CITY OF PUYALLUP PERMITTING PORTAL
Development Permit Application Status
PRFA20260831
| Paid Fees | Amount | Paid | Owing | Date Paid |
|---|---|---|---|---|
| Fire Alarm Systems (Alteration) Fee | $132.25 | $132.25 | Paid | 06/10/2026 |
| Outstanding Fees | Amount | Paid | Owing | Date Paid |
| No outstanding fees. | ||||
| Totals: | $132.25 | $132.25 | $0.00 |
Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.
$0.00
| Inspection | Outcome | Requested | Scheduled | Date Inspected |
|---|---|---|---|---|
| Fire Alarm Final Inspection | Passed | 7/14/2026 | 7/14/2026 | 07/14/2026 |
| David Drake ((253) 864-4171) | ||||
| Fire Alarm Test Inspection | Passed | 7/14/2026 | 7/14/2026 | 07/14/2026 |
| David Drake ((253) 864-4171) | ||||
| Piv And Tamper Inspection | VOID | 07/14/2026 | ||
| David Drake ((253) 864-4171) | ||||
| Fire Alarm Cover Inspection | VOID | 07/14/2026 | ||
| David Drake ((253) 864-4171) | ||||
| Condition | Status | Category |
|---|---|---|
| New Fire Alarm System Conditions | Open | Standard Conditions |
|
Fire Prevention
• Appointment required for all inspections am/pm is not guaranteed without appointment. Larger systems taking more than 1 hour will require 48-72hr notice prior to scheduling. Inspections are Monday - Thursday, no friday inspections
• Provide plans and permit on site for inspection.
• Complete labor and industries inspections prior to requesting city inspection.
• A remote annunciator located at the main entrance is required. If there is an existing annunciator on the exterior of the building it will need to be moved inside the main entrance. Please contact fire inspector for further information.
• Exterior fire bell required outside fire sprinkler room.
• Above ceiling detection is required.
• Device maps required at the annunciator and fire alarm panel prior to calling in final. The annunciator map will need to be weatherproof.
• Total coverage is required, subject to field inspection. Comply with NFPA 72, 2019
• Fire alarm system shall be placarded per NFPA 72. The UL or ETL certificate shall be posted at time of final inspection. The system will need to be UL certified.
• A pre-test shall be conducted and a printout of the location of the device, point number and descriptor shall be furnished to the inspector at final. Labeling of all devices above and below ceiling required.
• Fire sprinkler tamper valves and PIV will be required to be tested at inspection. Fire sprinkler contractor to be onsite.
• RTU’S and smoke dampeners will be required to be tested during inspection.
• The city of Puyallup allows one FACP per building. The panel will need to be large enough to handle multiple tenants if applicable.
• In existing buildings all above ceiling detection is to remain. Do not remove.
• Due to unforeseeable construction design, all device locations to be field verified for compliance.
Schedule your inspection online through the city of puyallup online permit system after requesting appointment from inspector. Fire Inspections are Monday – Thursday there will be no inspections on Fridays.
David Drake 253-864-4171 ddrake@puyallupwa.gov
|
||
| Possible Contamination Advisory Notice | Open | Standard Conditions |
|
Engineering Division
Please be advised, the subject property may be flagged as a contaminated site by the Washington State Department of Ecology. Further action may or may not be required. As a courtesy, the City of Puyallup is notifying permit applicants of the possible contamination prior to construction. The City is not placing a hold on the development permit or notice against the property title for the possible contamination, but rather informing the permit holder and contractor prior to any ground disturbing activities. Please direct any inquiries or questions regarding the status of the contamination to the Tacoma Pierce County Health Department (TPCHD) by emailing UST@tpchd.org. For more information on contaminated sites, please visit https://www.tpchd.org/healthy-places/contaminated-property-cleanup. No further action is required with the City of Puyallup as it relates to this development permit.
|
||
| Date Uploaded | File Type | Name |
|---|---|---|
| 06/10/2026 | Plans | WAIVER REQUEST |
| 06/10/2026 | Receipt | Receipt for transaction:2026-001065 |
| 06/29/2026 | Form | Fire Code Permit Application - Centeris Row-D (Flattened) |
| 06/29/2026 | Plans | Fire alarm Data Sheets - Centeris Row-D (Flattened) |
| 06/30/2026 | Plans | ALARM PLANS (Stamped) |
| 06/30/2026 | Permit | Permit - Detailed |
| 06/30/2026 | Letter | Permit Job Card |
Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.