Permit Application Status

PRCNC20251084


In order to request inspections, you need to be signed in.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRCNC20251084
Commercial - New Construction
Returned for Correction
EAST TOWN CROSSING LLC
New
covered trash enclosure shared by the commercial lot 1 and lot 2, - 731 SHAW RD
08/12/2025

Locations

Property
0420264021

731 SHAW RD PUYALLUP, WA. 98372

Reviews

Review Type Outcome Est. Completion Date Completed
Design Review Approved 10/03/2025 09/19/2025
Engineering Review Failed 10/03/2025 09/18/2025
Fire Review Approved 10/03/2025 09/09/2025
Planning Review Approved 10/03/2025 09/09/2025
Design Review VOID 10/03/2025 09/09/2025
Engineering Traffic Review Approved 10/03/2025 09/04/2025
Building Review Failed 10/03/2025 09/04/2025
Engineering Completeness Check Incomplete 08/28/2025 08/18/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Building Plan Review Fee $627.74 $627.74 Paid 08/15/2025
Outstanding Fees Amount Paid Owing Date Paid
Fire Review Fee (Commercial Building) $265.00 $0.00 Not payable Not Paid
Planning Landscape Review Fee $300.00 $0.00 Not payable Not Paid
Building Permit Fee $965.75 $0.00 Not payable Not Paid
Planning Building Permit Fee $120.00 $0.00 Not payable Not Paid
WA State Building Code Council Fee (Commercial) $25.00 $0.00 Not payable Not Paid
Sewer System Development Charge $878.36 $0.00 Not payable Not Paid
$6,555.06
Water System Development Charge $903.08 $0.00 Not payable Not Paid
$5,391.59
Resubmittal Fee $180.00 $0.00 $180.00 Not Paid


Permit(s) will not be issued until outstanding fees have been paid in full. Fee details shown above only include currently payable fees, there might be addtional fees to be paid before issuance.

$180.00    Add Fees to My Cart

Inspections

There are no inspections for this permit application, or you are not authorized to view them.

Conditions

Condition Status Category
Building Permit Standard Conditions Open Standard Conditions
Building Division
* Final approval by the Building Official is required prior to use or occupancy.* Work shall not proceed until the inspector has approved the stages of construction.* Surface storm water shall be diverted from the building site and shall not drain onto adjacent properties.* I hereby acknowledge that I have read this Permit/Application, that the information given is correct; that I am the owner or the duly authorized agent of the owner; that plans submitted herewith are in compliance with all applicable city, county and state laws and that all construction will proceed in accordance with said laws. This permit shall expire if work is not commenced with 180 days or if the work is suspended for a period of 180 days. Permits expire two years from issuance. * By leaving the contractor information section blank, I hereby certify further that contractors (general or subcontractors) will not be hired to perform any work in association with this permit. I also certify that if I do choose to hire a contractor (general or subcontractor) I will only hire those contractors that are licensed by the State of Washington. If you are a property owner, contractor or permittee and you are paying for someone to perform the work, they must have a valid contractor registration and the person(s) installing plumbing inside a structure must meet the plumbing certification requirements. If you have any questions regarding these regulations, you may contact the Washington State Department of Labor and Industries or you can find more information on-line at: http://www.lni.wa.gov/TradesLicensing/Contractors/HireCon/default.asp
Fire Review Conditions Open Standard Conditions
1. INSTALL ADDRESS NUMBERS PER THE FOLLOWING DISTANCES:0-50FOOT SETBACK FROM STREET NUMBERS SHALL BE 6 INCHES IN HEIGHT; 51-100 FEET 12 INCHES IN HEIGHT. ALL NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDITIONAL NUMBERS MAY BE NEEDED AT DRIVEWAY ENTRANCE IF BUILDING NUMBERS ARE NOT VISIBLE FROM THE STREET. REAR DOORS OF SUITES OR UNITS SHALL ALSO BE LABELED WITH MINIMUM 4 INCH NUMBERS. 2. FIRE HYDRANTS REQUIRED FOR CONSTRUCTION AND FIRE DEPARTMENT ACCESS SHALL BE INSTALLED AND APPROVED BY THE FIRE CODE OFFICIAL PRIOR TO THE STORAGE OR INSTALLATION OF ANY COMBUSTIBLE FRAMING MATERIAL. ACCESS ROADWAY SURFACES SHALL BE DESIGNED TO CITY STANDARDS AND BE DESIGNED TO MAINTAIN THE IMPOSED LOADS OF A 80,000 POUND FIRE APPARATUS. ASPHALT TREATED BASE, ASPHALT OR CONCRETE PAVEMENT CAN BE USED TO PROVIDE THE REQUIRED ALL-WEATHER DRIVING SURFACE. 3. ANY REQUIRED FIRE LANE MARKINGS SHALL BE INSTALLED PRIOR TO FINAL INSPECTION AND PER CITY ORDINANCE. 4. KNOX BOXES, WHEN REQUIRED, SHALL BE INSTALLED USUALLY TO THE RIGHT OF THE MAIN FRONT DOOR AND NO HIGHER THAN 6 FEET OFF OF THE GROUND. ONLY HINGED KNOX BOXES SHALL BE USED. KNOX BOXES AND KEY SWITCHES CAN BE ORDERED ONLINE AT THE "KNOX COMPANY" 5. FIRE EXTINGUISHERS WILL BE REQUIRED PER CHAPTER 9 OF THE INTERNATIONAL FIRE CODE. GENERALLY, 1 FIRE EXTINGUISHER WITH A MINIMUM RATING OF 2A 10BC SHALL BE INSTALLED PER EVERY 3,000 SQUARE FEET OF FLOOR AREA. THE LOCATION OF THE FIRE EXTINGUISHERS SHALL BE NEAR THE EXIT DOORS AND TRAVEL DISTANCE TO AN EXTINGUISHER SHALL NOT EXCEED 75 FEET. ADDITIONAL SIGNAGE MAY BE NECESSARY TO INDICATE THE FIRE EXTINGUISHER LOCATION.
Engineering Commercial Standard Conditions Open Standard Conditions
Engineering Division
Development Engineering standard commercial conditions: - Prior to starting site work request an inspection for erosion and sediment. - Sediment control and erosion procedures shall be practiced to eliminate and prevent off site damage. Stormwater runoff originating upgrade of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure. See approved civil plan PRCCP20230970 for approved method of control. - Stormwater control of roof downspouts required. - Steps shall be taken to prevent drainage onto adjacent lots. - All commercial development, multi-family, mixed use facility, or irrigation systems water service connections must have installed an approved backflow prevention assembly installed as directed by the Puyallup Municipal Code 14.02.220(3) and conforming to city standard section 03.04 - backflow installation. - The applicant is responsible to schedule all utility inspections prior to backfilling - Curb, gutter, sidewalk, and approach must be poured per city standards. - Driveway approach must be a minimum of 30' wide. - The builder/owner shall be responsible for keeping the existing right-of-way free of debris and dirt. Any violation of PMC chapter 21.14 pertaining to clearing, filling, and grading, erosion and sediment control, and storm water discharges shall be prosecuted to the fullest extent of the law. - Any addition/expansion to the footprint of the building including decks and porches not originally shown on the approved set of plans must obtain proper permits prior to construction. - The applicant is responsible to call the utility notification center at 1-800-424-5555 before beginning any excavation. Call before you dig, it's the law. - No work shall be done in or on the public right of way without a licensed and bonded contractor first obtaining a right of way permit. - Any code requirement that may have been overlooked in this plan review does not imply that the requirements have been waived.
Backflow Protection Device - Commercial RPBA Open Prior to Completion
Engineering Division
An approved reduced pressure backflow assembly (RPBA) device is required to be installed on the commercial water service per City Standard Detail 03.04.02. For more information, visit https://www.cityofpuyallup.org/1131/Backflow-Prevention-Cross-Connection. Upon approval of the installation by the city inspector, the backflow device shall be tested by a Washington State certified backflow assembly tester, and the test report results shall be submitted to the City prior to occupancy of the building.
FEMA Floodplain - AE Flood Zone - Commercial Resolved Prior to Completion
Engineering Division
This property lies within a regulated flood zone. According to the FEMA LOMR Case Number 21-10-0191P issued on April 27, 2022 and effective September 8, 2022, the flooding zone has been revised and the proposed building is no longer within the AE flood zone.
Miscellaneous Condition Open Prior to Completion
Engineering Division
Building permit PRCNC20251084 cannot be issued until civil construction permit PRCCP20230970 is issued first. Moreover, occupancy will not be granted until civil construction permit PRCNC20251084 has been completed and the final inspection has been passed. [Yianni Charitou @ 03/06/2025 10:38 AM]
Latecomer Agreement Resolved Prior to Issuance
Engineering Division
Per Puyallup Municipal Code Chapter 11.24, the property is subject to two recorded sanitary sewer latecomer's agreements. The property owner will be required to submit a development contribution latecomer fee for the Viking JV, LLC sanitary sewer main extension and sanitary sewer lift station/force main as defined in latecomer's agreements recorded under AFNs 202107061306 and 202406210039, respectively. The latecomer's development contribution fees have been assessed on building permit application PRCNC20241917. Latecomer contribution fees paid under PRCNC20241917 on 3/13/2025. [Yianni Charitou @ 03/18/2025 12:30 PM]

Related Permit & Planning Applications

Reference Number Status Type
PRCCP20230970 Permit(s) Issued Civil Construction Permit
PRGR20230972 Permit(s) Issued Clear, Fill, & Grade Permit
PRHM20231330 Closed Hydraulic Modeling
PRCNC20231714 Canceled Commercial - New Construction
PRMU20240139 Permit(s) Issued Residential - New Multi-Unit
PRHM20240180 Closed Hydraulic Modeling
PRMU20240400 Permit(s) Issued Residential - New Multi-Unit
PRMU20240401 Permit(s) Issued Residential - New Multi-Unit
PRMU20240402 Permit(s) Issued Residential - New Multi-Unit
PRMU20240404 Permit(s) Issued Residential - New Multi-Unit
PRMU20240405 Permit(s) Issued Residential - New Multi-Unit
PRMU20240406 Permit(s) Issued Residential - New Multi-Unit
PRMU20240407 Permit(s) Issued Residential - New Multi-Unit
PRGR20240491 Permit(s) Issued Clear, Fill, & Grade Permit
PRCCP20240569 Permit(s) Issued Civil Construction Permit
PRCCP20240808 Permit(s) Issued Civil Construction Permit
PRFS20241973 Closed Fire Sprinklers
PRFS20250031 Closed Fire Sprinklers
PRFS20250098 Permit(s) Issued Fire Sprinklers
PRFS20250099 Closed Fire Sprinklers
PRFS20250371 Permit(s) Issued Fire Sprinklers
PRCTI20250375 Permit(s) Issued Commercial - Tenant Improvement/Remodel
PRRWF20250442 Closed Retaining Wall
PRFS20250456 Permit(s) Issued Fire Sprinklers
PRFS20250522 Permit(s) Issued Fire Sprinklers
PRCNC20250528 Permit(s) Issued Commercial - New Construction
PRFA20250599 Closed Fire Alarms
PRFA20250684 Closed Fire Alarms
PRCNC20250692 Permit(s) Issued Commercial - New Construction
PRCP20250695 Closed Carport
PRFA20250795 Permit(s) Issued Fire Alarms
PRFA20250797 Closed Fire Alarms
PRSG20250876 Permit(s) Issued Sign/Awning
PRSG20250877 Permit(s) Issued Sign/Awning
PRSG20250878 Permit(s) Issued Sign/Awning
PRCP20250899 Permit(s) Issued Carport
PRCP20250900 Permit(s) Issued Carport
PRCP20250901 Permit(s) Issued Carport
PRCP20250902 Permit(s) Issued Carport
PRCP20250903 Permit(s) Issued Carport
PRCP20250904 Permit(s) Issued Carport
PRCP20250905 Permit(s) Issued Carport
PRCP20250906 Permit(s) Issued Carport
PRCP20250907 Permit(s) Issued Carport
PRCP20250908 Permit(s) Issued Carport
PRCP20250909 Permit(s) Issued Carport
PRCP20250910 Permit(s) Issued Carport
PRCP20250911 Permit(s) Issued Carport
PRCP20250912 Permit(s) Issued Carport
PRCP20250913 Permit(s) Issued Carport
PRFA20250945 Permit(s) Issued Fire Alarms
PRFA20250946 Permit(s) Issued Fire Alarms
PRCP20250957 Permit(s) Issued Carport
PRFA20251007 Permit(s) Issued Fire Alarms
PRFA20251024 Permit(s) Issued Fire Alarms
PRFA20251055 Permit(s) Issued Fire Alarms
PRFS20251153 Permit(s) Issued Fire Sprinklers
PRCNC20251159 In Plan Check Commercial - New Construction
PRPO20251217 In Plan Check Pool/Hot Tub
P-20-0027 Expired SEPA Standalone
P-20-0042 Expired MISCELLANEOUS PLANNING PERMIT
P-20-0028 Expired MISCELLANEOUS PLANNING PERMIT
L-20-0002 Expired Comprehensive Plan Amendment
P-20-0077 Expired Pre-Application
P-21-0025 Expired Short Plat
P-21-0034 File Closed Preliminary Site Plan
P-19-0010 Canceled Development Agreement
P-20-0031 Expired Pre-Application
PLBDJ20240103 File Closed Boundary Line Adjustment

Documents & Images

Date Uploaded File Type Name
08/15/2025 Receipt Receipt for transaction:2025-001606
08/21/2025 Letter Incomplete Submittal Notice
09/19/2025 Letter Permit Review Correction Letter
09/19/2025 Report ETC - Commercial Lots Trash Enclosure - Structural Analysis (Flattened)
09/19/2025 Form Application Form_ETC_Lot 1&2 Trash Enclosure (Flattened)
09/19/2025 Form Trash Hauler Coordination Email0 (Flattened)
09/19/2025 Plans Construction Set_ETC_Lot 1&2 Trash Enclosure (Flattened)
09/19/2025 Form CoP Plumbing Fixture Worksheet (Flattened)


Should you need assistance, please contact the Permit Center at (253) 864-4165 option 1.