CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCNC20240601


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCNC20240601
Commercial - New Construction
Permit(s) Issued
BCC PUYALLUP LLC
New
Construct a 2,400 exterior roof shed over exterior electrical switchgear and structural framing for conduit supports - CENTERIS VOLTAGE PARK
04/09/2024
06/27/2024
01/14/2025

Locations

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 06/25/2024 06/14/2024
Engineering Review Approved 06/25/2024 06/11/2024
Planning Review Approved 06/25/2024 06/11/2024
Fire Review Approved 06/25/2024 05/29/2024
Engineering Review Failed 05/14/2024 05/13/2024
Building Review Failed 05/14/2024 05/13/2024
Fire Review Approved 05/14/2024 05/09/2024
Planning Review Failed 05/14/2024 05/07/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 06/27/2024
Building Permit Fee $2,113.75 $2,113.75 Paid 06/27/2024
Building Plan Review Fee $1,373.94 $1,373.94 Paid 04/16/2024
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 06/27/2024
Resubmittal Fee $180.00 $180.00 Paid 06/27/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection Pending
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection Pending
Footing/Setback Inspection Pending
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Pending
Shannon King ((253) 840-6684)
Slab/Insulation Inspection Pending
Shannon King ((253) 840-6684)
Roof Sheathing Inspection Pending
Shannon King ((253) 840-6684)
Shear Wall Inspection Pending
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection Pending
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Pending
Shannon King ((253) 840-6684)
Combination Frame And Rough In Inspection Pending
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Pending
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Pending
Shannon King ((253) 840-6684)
Exit Lighting Test Inspection Pending
David Drake ((253) 864-4171)
Hydronic Piping Inspection Pending
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection Pending
Shannon King ((253) 840-6684)
Exhaust Hood Inspection Pending
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection Pending
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection Pending
Shannon King ((253) 840-6684)
Medical Gas Inspection Pending
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection Pending
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs Pending
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection Pending
David Drake ((253) 864-4171)
Engineering Final Inspection Pending
Planning Final Inspection Pending
Fire Final Inspection Pending
David Drake ((253) 864-4171)
Building Final Inspection Pending
Shannon King ((253) 840-6684)
Frame Inspection Pending
Shannon King ((253) 840-6684)
Frame Inspection Partial Pass 7/18/2024 7/18/2024 07/18/2024
Shannon King ((253) 840-6684)

Conditions

Condition Status Department Category Expiration Date Due Date
Building Permit Standard Conditions Open Building Division Standard Conditions
: * Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
: • Comply with 2021 IFC and 2021 IBC • Total coverage required in the city of puyallup • L&I Final required prior to Fire Final • Separate permits required for Fire Sprinkler • Fire extinguishers required per code • All above items to be completed prior to fire final. Fire final required before building final
Contaminated Site Remediation Open Engineering Division Standard Conditions
: The subject property has been classified as a contaminated site by the Tacoma Pierce County Health Department (TPCHD) and must be remediated per Washington Administrative Code Title 173. It is the applicant’s responsibility to coordinate cleanup with TPCHD. Visit https://www.tpchd.org/healthy-places/contaminated-property-cleanup for more information. The applicant shall request a remediation status report from TPCHD by emailing UST@tpchd.org. Provide a copy of the status report to the City.
Miscellaneous Condition Open Engineering Division Prior to Completion
: Building permit PRCTI20240601 cannot be issued until civil construction permit PRCCP20240183 is issued first. The City shall not be held liable for any conflicts that arise between the approved building plans and approved civil construction plans since the building permits were issued prior to civil approval. Ken Cook authorized that this condition be changed from a prior to issuance condition, per normal procedures, to a prior to completion condition in order for work to begin on the building permit while the civil construction permit is under review. [Yianni Charitou @ 02/15/2024 10:51 AM]
Engineering Commercial Standard Conditions Open Engineering Division Standard Conditions
: Development Engineering standard commercial conditions: - Prior to starting site work request an inspection for erosion and sediment. - Occupancy will not be granted until all civil work associated with PRCCP20240183 has been completed and approval has been provided. - Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20240183 for approved method of control. - Stormwater control of roof downspouts required. - Steps shall be taken to prevent drainage onto adjacent lots. - Stormwater drainage from existing buildings shall be directed or graded away from the new switchgear building. No drainage shall be directed toward the new switchgear building. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit.

Related Permit & Planning Applications

Reference Number Status Type
PRFO20231761 Closed Foundation Only
PRFO20240140 Permit(s) Issued Foundation Only
PRCCP20240183 In Plan Check Civil Construction Permit
PRFO20240187 Permit(s) Issued Foundation Only
PRMH20240272 Permit(s) Issued Mechanical - COMMERCIAL ONLY
PRCTI20240275 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRCTI20240333 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRCTI20240438 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRCTI20240560 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRFO20240573 Permit(s) Issued Foundation Only
PRMH20240593 Permit(s) Issued Mechanical - COMMERCIAL ONLY
PRFS20240598 Permit(s) Issued Fire Sprinklers
PRFA20240642 Permit(s) Issued Fire Alarms
PRCNC20240647 Permit(s) Issued Commercial - New Construction
PRFN20240667 Permit(s) Issued Fence
PRCTI20240782 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRCTI20240784 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRFA20240822 Permit(s) Issued Fire Alarms
PRMH20240831 In Plan Check Mechanical - COMMERCIAL ONLY
PRCTI20240892 In Plan Check Commercial - Tenant Improvement/Remodel
PLPRE20230121 File Closed Pre-Application
PLSSP20240018 File Closed SEPA Standalone

Documents & Images


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.