris Data Center TI - South Yard Anchorage (Stamped) |
01/28/2025 | Plans | CONSTRUCTION PLAN SET - Centeris South Utility Yard Switchgear Building (Stamped) |
01/28/2025 | Plans | CONSTRUCTION PLAN SET - South SG Bldg & Generators-Arch (Stamped) |
01/28/2025 | Plans | CONTRUCTION PLAN SET - Centeris Switchgear Mech (Stamped) |
01/28/2025 | Other | CUT SHEETS - Centeris - 1250kw generator REV6 9-13-24 (Stamped) |
01/28/2025 | Report | STRUCTURAL CALS - Centeris South Utility Yard Switchgear Building Calcs (Stamped) |
01/28/2025 | Report | STRUCTURAL CALS - South Yard Genorator Anchorage Calculations (Stamped) |
01/28/2025 | Form | WSEC Form Switchgear 2 (Stamped) |
12/03/2024 | Receipt | Receipt for transaction:2024-002507 |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.
Powered by CityView