CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRCTI20250375


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCTI20250375
Commercial - Tenant Improvement/Remodel
Permit(s) Issued
EAST TOWN CROSSING LLC
Alteration/Remodel
Unconditioned covered amenity structure. No Mechanical Systems and No Plumbing. Covers mailboxes, delivery kiosk, electrical equipment and miscellaneous items. - EAST TOWN CROSSING - 3002 E PIONEER
03/17/2025
04/24/2025
11/11/2025

Locations

Property
0420264021

3002 E PIONEER, PUYALLUP WA 98372

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 04/29/2025 04/22/2025
Fire Review Approved 04/29/2025 04/21/2025
Engineering Traffic Review Approved 04/29/2025 04/16/2025
Planning Review Approved 04/29/2025 04/15/2025
Design Review VOID 04/29/2025 04/15/2025
Building Review Approved 04/29/2025 04/15/2025
Engineering Review Approved 04/16/2025 04/07/2025
Fire Review Approved 04/16/2025 04/04/2025
Engineering Traffic Review Approved 04/16/2025 04/03/2025
Building Review Failed 04/16/2025 03/31/2025
Planning Review Approved 04/16/2025 03/24/2025
Design Review VOID 04/16/2025 03/20/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $265.00 Paid 04/23/2025
Building Permit Fee $1,049.75 $1,049.75 Paid 04/23/2025
Building Plan Review Fee $682.34 $682.34 Paid 03/17/2025
WA State Building Code Council Fee (Commercial) $25.00 $25.00 Paid 04/23/2025
Resubmittal Fee $180.00 $180.00 Paid 04/11/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Comment Building Div Inspection Pending
Shannon King ((253) 840-6684)
Comment Engineering Div Inspection Pending
Underfloor Inspection Pending
Shannon King ((253) 840-6684)
Slab/Insulation Inspection Pending
Shannon King ((253) 840-6684)
Block Wall Rebar Inspection Pending
Shannon King ((253) 840-6684)
Shear Wall Inspection Pending
Shannon King ((253) 840-6684)
Firewall/Firestop Inspection Pending
Shannon King ((253) 840-6684)
Energy (Insulation) Inspection Pending
Shannon King ((253) 840-6684)
Frame Inspection Pending
Shannon King ((253) 840-6684)
Ceiling Grid/T-Bar Inspection Pending
Shannon King ((253) 840-6684)
Wallboard / Drywall Inspection Pending
Shannon King ((253) 840-6684)
Re-Roof Inspection Pending
Shannon King ((253) 840-6684)
Refrigeration Line Test Inspection Pending
Shannon King ((253) 840-6684)
Exhaust/Vent Fans Inspection Pending
Shannon King ((253) 840-6684)
Fire Or Smoke Damper Inspection Pending
David Drake ((253) 864-4171)
Hydrostatic Test 200Lbs 2Hrs Pending
David Drake ((253) 864-4171)
Emergency Radio Test Review Inspection Pending
David Drake ((253) 864-4171)
Engineering Final Inspection Pending
Planning Final Inspection Pending
Fire Final Inspection Pending
David Drake ((253) 864-4171)
Building Final Inspection Pending
Shannon King ((253) 840-6684)
Erosion And Sediment Inspection Pending
Corrections:


Other/Miscellaneous
Outstanding
05/01/2025
- Please look at streets daily for spalls. 1 block each direction of the intersection at Shaw and Pioneer. - Please ask all contractors to slow down on site due to the dust. (personal rigs, contractor trucks and vans)

Footing/Setback Inspection Pending
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Pending
Shannon King ((253) 840-6684)
Erosion And Sediment Inspection Partial Pass 5/1/2025 5/1/2025 05/01/2025
Jason Little ((253) 244-0387)
Corrections:


Other/Miscellaneous
Carried Forward
05/01/2025
- Please look at streets daily for spalls. 1 block each direction of the intersection at Shaw and Pioneer. - Please ask all contractors to slow down on site due to the dust. (personal rigs, contractor trucks and vans)

Footing/Setback Inspection Not Ready 5/7/2025 5/7/2025 05/07/2025
Shannon King ((253) 840-6684)
Foundation/Rebar Inspection Not Ready 5/7/2025 5/7/2025 05/07/2025
Shannon King ((253) 840-6684)
Footing/Setback Inspection Not Ready 5/14/2025 5/14/2025 05/14/2025
Ted Christie ((253) 507-0191)
Foundation/Rebar Inspection Not Ready 5/14/2025 5/14/2025 05/14/2025
Ted Christie ((253) 507-0191)
Foundation/Rebar Inspection Passed w/ Conditions 5/15/2025 5/15/2025 05/15/2025
Ted Christie ((253) 507-0191)
Footing/Setback Inspection Passed w/ Conditions 5/15/2025 5/15/2025 05/15/2025
Ted Christie ((253) 507-0191)

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS. 2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE. 3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE. 4. KNOX BOXES, WHEN REQUIRED, SHALL BE INSTALLED USUALLY TO THE RIGHT OF THE MAIN FRONT DOOR AND NO HIGHER THAN 6 FEET OFF OF THE GROUND. ONLY HINGED KNOX BOXES SHALL BE USED. KNOX BOXES AND KEY SWITCHES CAN BE ORDERED ONLINE AT THE "KNOX COMPANY" 5. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.
Engineering Commercial Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard commercial conditions: - Prior to starting site work request an inspection for erosion and sediment. - Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20230970 for approved method of control. - Stormwater control of roof downspouts required. - Steps shall be taken to prevent drainage onto adjacent lots. - No proposed footings, posts, or supports shall be constructed on or above any existing public utility connections without first relocating the utility services or protecting it in place. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. - Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Williams Gas Pipeline Survey Open Standard Conditions
Engineering Division
In accordance with RCW 19.27 and RCW 19.122, any project within 100-ft of a major utility transmission line, including hazardous liquid or gas pipelines, shall provide notice to the utility operator. Prior to permit issuance, provide written documentation from the operator/owner of the Northwest Pipeline LLC (Williams Gas Main) that the proposed development is acceptable as designed. (Contact Williams Gas' Matthew Kautzman at matt.kautzman@williams.com or 253-377-6146.)
Miscellaneous Condition Resolved Prior to Issuance
Engineering Division
Building permit PRCTI20250375 cannot be issued until civil construction permit PRCCP20230970 is issued first. The building permit site plan must match the approved civil plan. [Yianni Charitou @ 03/27/2025 8:44 AM] PRCCP20230970 issued on 6/12/2024. [Yianni Charitou @ 04/07/2025 4:06 PM]
FEMA Floodplain - AE Flood Zone - Commercial Resolved Prior to Occupancy
Engineering Division
This property lies within a regulated flood zone. According to the FEMA LOMR Case Number 21-10-0191P issued on April 27, 2022 and effective September 8, 2022, the flooding zone has been revised and the proposed building is no longer within the AE flood zone. [Yianni Charitou @ 04/07/2025 3:55 PM]

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20230970 Permit(s) Issued Civil Construction Permit
PRGR20230972 Permit(s) Issued Clear, Fill, & Grade Permit
PRHM20231330 Closed Hydraulic Modeling
PRCNC20231714 Canceled Commercial - New Construction
PRMU20240139 Permit(s) Issued Residential - New Multi-Unit
PRHM20240180 Closed Hydraulic Modeling
PRMU20240400 Permit(s) Issued Residential - New Multi-Unit
PRMU20240401 Permit(s) Issued Residential - New Multi-Unit
PRMU20240402 Permit(s) Issued Residential - New Multi-Unit
PRMU20240404 Permit(s) Issued Residential - New Multi-Unit
PRMU20240405 Permit(s) Issued Residential - New Multi-Unit
PRMU20240406 Permit(s) Issued Residential - New Multi-Unit
PRMU20240407 Returned for Correction Residential - New Multi-Unit
PRGR20240491 Permit(s) Issued Clear, Fill, & Grade Permit
PRCCP20240569 Permit(s) Issued Civil Construction Permit
PRCCP20240808 Permit(s) Issued Civil Construction Permit
PRFS20241973 Permit(s) Issued Fire Sprinklers
PRFS20250031 Permit(s) Issued Fire Sprinklers
PRFS20250098 Permit(s) Issued Fire Sprinklers
PRFS20250099 Permit(s) Issued Fire Sprinklers
PRFS20250371 Permit(s) Issued Fire Sprinklers
PRRWF20250442 Returned for Correction Retaining Wall
PRFS20250456 Permit(s) Issued Fire Sprinklers
PRFS20250522 Permit(s) Issued Fire Sprinklers
PRCNC20250528 In Plan Check Commercial - New Construction
PRFA20250599 In Plan Check Fire Alarms
P-20-0027 Expired SEPA Standalone
P-20-0042 Expired MISCELLANEOUS PLANNING PERMIT
P-20-0028 Expired MISCELLANEOUS PLANNING PERMIT
L-20-0002 Expired Comprehensive Plan Amendment
P-20-0077 Expired Pre-Application
P-21-0025 Expired Short Plat
P-21-0034 File Closed Preliminary Site Plan
P-19-0010 Canceled Development Agreement
P-20-0031 Expired Pre-Application
PLBDJ20240103 Waiting for Conditions Boundary Line Adjustment

Documents & Images

Date Uploaded File Type Name
03/17/2025 Receipt Receipt for transaction:2025-000513
04/08/2025 Letter Permit Review Correction Letter
04/08/2025 Form Application_ETC_Covered Amenity Structure0 (Flattened)
04/11/2025 Receipt Receipt for transaction:2025-000703
04/23/2025 Plans CONSTRUCTION PLANS - RESUB (Stamped)
04/23/2025 Report STRUCTURAL ANALYSIS - RESUB (Stamped)
04/23/2025 Map VICINITY MAP (Stamped)
04/23/2025 Receipt Receipt for transaction:2025-000791
04/24/2025 Permit Permit - Detailed
05/01/2025 Report Inspection Report (Erosion And Sediment Inspection)
05/07/2025 Report Inspection Report (Footing/Setback Inspection)
05/07/2025 Report Inspection Report (Foundation/Rebar Inspection)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.