CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRMU20240400


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRMU20240400
Residential - New Multi-Unit
Permit(s) Issued
EAST TOWN CROSSING LLC
New
BUILDING C 3-story apartment building - EAST TOWN CROSSING - 3002 E PIONEER - BLDG C * REVISION (1) - 2/26/2025 - ENGINEERED TRUSS DRAWINGS
03/12/2024
12/30/2024
10/22/2025

Locations

Property
0420264021

3002 E PIONEER, BUILDING C, PUYALLUP, 98372

Reviews

Review Type Outcome Est. Completion Date Completed
Building Review Approved 03/26/2025 03/10/2025
Engineering Review Approved 12/04/2024 12/02/2024
Engineering Traffic Review Approved 12/04/2024 11/20/2024
Building Review Approved 12/04/2024 11/15/2024
Planning Review Approved 12/04/2024 11/05/2024
Fire Review Approved 12/04/2024 11/04/2024
Planning Review Approved 10/31/2024 10/22/2024
Engineering Review Approved 10/31/2024 10/11/2024
Building Review Failed 10/31/2024 10/10/2024
Fire Review Approved 10/31/2024 10/03/2024
Engineering Traffic Review Approved 10/31/2024 10/03/2024
Engineering Traffic Review Approved 05/15/2024 05/14/2024
Building Review Failed 05/15/2024 05/13/2024
Fire Review Failed 05/15/2024 05/09/2024
Engineering Review Failed 05/15/2024 04/04/2024
Planning Review Failed 05/15/2024 04/04/2024

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 12/26/2024
Planning Landscape Review Fee $300.00 $300.00 Paid 12/26/2024
Appliance Vent - Separate Fee $230.40 $230.40 Paid 12/26/2024
Exhaust Hood/Range Hood - Residential Fee $338.40 $338.40 Paid 12/26/2024
Exhaust Vent Fan (Bath) Fee $676.80 $676.80 Paid 12/26/2024
Suspended, Recessed Wall, or Floor unit Heater Fee $469.20 $469.20 Paid 12/26/2024
Building Permit Fee $11,448.75 $11,448.75 Paid 12/26/2024
Planning Building Permit Fee $120.00 $120.00 Paid 12/26/2024
Plumbing Fixtures Fee $2,834.00 $2,834.00 Paid 12/26/2024
Plumbing Permit Fee $40.00 $40.00 Paid 12/26/2024
Water Heater Fee $312.00 $312.00 Paid 12/26/2024
Mechanical Permit Fee $40.00 $40.00 Paid 12/26/2024
Building Plan Review Fee $7,441.69 $7,441.69 Paid 03/13/2024
Plumbing Plan Review Fee $2,070.90 $2,070.90 Paid 03/13/2024
Mechanical Plan Review Fee $1,140.62 $1,140.62 Paid 03/13/2024
WA State Building Code Council Fee (Residential) $52.50 $52.50 Paid 12/26/2024
Resubmittal Fee $180.00 $180.00 Paid 10/02/2024
Resubmittal Fee $180.00 $180.00 Paid 10/25/2024
Resubmittal Fee $180.00 $180.00 Paid 02/26/2025
Outstanding Fees Amount Paid Owing Date Paid
Water System Development Charge $103,788.05 $0.00 $103,788.05 Not Paid
Sewer System Development Charge $126,184.79 $0.00 $126,184.79 Not Paid
Traffic Impact Fee (Commercial) $47,367.00 $0.00 $47,367.00 Not Paid
Park Impact Fee $73,124.76 $0.00 $73,124.76 Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$350,464.60    Add Fees to My Cart

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection Pending
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection Pending
Underfloor Inspection Pending
Shannon King ((253) 840-6684)
Block Wall Rebar Inspection Pending
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection Pending
Shannon King ((253) 840-6684)
Frame Inspection Pending
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Pending
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Pending
Shannon King ((253) 840-6684)
Gas Test Inspection Pending
Shannon King ((253) 840-6684)
Mechanical Rough In Inspection Pending
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection Pending
Shannon King ((253) 840-6684)
Light Test For Grease Duct Inspection Pending
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection Pending
Shannon King ((253) 840-6684)
Shower Pan Inspection Pending
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection Pending
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs Pending
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection Pending
David Drake ((253) 864-4171)
Engineering Final Inspection Pending
Floodproof Certification Inspection Pending
Elevation Verification Inspection Pending
Planning Final Inspection Pending
Fire Final Inspection Pending
David Drake ((253) 864-4171)
Plumbing Final Inspection Pending
Shannon King ((253) 840-6684)
Mechanical Final Inspection Pending
Shannon King ((253) 840-6684)
Building Final Inspection Pending
Shannon King ((253) 840-6684)
Storm Inspection Pending
Water Service Inspection Pending
Erosion And Sediment Inspection Pending
Corrections:


Other/Miscellaneous
Outstanding
01/07/2025
- Maintain eco pan coverage. - No pumping eco pans into the storm system, sewer, or on the ground. - Maintain site cleanliness, no garbage blowing into the streets or the stream.

Energy (Insulation) Inspection Pending
Shannon King ((253) 840-6684)
Sidesewer Inspection Pending
Slab/Insulation Inspection Pending
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Outstanding
02/27/2025
1 ; interior slab approved only. (complete footings at both entries )

Shear Wall Inspection Pending
Shannon King ((253) 840-6684)
Shear Wall Inspection Pending 4/28/2025
Ted Christie ((253) 507-0191)
Erosion And Sediment Inspection Partial Pass 1/7/2025 01/07/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
01/07/2025
- Maintain eco pan coverage. - No pumping eco pans into the storm system, sewer, or on the ground. - Maintain site cleanliness, no garbage blowing into the streets or the stream.

Footing/Setback Inspection Not Ready 1/16/2025 1/16/2025 01/16/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
01/16/2025
cancel per contractor.

Energy (Insulation) Inspection Partial Pass 2/11/2025 2/11/2025 02/11/2025
Shannon King ((253) 840-6684)
Sidesewer Inspection Partial Pass 2/18/2025 2/18/2025 02/18/2025
Jason Little ((253) 244-0387)
Slab/Insulation Inspection Partial Pass 2/27/2025 2/27/2025 02/27/2025
Shannon King ((253) 840-6684)
Corrections:


Other/Miscellaneous
Carried Forward
02/27/2025
1 ; interior slab approved only. (complete footings at both entries )

Shear Wall Inspection Not Ready 4/25/2025 4/25/2025 04/25/2025
Ted Christie ((253) 507-0191)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Engineering Commercial Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard commercial conditions: ** Prior to STARTING work the applicant shall request an erosion and sediment control inspection using the CityView permit portal at least 48 hours in advance of job start ** ** Sediment control and erosion procedures shall be practiced eliminating and preventing off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See civil permit PRCCP20230970 for specifications ** - Sediment control and erosion procedures shall be practice to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. Attached to the site plan is the city of puyallup’s stormwater fact sheet. or See approved civil plan PRCCPXXX for approved method of control. ** Stormwater control of roof downspouts must be controlled. See civil permit PRCCP20230970 for specifications ** - All commercial development, multi-family, mixed use facility,or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. A double detector check valve assembly (DDCVA) is required is required as directed by the City of Puyallup, Fruitland Mutual Water Company, Tacoma City Water or Valley Water District. - A commercial development must have installed a side sewer sampling tee installed in conformance to city standard section 04.03 – side sewer. - The applicant is responsible to schedule all utility inspections prior to backfilling - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law.- Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived. The Permittee shall defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with activities or operations performed by the Permittee or on the Permittee's behalf out of issuance of this Permit, except for injuries and damages caused by the sole negligence of the Public Entity. However, should a court of competent jurisdiction determine that RCW 4.24.115 applies to this Permit, then the Permittee agrees to defend, indemnify and hold the Public Entity, its officers, officials, employees and volunteers harmless to the maximum extent permitted thereunder. It is further specifically and expressly understood that the indemnification provided herein constitutes the Permittee's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Miscellaneous Condition Resolved Prior to Issuance
Engineering Division
Civil permit PRCCP20230970 must be issued prior to the release of this building permit. LL 4/04/2024 A Phase 2 Civil Permit PRCCP20240808 is required to be issued before the building permit can be released. Phase 2 watermain construction is required prior to vertical combustible construction.
Miscellaneous Condition Open Prior to Occupancy
Engineering Division
All work associated with civil permit PRCCP20230970 must be completed and a final approval granted prior to occupancy. LL 4/04/2024
Miscellaneous Condition Resolved Standard Conditions
Traffic Division
The city has adopted a City-Wide Traffic Impact Fee of $4500 per PM peak hour trip. The $4,500 traffic impact fee per PM peak hour trip shall be paid prior to building occupancy. The City policy requires the project trips to be estimated using the Institute of Transportation Engineers’ (ITE) Trip Generation, 11th Edition. The project’s proportionate share to this fee program is based on the ITE land use code 220 - Multifamily Low-Rise with an estimated internal capture rate of 14% for the projected Retail Plaza, based on the submitted Traffic Scoping document dated 2/25/2022. This trip generation assumption will be reevaluated by the City, prior to occupancy. Evaluation will determine the type of Commercial/Retail use, pass by trips, internal capture and final traffic impact fees. 24 Unit total LUC 220 rate = 0.51 pm peak hour trips per unit 24 x 0.51 x $4500 = $55,080 Recalculated TIF to include 14% internal capture rate - 55,080 minus 14% = $47,368.80 [Mieco Hutchens @ 12/11/2024 8:20 AM]
Miscellaneous Condition Open Standard Conditions
Traffic Division
Park impact fee was established by Ordinance 3142 dated July 3, 2017 and shall be charged per new dwelling unit based on its size: Park Impact Fee (Per residential dwelling Unit): Less than 500 sqft $1,560.05 500 - 999 sqft $2,313.53 1,000 – 1,999 sqft $3,291.31 2,000 sqft or more $4,017.30 24 Unit total 6 units 500-999 sqft = $13,881.18 18 units 1000-1999 sqft = $59,243.58
Miscellaneous Condition Resolved Prior to Issuance
Development & Permitting Services
BEFORE PERMIT CAN BE ISSUED - APPLICANT MUST PROVIDE THE RECORDED LIEN DOCUMENT FROM PIERCE CO ASSOCIATED WITH THE DEVELOPMENT AND IMPACT FEE DEFERRAL RECORDED DOCUMENTS RECEIVED [Jeannesha Frazier @ 10/31/2024 9:03 AM]
Ready to Issue - Need School District Letter Resolved Prior to Issuance
Development & Permitting Services
Must provide letter from Puyallup School District stating that school impact fees have been paid. 12.16.24 RECIEVED PSD LETTER/ATTACHED [Jeannesha Frazier @ 12/16/2024 11:00 AM]
Payment of Deferred Impact Fees Open Prior to Completion
Development & Permitting Services
Payment of Deferred Impact Fees must be paid within 18 months of permit issuance or prior to scheduling Final Building Inspection (which ever comes first).
Stormwater Maintenance Agreement (SWA) Open Prior to Occupancy
Engineering Division
The approved Stormwater Maintenance Agreement shall be recorded prior to the City granting a certificate of occupancy. Once recorded, provide the City with the Auditor File Number (AFN) for verification.
Miscellaneous Condition Resolved Prior to Occupancy
Development & Permitting Services
According to PMC Chapter 19.06.020, contiguous parcels are required to be combined when they share common facilities including but not limited to access, parking, utilities, open space, landscaping, signage, etc., for which no easements or other legal instruments exist to ensure continuous ownership, use and maintenance of such facilities. In this particular case, the East Town Crossing parcels share such facilities including driveway access, parking, landscaping, trash enclosures, and utilities. Prior to building permit issuance, the applicant shall apply for and provide a recorded legal instrument for the continuous ownership, use, and maintenance of the common facilities in compliance with Puyallup Municipal Code. Ken Cook, Development Engineering manager, directed that this condition only apply to the final building permit associated with this development. [Yianni Charitou @ 03/27/2025 4:08 PM]

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20230970 Permit(s) Issued Civil Construction Permit
PRGR20230972 Permit(s) Issued Clear, Fill, & Grade Permit
PRHM20231330 Closed Hydraulic Modeling
PRCNC20231714 Canceled Commercial - New Construction
PRMU20240139 Permit(s) Issued Residential - New Multi-Unit
PRHM20240180 Closed Hydraulic Modeling
PRMU20240401 Permit(s) Issued Residential - New Multi-Unit
PRMU20240402 Permit(s) Issued Residential - New Multi-Unit
PRMU20240404 Permit(s) Issued Residential - New Multi-Unit
PRMU20240405 Permit(s) Issued Residential - New Multi-Unit
PRMU20240406 Permit(s) Issued Residential - New Multi-Unit
PRMU20240407 Returned for Correction Residential - New Multi-Unit
PRGR20240491 Permit(s) Issued Clear, Fill, & Grade Permit
PRCCP20240569 Permit(s) Issued Civil Construction Permit
PRCCP20240808 Permit(s) Issued Civil Construction Permit
PRFS20241973 Permit(s) Issued Fire Sprinklers
PRFS20250031 Permit(s) Issued Fire Sprinklers
PRFS20250098 Permit(s) Issued Fire Sprinklers
PRFS20250099 Permit(s) Issued Fire Sprinklers
PRFS20250371 Permit(s) Issued Fire Sprinklers
PRCTI20250375 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRRWF20250442 Returned for Correction Retaining Wall
PRFS20250456 In Plan Check Fire Sprinklers
PRFS20250522 In Plan Check Fire Sprinklers
PRCNC20250528 In Plan Check Commercial - New Construction
P-20-0027 Expired SEPA Standalone
P-20-0042 Expired MISCELLANEOUS PLANNING PERMIT
P-20-0028 Expired MISCELLANEOUS PLANNING PERMIT
L-20-0002 Expired Comprehensive Plan Amendment
P-20-0077 Expired Pre-Application
P-21-0025 Expired Short Plat
P-21-0034 File Closed Preliminary Site Plan
P-19-0010 Canceled Development Agreement
P-20-0031 Expired Pre-Application
PLBDJ20240103 Waiting for Conditions Boundary Line Adjustment

Documents & Images

No documents are currently available for viewing.


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.