CITY OF PUYALLUP PERMITTING PORTAL

Permit Application Status

PRRWF20250442


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRRWF20250442
Retaining Wall
Returned for Correction
EAST TOWN CROSSING LLC
New
Retaining walls at East Town Crossing - EAST TOWN CROSSING
03/31/2025

Locations

Reviews

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Engineering Review Failed 04/23/2025 04/17/2025
Building Review Failed 04/23/2025 04/16/2025
Planning Review Failed 04/23/2025 04/15/2025
Engineering Civil Review Failed 04/23/2025 04/15/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Building Plan Review Fee $190.61 $190.61 Paid 03/31/2025
Outstanding Fees Amount Paid Owing Date Paid
Building Permit Fee $293.25 $0.00 Not payable Not Paid
Resubmittal Fee $180.00 $0.00 $180.00 Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$180.00    Add Fees to My Cart

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Engineering Commercial Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard commercial conditions: - Prior to starting site work request an inspection for erosion and sediment. - Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20230970 and PRCCP20240569 for approved method of control. - Stormwater control of roof downspouts required. - Steps shall be taken to prevent drainage onto adjacent lots. - No proposed footings, posts, or supports shall be constructed on or above any existing public utility connections without first relocating the utility services or protecting it in place. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. - Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Williams Gas Pipeline Survey Open Standard Conditions
Engineering Division
In accordance with RCW 19.27 and RCW 19.122, any project within 100-ft of a major utility transmission line, including hazardous liquid or gas pipelines, shall provide notice to the utility operator. Prior to permit issuance, provide written documentation from the operator/owner of the Northwest Pipeline LLC (Williams Gas Main) that the proposed development is acceptable as designed. (Contact Williams Gas' Matthew Kautzman at matt.kautzman@williams.com or 253-377-6146.)
Miscellaneous Condition Open Prior to Issuance
Engineering Division
Building permit PRCTI20250375 cannot be issued until civil construction permits PRCCP20230970 and PRCCP20240569 are issued first. The building permit site plan must match the approved civil plan. [Yianni Charitou @ 03/27/2025 8:44 AM] PRCCP20230970 issued on 6/12/2024, but PRCCP20240569 is still under review. [Yianni Charitou @ 04/07/2025 4:06 PM]
FEMA Floodplain - Anchoring Open Standard Conditions
Engineering Division
The subject property is within a Regulated FEMA Flood Zone. According to NFIP Requirements 44 CFR 60.3(a)(3), “…If a proposed building site is in a flood-prone area, all new construction and substantial improvements shall (i) be designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy….” It is the builder’s responsibility to adequately secure any retaining walls in the flood zone to prevent flotation, collapse and lateral movement during the base flood in accordance with FEMA’s NFIP standards.

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20230970 Permit(s) Issued Civil Construction Permit
PRGR20230972 Permit(s) Issued Clear, Fill, & Grade Permit
PRHM20231330 Closed Hydraulic Modeling
PRCNC20231714 Canceled Commercial - New Construction
PRMU20240139 Permit(s) Issued Residential - New Multi-Unit
PRHM20240180 Closed Hydraulic Modeling
PRMU20240400 Permit(s) Issued Residential - New Multi-Unit
PRMU20240401 Permit(s) Issued Residential - New Multi-Unit
PRMU20240402 Permit(s) Issued Residential - New Multi-Unit
PRMU20240404 Permit(s) Issued Residential - New Multi-Unit
PRMU20240405 Permit(s) Issued Residential - New Multi-Unit
PRMU20240406 Permit(s) Issued Residential - New Multi-Unit
PRMU20240407 Returned for Correction Residential - New Multi-Unit
PRGR20240491 Permit(s) Issued Clear, Fill, & Grade Permit
PRCCP20240569 Permit(s) Issued Civil Construction Permit
PRCCP20240808 Permit(s) Issued Civil Construction Permit
PRFS20241973 Permit(s) Issued Fire Sprinklers
PRFS20250031 Permit(s) Issued Fire Sprinklers
PRFS20250098 Permit(s) Issued Fire Sprinklers
PRFS20250099 Permit(s) Issued Fire Sprinklers
PRFS20250371 Permit(s) Issued Fire Sprinklers
PRCTI20250375 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRFS20250456 In Plan Check Fire Sprinklers
PRFS20250522 In Plan Check Fire Sprinklers
PRCNC20250528 In Plan Check Commercial - New Construction
P-20-0027 Expired SEPA Standalone
P-20-0042 Expired MISCELLANEOUS PLANNING PERMIT
P-20-0028 Expired MISCELLANEOUS PLANNING PERMIT
L-20-0002 Expired Comprehensive Plan Amendment
P-20-0077 Expired Pre-Application
P-21-0025 Expired Short Plat
P-21-0034 File Closed Preliminary Site Plan
P-19-0010 Canceled Development Agreement
P-20-0031 Expired Pre-Application
PLBDJ20240103 Waiting for Conditions Boundary Line Adjustment

Documents & Images

Date Uploaded File Type Name
03/31/2025 Receipt Receipt for transaction:2025-000615
04/18/2025 Letter Permit Review Correction Letter
04/18/2025 Form Application-for-Building-Permit- (Flattened)
04/18/2025 Plans ETC Cover (Flattened)
04/18/2025 Plans 25-006-01 East Town Crossing R1 2025-04-02 (Flattened)
04/18/2025 Report DESIGN CALCULATIONS East Town Crossing (Flattened)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.