Review Type |
Outcome |
Est. Completion Date |
Completed |
Building Review
|
Approved
|
03/26/2025
|
03/10/2025
|
|
|
Engineering Review
|
Approved
|
12/04/2024
|
12/02/2024
|
|
|
Engineering Traffic Review
|
Approved
|
12/04/2024
|
11/20/2024
|
|
|
Building Review
|
Approved
|
12/04/2024
|
11/15/2024
|
|
|
|
See Document Markup
The WSEC energy credits on the WSEC worksheet do not match the credits shown on the plans. Please revise to match. [Reference marked-up document: ENERGY CODE WORKSHEETS - BUILDING H - RESUB]
|
|
See Document Markup
These leaders are missing a note. [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, A5.1]
|
|
See Document Markup
These notes have been partially cut off. [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, A6.1]
|
|
See Document Markup
These notes have been partially cut off. [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, A6.1]
|
|
See Document Markup
Please have the engineer of record correct this drag load to 3,000lbs. [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, S3.4]
|
|
See Document Markup
Please revise this note to conform to the 2018 UPC. [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, P0.02]
|
|
See Document Markup
Please revise these calculations to conform to the 2018 UPC. [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, P0.02]
|
|
See Document Markup
Please revise these calculations to conform to the 2018 UPC. [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, P0.02]
|
|
See Document Markup
Please correct this note to read "2018 UPC". [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, P5.C0]
|
Planning Review
|
Approved
|
12/04/2024
|
11/05/2024
|
|
|
Fire Review
|
Approved
|
12/04/2024
|
11/04/2024
|
|
|
Planning Review
|
Approved
|
10/31/2024
|
10/22/2024
|
|
|
Engineering Review
|
Approved
|
10/31/2024
|
10/11/2024
|
|
|
|
See Document Markup
The applicant is responsible to show onsite private utilities services for each building on a site plan. This includes sewer or septic, storm and water. [Site Plan Sheet 1 of ]
|
Building Review
|
Failed
|
10/31/2024
|
10/10/2024
|
|
|
|
See Document Markup
The WSEC energy credits on the WSEC worksheet do not match the credits shown on the plans. Please revise to match. [Reference marked-up document: ENERGY CODE WORKSHEETS - BUILDING H - RESUB]
|
|
See Document Markup
These leaders are missing a note. [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, A5.1]
|
|
See Document Markup
These notes have been partially cut off. [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, A6.1]
|
|
See Document Markup
These notes have been partially cut off. [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, A6.1]
|
|
See Document Markup
Please have the engineer of record correct this drag load to 3,000lbs. [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, S3.4]
|
|
See Document Markup
Please revise this note to conform to the 2018 UPC. [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, P0.02]
|
|
See Document Markup
Please revise these calculations to conform to the 2018 UPC. [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, P0.02]
|
|
See Document Markup
Please revise these calculations to conform to the 2018 UPC. [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, P0.02]
|
|
See Document Markup
Please correct this note to read "2018 UPC". [Reference marked-up document: CONSTRUCTION PLAN SET - BUILDING C - RESUB, P5.C0]
|
Fire Review
|
Approved
|
10/31/2024
|
10/03/2024
|
|
|
Engineering Traffic Review
|
Approved
|
10/31/2024
|
10/03/2024
|
|
|
Engineering Traffic Review
|
Approved
|
05/15/2024
|
05/14/2024
|
|
|
Building Review
|
Failed
|
05/15/2024
|
05/13/2024
|
|
|
|
Other/Miscellaneous
Reference permit application PRMU20240139 for similar comments.
|
Fire Review
|
Failed
|
05/15/2024
|
05/09/2024
|
|
|
Engineering Review
|
Failed
|
05/15/2024
|
04/04/2024
|
|
|
|
See Document Markup
The applicant is responsible to show onsite private utilities services for each building on a site plan. This includes sewer or septic, storm and water. [Site Plan Sheet 1 of ]
|
Planning Review
|
Failed
|
05/15/2024
|
04/04/2024
|
|
|
|
Add Submittal Item: Lot Combo
Additional Submittal Item Required: Lot Combination Permit Application required. Application form can be downloaded from the City website at https://www.cityofpuyallup.org/DocumentCenter/View/11646/Lot-Combination-Application
|